
Operating Instructions
Pump ZPU 08 ATEX
810-53711-1
Page 22 / 57
Rev.: 003
31/07/2017
2.26.
Initial commissioning / daily start-up
Ensure that:
All safety devices are completely available and functional.
All connections are correctly connected.
All parts are correctly installed.
All warning labels on the machine are completely available, highly visible
and undamaged.
Illegible or missing warning labels are to be replaced without delay.
The machine is correctly earthed.
2.27.
Cleaning
Risk of fire and explosion when using inflammable cleaning agents. Only
use non-flammable cleaning agents suitable for the purpose.
Do not use any aggressive cleaning agents.
Do not use sharp-edged or spark-generating tools for cleaning (e.g. cooling
fins of the motor).
Do not use steam jet or high pressure cleaners. Electrical components may
be damaged. Observe the IP protection class.
Cleaning work on energized components may be carried out by electrical
specialists only.
Do not touch cables or electrical components with wet or damp hands.
Mark damp areas accordingly.
Remove dust accumulations regularly. Do not whirl up dust whilst doing so.
2.28.
Operator obligations
2.29.
Determination of hazards
The operator must determine all hazards resulting from the integration of the pump
into the superordinate machine and the hazards at the location of operation of the
machine, and carry out the measures necessary to ensure safety and health
protection.
Содержание ZPU 08
Страница 1: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 1 57 Rev 003 31 07 2017 ZPU 08 ...
Страница 52: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 52 57 Rev 003 31 07 2017 ...
Страница 53: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 53 57 Rev 003 31 07 2017 ...
Страница 54: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 54 57 Rev 003 31 07 2017 ...
Страница 55: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 55 57 Rev 003 31 07 2017 ...
Страница 56: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 56 57 Rev 003 31 07 2017 ...
Страница 57: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 57 57 Rev 003 31 07 2017 ...