background image

VS-GSLG

INSTALLATION GUIDE

UL325 COMPLIANCE REQUIRES THE USE OF CONTACT EDGES 

OR PHOTOELECTRIC CONTROLS ON ALL AUTOMATIC OR 

REMOTELY-CONTROLLED GATE OPERATORS.

USA & Canada (800) 421-1587 & (800) 392-0123

(760) 438-7000 - Toll Free FAX (800) 468-1340

www.linearcorp.com

Содержание VS-GSLG

Страница 1: ...UL325 COMPLIANCE REQUIRES THE USE OF CONTACT EDGES OR PHOTOELECTRIC CONTROLS ON ALL AUTOMATIC OR REMOTELY CONTROLLED GATE OPERATORS USA Canada 800 421 1587 800 392 0123 760 438 7000 Toll Free FAX 800...

Страница 2: ...ons 13 Important Notes for Installation of Master Slave Applications 14 Surge Protector Instructions 14 Control and Accessory Connection Illustrations 15 18 ILLUSTRATIONS Loop Layout Illustration 19 E...

Страница 3: ...operly it may affect the operator performance or greatly shorten the life of the unit The gate should be designed so that airflow through the fabric is ample to prevent wind resistance and drag All ga...

Страница 4: ...UCTIONS NOTE These instructions are for an operator on the right side of the opening when viewed from the inside looking out Left hand installation is simply transposed LOCATING AND INSTALLING POSTS L...

Страница 5: ...owing these instructions Adjust the limit nuts by depressing the detent plate and turning the nuts in the desired direction of travel To allow for addi tional travel in the open direction for instance...

Страница 6: ...VS GSLG OPERATOR INSTALLATION GUIDE 6...

Страница 7: ...HT HAND LSC 1 ON LEFT HAND LSO 1 ON RIGHT HAND CLOSE LIMIT NUT ON LEFT HAND OPEN LIMIT NUT ON RIGHT HAND OPEN LIMIT NUT ON LEFT HAND CLOSE LIMIT NUT ON RIGHT HAND LSO 1 ON LEFT HAND LSC 1 DETENT PLATE...

Страница 8: ...t releasing the spring loaded shifter lever to snap back into the engaged position TORQUE LIMITER ADJUSTMENT Before adjusting the torque limiter make sure the gate is in good working condition One per...

Страница 9: ...R Motors have sealed ball bearings and do not require further lubrication If bearing noise develops after several years of operation bearings should be replaced DRIVE CHAIN AND SPROCKET The main drive...

Страница 10: ...with alarms and flashing lights that may be added to the operator When the switch is in the ON position these devices will start approximately two seconds prior to the operator starting In the OFF po...

Страница 11: ...ain prior to reaching a limit the gate will stop again and this time will sound the emergency alarm and lock out 4 51 CLOSE This function works exactly like the OPEN OBSTRUCTION except that it will on...

Страница 12: ...otentiometer higher by 1 1 2 turns for all 115 Volt AC and 24 Volt DC operators and by 3 4 of a turn higher for all 230 Volt AC operators Additional fine adjustment by 1 4 turns may be necessary to el...

Страница 13: ...ctor wired to the safety loop terminals SHADOW LOOP This indicator is lit when a shadow hold open signal is present This signal is generated by a loop detector wired to the shadow loop terminals This...

Страница 14: ...nd Lock Release Three Second Pre Start Warning Right Left Hand Selections SURGE PROTECTOR INSTRUCTIONS The optional surge protector should be connected to any inputs that have an accessory connected t...

Страница 15: ...VS GSLG OPERATOR INSTALLATION GUIDE 15 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Страница 16: ...VS GSLG OPERATOR INSTALLATION GUIDE 16 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Страница 17: ...VS GSLG OPERATOR INSTALLATION GUIDE 17 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Страница 18: ...VS GSLG OPERATOR INSTALLATION GUIDE 18 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Страница 19: ...VS GSLG OPERATOR INSTALLATION GUIDE 19 LOOP LAYOUT ILLUSTRATION Refer to Connection Descriptions on page 11 and Loop Accessory Connections on page 18 for details...

Страница 20: ...VS GSLG OPERATOR INSTALLATION GUIDE 20 EDGE LAYOUT ILLUSTRATION 1 Refer to Connection Descriptions on page 11 and Contact Edge Connections on page 17 for details...

Страница 21: ...VS GSLG OPERATOR INSTALLATION GUIDE 21 EDGE LAYOUT ILLUSTRATION 2 Refer to Connection Descriptions on page 11 and Contact Edge Connections on page 17 for details...

Страница 22: ...VS GSLG OPERATOR INSTALLATION GUIDE 22 PHOTO EYE ILLUSTRATION Refer to Connection Descriptions on page 11 and Photo Eye Connections on page 17 for details...

Страница 23: ...VS GSLG OPERATOR INSTALLATION GUIDE 23 PICKET GATE ILLUSTRATION Refer to Connection Descriptions on page 11 and Accessory Connections on pages 15 18 for additional details...

Страница 24: ...VS GSLG OPERATOR INSTALLATION GUIDE 24 TRACK GATE ILLUSTRATION...

Страница 25: ...rive sprocket and chain with a piece of chalk Run the operator Then check marks to be sure they match GATE STOPPING PART WAY A Check the clutch setting Do not overtighten B Check adjustment of the max...

Страница 26: ...VS GSLG OPERATOR INSTALLATION GUIDE 26 MODEL VS GSLG MECHANICAL PARTS EXPLODED VIEW...

Страница 27: ...4 x 2 1 4 32 2200 115 Disconnect Spring 33 2400 308 Fender Washer 3 8 34 2400 017 Flat Washer 3 8 35 2400 016 Lock Washer 3 8 36 2400 207 HHCS 3 8 16 x 2 1 2 REF NO PART NO DESCRIPTION 16 2110 700 Idl...

Страница 28: ...rs 2500 2244 1 2 HP 115VAC 1 Phase 2500 2246 1 2 HP 208 230VAC 1 or 3 Phase 2500 2249 1 2 HP 460VAC 3 Phase 2500 2245 1 HP 115VAC 1 Phase REF NO PART NO DESCRIPTION 4 Hitachi Controllers continued 250...

Страница 29: ...st of parameters set at factory Recommended Recommended Function Description Setting Function Description Setting F02 ACCEL TIME 3 0 F002 ACCEL TIME 3 00 F03 DECEL TIME 3 0 F003 DECEL TIME 3 00 A01 SP...

Страница 30: ...and slave operators e s a h P 3 g n i r i W r e w o P s t l o V P H e c n a t s i D x a M l a u D e l g n i S e r i W e g u a G s t l o V P H e c n a t s i D x a M l a u D e l g n i S e r i W e g u a...

Страница 31: ...INEERING CONTROLS The use of local exhaust ventilation is recommended to control emis sions near the source Laboratory samples should be handled in a fumehood Provide mechanical ventilation of confine...

Страница 32: ...lace as necessary Check for proper tension and adjust if required Check all pulley setscrews for tightness and tighten if necessary 3 For operators with internal chain drives inspect chain and sprocke...

Страница 33: ...VS GSLG OPERATOR INSTALLATION GUIDE 33 This page intentionally left blank...

Страница 34: ...cations The customer has been informed that these signs must remain at all times 8 Controls intended for user activation are located at least six feet 6 away from any mov ing part of the gate and wher...

Отзывы: