background image

M051-K50-A123

1

2 STACK MULTI-JUNGLE (SM20)

UNPACKING AND ASSEMBLY INSTRUCTIONS

Содержание Pro 9000 Series

Страница 1: ...M051 K50 A123 1 2 STACK MULTI JUNGLE SM20 UNPACKING AND ASSEMBLY INSTRUCTIONS ...

Страница 2: ...ACHINE MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY 9 16 Socket wrench with extension 9 16 Combination wrench Pinch bar You will also need a ladder ASSEMBLY TIME Two people can accomplish this assembly in approximately 1 2 hour UNPACKING Follow the steps below when unpacking the components of the SM20 1 Cut off the shipping wrapper 2 Remove the parts box and shipping boards 3 Remove the items in the ...

Страница 3: ...n assembled SM20 Figure 1 SM20 main components cables removed for clarity 1 1 stack cell 2 2 Connecting beam 1 Place the two weight cells in their final resting spots The cells will be approximately 11 4 apart as shown in Figure 2 Figure 2 Set the weight stack cells ...

Страница 4: ...extension and combination wrench to the cells using the four 7 16 x 6 bolts 7 16 washers and 7 16 nuts end cap washers and end caps Figure 3 shows the connected cells You may wish to use a pinch bar to align the bolt holes Figure 3 Bolt on the connecting beam Figure 4 Configuration for 6 bolts ...

Страница 5: ...SM20 Unpacking Assembly Instructions 5 CROSSOVER CABLE ROUTING NOTE THE INFORMATION BELOW IS FOR REFERENCE ONLY THE CABLES ON THE SM20 HAVE BEEN INSTALLED AT THE FACTORY Figure 5 Crossover cable routing ...

Страница 6: ...SM20 Unpacking Assembly Instructions 6 Figure 8 Screw the pulley into the weight stack ...

Страница 7: ...her use on head end of the 6 bolt so end cap will fit on the nut D 7 16 hex head nut E End caps bolt covers PARTS LIST Part ID Description Quantity Main components 1 2 1 stack cell Connecting beam 2 1 0017 00101 1561 0017 00104 0363 0017 00104 0366 0017 00103 0233 0017 00042 0969 6 bolt hardware A B C D E 7 16 x 6 hex head bolt 7 16 flat washer 7 16 cap washer 7 16 Nyloc nut End caps 4 4 4 4 4 Han...

Отзывы: