Chapter 2 Installation
2.1 Installation protection
The installation, operation and maintenance of the gateway must be performed by
professionally trained technicians.
The installation location of the gateway must be limited and not accessible to
non-maintenance personnel.
The surface of the gateway may become hot during normal operation, affecting the
surrounding environment.
All installation operations must comply with local and national electrical codes.
Do not operate the equipment during lightning.
The gateway runs continuously during the life cycle, and it is necessary to ensure that it is
grounded well and stably.
Install the grounding first, and remove grounding wire last at the time of dismantling.
It is forbidden to operate the gateway with power.
The power supply device of the gateway must include overcurrent protection function.
2.2 Unpacking inspection
Consider the following when unpacking a new gateway:
1. Check the shipping carton and check for damage.
2. Unpacking should be carried out in a clean and dry position possible.
3. Do not discard the shipping carton or foam inserts. If it needs to be repaired or reconfigured,
they needs to be used.
2.3 Installation of necessary equipment
The following tools are required during installation:
1. M4 hex screwdriver
2. flat-nose pliers (antenna interface locking)
3. Diagonal pliers