WEEKLY CLEANING INSTRUCTIONS (CONT’D) 

 
4.  Clean unit cavity by brushing away any debris from the sides and bottom of the cavity.  Wipe these 

surfaces with a towel moistened with a non-caustic solution being careful not to get the heating elements 
wet.  DO NOT use water on heating elements.  Allow the unit to dry for one hour before applying power. 

5.  After equipment has been cleaned and allowed to dry, reassemble in reverse order.  Proper placement of 

the finger assemblies is critical to the operation of the unit.  Positioning pin must be aligned with the 
“positioning pin grooves” in the finger assemblies (Figure A).  Bottom fingers DO NOT have positioning pins 
to align with and simply slide on finger track and stop at “finger track stop”. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE A 

 

(Note: Illustration is shown with top cover of unit removed.  This is for illustration purposes only!  Operator 

should never remove the top cover of the unit.)

Positioning Pin 

Positioning Pin Groove 

Finger Assembly 

Содержание 1960 Series

Страница 1: ...ica Technical Support Hotline 800 678 9511 Telephone 260 459 8200 www lincolnfp com operator manual This document includes Safety Notices Specifications Installation Instructions Operating Instruction...

Страница 2: ...the consignee Other Countries Freight terms will be developed and extended on an individual basis Proper and secure storage facilities should be arranged for the unit s if necessary to protect against...

Страница 3: ...ble code requirements Refer to Code References section for more information 5 The fixed supply wiring insulation must be protected against high interior surface temperatures TABLE OF CONTENTS IMPORTAN...

Страница 4: ...0 1964 11 5kW 220V 37 5 3 50 REQUIRED CLEARANCE The unit must have 6 inches 152 mm of clearance from combustible surfaces In case other equipment is located on the right side of the unit a minimum cle...

Страница 5: ...tack the DTF units together 1 Turn each unit off and unplug each unit from its power source 2 Remove the two screws from the Unit Top of the bottom appliance 3 Remove the legs from the top appliance R...

Страница 6: ...all switches should be closed together SPACING The unit must have 6 inches 152mm of clearance from combustible surfaces In case other equipment is located on the right side of the unit a minimum clea...

Страница 7: ...n be used for other menu item programs 3 Programming the unit to desired settings To enter the program mode press and hold the UP BUTTON for 5 seconds The UP and DOWN BUTTONS will light indicating the...

Страница 8: ...ailable selections The BOTTOM I R icon follows the 8 available selections 3 Set TEMPERATURE UNITS C or F a Press and hold BUTTON 1 for 20 seconds to change the C or F value b To change again repeat st...

Страница 9: ...se through previous next parameter in the list b If parameter value is displayed use the UP and DOWN buttons to change the parameter value to within the allowed limits 2 Select the parameter to be adj...

Страница 10: ...s while the appliance is in operation Turn unit off wait 30 minutes for cool down then unplug the unit from its power source 2 Clean exterior surfaces of the appliance by wiping it down with a mild de...

Страница 11: ...n cleaner Let sit for 15 20 minutes use 3M green scrub pad to remove debris Rinse and let dry 2 By releasing the turn fasteners Figure A remove the four Air Wash Assemblies Figure B Please note that t...

Страница 12: ...either end of unit Figure A Slide the Finger Cover from Finger Housing remove Inner Columnating Panel Figure B Clean all pieces with commercial oven cleaner and rinse Allow time to dry before reinstal...

Страница 13: ...ment has been cleaned and allowed to dry reassemble in reverse order Proper placement of the finger assemblies is critical to the operation of the unit Positioning pin must be aligned with the positio...

Страница 14: ...st discuss this need for preventive maintenance with your Authorized Service Company to establish a proper program If there are any questions that the Service Company cannot answer contact Lincoln s T...

Страница 15: ...CT POWER TEMPERATURE HEAT CONVEYOR FAN BURNER HEAT CYCLE READY TIMER INDICATOR RESET HIGH TEMPERATURE HEAT CAUTION HOT SURFACE CLOCK TIME SWITCH TIMER TRANSFORMER DANGEROUS VOLTAGE EQUIPOTENTIALITY GR...

Страница 16: ...DTF 1960 Series Operator Manual 16 LABEL DEFINITIONS CONT D AMPS VOLTS KILOWATTS HR TYPE OF GAS AC COOK TIME SERVICE ACCESSIBILITY PROVIDE MINIMUM REAR AND SIDE CLEARANCE ORIFICE MAIN ORIFICE LOW FIRE...

Страница 17: ...s associated therein null and void This includes any damage costs or legal actions resulting from the installation of any Lincoln commercial cooking equipment in a non commercial application or instal...

Страница 18: ...DTF 1960 Series Operator Manual 18 This page intentionally left blank...

Страница 19: ...DTF 1960 Series Operator Manual 19 This page intentionally left blank...

Страница 20: ...DTF 1960 Series Operator Manual 20...

Отзывы:

Похожие инструкции для 1960 Series