background image

9 1/4"

10"

18"

  MAX

24" O.C.

LOCKING SCREW

J-BOX

COVER

FRAME-IN

Locate fixture along joist and line up bottom edge of HINGED 

MOUNTING BAR with the bottom of joist and fasten in place.

FOR JOIST SPACING LESS THAN 16” ON CENTER

(TO 12” ON CENTER):

 

•  MOUNTING BAR CHANNELS can be shortened and used as 

nailing legs in tight places. Simply remove INNER BAR from 

holed CHANNEL, bend CHANNEL at appropriate point and use 

extra screw to secure it to the joist.

WIRE-IN

Wire to SUPPLY LEADS. WHITE FIXTURE LEAD to NEUTRAL 

SUPPLY LEAD. BLACK FIXTURE LEAD to HOT (120v) SUPPLY LEAD. 

For 277V connect RED FIXTURE LEAD to HOT SUPPLY LEAD. 

BARE FIXTURE WIRE to SUPPLY GROUND. Use wirenuts (local hard-

ware item). Place all electrical connections in the J-Box and close 

the J-BOX COVER.

NOTE:

 To inspect splices, leave min 8" of lead wire in J-Box.

SWING-UP

Extend MOUNTING BAR to reach opposite joist and fasten in place. 

Adjust fixture to desired position along MOUNTING BAR and lock in 

place using locking screw

 

AIRSEAL

®

 INSTALLATION (optional)

  Install a bead of silicone caulking compound between the  

ceiling opening and edge of HOUSING. Housings are tested in 

accordance with ASTM E 283 (max 2 cfm @ 75 pa) and comply 

with WSEC & MEC when installed as instructed.

CLOSE-IN

Close in ceiling as required.

INSTALLING SOCKET HARNESS

INSTALLING HOUSING TRIMS

FIXTURE TRIM ADJUSTMENT

READ AND UNDERSTAND THESE INSTRUCTIONS bEFORE INSTALLING FIXTURE

This fixture is intended for installation in accordance with the National Electrical Code and local   
regulations. To assure full compliance with local codes and regulations, check with your local electrical 
inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.

Retain these instructions for maintenance reference.

LIGHTOLIER a GENLYTE THOMAS company.

631 Airport Road, Fall River, MA 02720

 

INSTRUCTION SHEET NO.

IS:CICLV

A1099                 Page 1 of 2

INSTALLATION PROCEDURE FOR LOW VOLTAGE 

INSULATED CEILING (TYPE-1C) FRAME-IN-KITS: C4AICLV, C6AICLV

SEE SEPARATE

REFLECTOR TRIM

INSTRUCTION

SHEETS

 J-BOX

 COVER

CHANNEL MOUNTING BAR

HINGED 

MOUNTING BAR

Отзывы: