
LINCOLN ELECTRIC
SAE-300® HE Service Manual
72
4.
Using a 1/2” open-end wrench and a 1/2” socket, attach the bolt, nut and lock washer securing
leads to the bottom choke terminal. See Wiring Diagram.
5.
Using a 1/2” open-end wrench and a 1/2”socket, attach the bolt, nut and lock washer securing leads
to the top choke terminal. See Figure F.X. See Wiring Diagram.
6.
Attach the roof and side covers to the machine.
7.
Perform the
Figure F.29 – Choke terminal locations
Содержание SAE-300 HE
Страница 8: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 3 Theory of Operation Figure F 1 Block Diagram ...
Страница 51: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 46 Figure F 13 Rocker w marks ...
Страница 54: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 49 Figure F 14 Brush spring Figure F 15 Windings insulated wedge ...
Страница 55: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 50 Figure F 1 Insulator spring locations Figure F 2 Shaft tube ...
Страница 64: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 59 Figure F 22 Rheostat terminal locations ...
Страница 68: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 63 Figure F 25 Rotor removal ...
Страница 75: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 70 Figure F 28 Sling lift ...
Страница 79: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 74 Figure F 30 Current sense board plug location ...
Страница 83: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 78 Figure F 32 Rheostat terminal locations ...