V2  

4/15/2021

 

12 

Step 16 
Before fasten the top frame with screws “F4”, insert a washer “K” on top of each 
pole.    

 

 

Congratulations!! You’ve finally finish assembling your Motorized Z Table/Bed 

 

 

 

Содержание Z-table/Bed

Страница 1: ...Motorized Z Table Bed Assembly Instruction...

Страница 2: ...V2 4 15 2021 2 Table of Content Introduction 3 What is included 3 Steps to assemble 4 Wire coloring connection 13...

Страница 3: ...uild it The purpose of this power bed is to allow for height adjustment to get better cutting or engraving This manual will walk you through successfully assembling of your kit What is included 1 Bott...

Страница 4: ...V2 4 15 2021 4 Steps to assemble Step 1 Unscrew the three flat head screws to remove the frame from the motor bracket M Step 2 Fastening the stepper motor I to the motor bracket M with screws F1...

Страница 5: ...the belt H to the motor pulley Then fasten the frame back to the motor bracket with the 3 screws shown in Step 1 Step 4 Put back the two bearings and shafts to the frame Note the belt should be coming...

Страница 6: ...r bracket assembly with screws F2 to the bottom frame A Note Please pay attention to the direction Motor should lie on the outside of the bottom frame Step 6 Use Allen key L to fasten belt tensioner D...

Страница 7: ...021 7 Step 7 Fasten the poles E to the bottom frame A with the 4 screws F4 that already attached to the poles Keep the other 4 screws for later use Step 8 Put 4 bearings J to the 4 slots on the bottom...

Страница 8: ...1 8 Step 9 Spread the belt around the frame Insert threaded rod G to the bearings with the belt surrounding the pully Step 10 Adjust the position of belt tensioner D to accomplish the desire tension o...

Страница 9: ...nuts Note Threaded side of the T nuts should face up Important The T nut will provide support to the bed so make sure that all T nuts are LEVEL and also have enough space underneath such that the bed...

Страница 10: ...T nuts Important Make sure The bed doesn t wobble or lay on the stepper motor s upper frame Fix these problems by adjusting the height of the T nuts properly The bed should go thru all threaded rods...

Страница 11: ...V2 4 15 2021 11 Step 14 Place the bearings on top of each of the threaded rods Step 15 Put the upper frame by gently pushing the bearing in the blind holes...

Страница 12: ...V2 4 15 2021 12 Step 16 Before fasten the top frame with screws F4 insert a washer K on top of each pole Congratulations You ve finally finish assembling your Motorized Z Table Bed...

Страница 13: ...V2 4 15 2021 13 Wire coloring connection Wiring the stepper motor For wiring the 2 phase motor Green Black wires to A A on stepper driver Blue Red wires to B B on stepper driver A A B B MOTOR...

Отзывы: