Liberty Pumps XLE100 Series Скачать руководство пользователя страница 8

8 | EN

Copyright © Liberty Pumps, Inc. 2021 All rights reserved.

3473000C

 3-Phase Pump Rotation Verification

Check 3-phase pumps for proper rotation prior to installing 

pump(s) in basin. To change rotation, reverse any two of the 

three power leads to the pump (not the ground). Code the 

wires for reconnection after installation.

3-phase power uses three separate 

alternating currents that peak at 

different integrals. With pumps that are 

powered by three phase electric, the 

phase sequence of the motor must 

match the phase sequence of the power 

source. When the phase sequences 

match, the pump operates properly. 
However, when the phases are out of 

order, the pump runs backward (i.e., the 

impeller rotates in the wrong direction). This causes an extreme 

loss of performance and could raise the current draw, which could 

result in tripping an overload or circuit breaker. To ensure that the 

power to the pump is installed correctly, always verify proper 

rotation before lowering it into the basin. If the pump is rotating 

in the wrong direction, turn off the power and reverse any two 

leads to the pump (not ground). This reverses the phase sequence 

and corrects the pump rotation. For 3-phase pumps, rotation 

must be counterclockwise when looking from the bottom of the 

pump. Label the wires for reconnection after installation.

 Guide Rail System

When working in a hazardous location, all precautions to 

minimize ignition sources such as spark and flame should be 

taken to limit the potential for fire or explosion. 

If guide rails are used

, refer to the separate instructions supplied 

with the unit for proper installation and operation. Verify all 

gaskets and components are present. Use of a guide rail system 

shall be of a non-sparking design. Contact Liberty Pumps for 

available models, such as GR22NS-LE or GR30NS (XLE100/150 

models).

If guide rails are not used

, complete all pump-related plumbing 

at this time. Verify all gaskets and components are present.

 Pump

Record information from pump nameplate onto inside cover of 

these instructions. Complete a visual inspection before lowering 

into basin.
Place pump in basin, making certain the mounting interface (i.e., 

guide rail, torque stop, etc.) is engaged correctly.

 Discharge

A union should be installed just above the cover to facilitate pump 

removal if necessary. A check valve is required after the union to 

prevent the backflow of liquid after each pumping cycle. A gate 

valve should follow the check valve to allow periodic cleaning of 

the check valve or removal of the pump. The remainder of the 

discharge line should be as short as possible with a minimum 

number of turns, to minimize friction head loss. Do not restrict the 

discharge to below 2”. Larger pipe sizes may be required to 

eliminate friction head loss over long runs. Contact Liberty Pumps 

or other qualified person if there are questions regarding proper 

pipe size and flow rates.

 Vent

Vent basin in accordance with applicable plumbing codes.

Operation

Energizing the control panel or breaker for the first time is 

potentially dangerous. Licensed electrical personnel should 

be present when the panel or breaker is energized for the first 

time. If faults caused by damage or poor installation practices 

have not been detected, serious damage, injury or death can 

result when power is applied.

 Starting System

1. Verify all plumbing components in the basin are installed 

correctly and functional. Verify all valves are open and ready 

for pump use.

2. Double check all wire connections. Re-tighten all factory and 

field connections.

3. Ensure pump has no obstructions.
4. With all electrical and mechanical connections complete and 

secure, turn on power to control panel and pump.

5. Verify operation of the pump, floats, and alarm circuits.
6. Run several cycles of water through the system to verify 

correct control operation for the installation. 

Be certain to complete adequate testing, especially on systems 

with multiple pumps or custom control configurations.

RISK OF FIRE

BOTTOM VIEW

ROTATION

RISK OF SERIOUS INJURY OR DEATH

Содержание XLE100 Series

Страница 1: ...rence For replacement manual visit LibertyPumps com or contact Liberty Pumps at 1 800 543 2550 Retain dated sales receipt for warranty Model 7000 Apple Tree Avenue Bergen NY 14416 ph 1 800 543 2550 fa...

Страница 2: ...res inside the power cord The electrical power supply shall be located within the length limitations of the pump power cord and for below grade installations it shall be at least 4 ft 1 22 m above flo...

Страница 3: ...te and Local codes and ordinances for hazardous locations All electrical terminations shall be made according to Federal State and Local codes for hazardous or classified locations Conduit junction bo...

Страница 4: ...complete If storage is necessary the pump should remain in its shipping container It should be stored in a warehouse or storage shed that has a clean dry temperature stable environment where the pump...

Страница 5: ...rly sized or adjusted for the full load input power indicated on the pump nameplate It is important to properly select and adjust the motor control overload protection The full load amperes on the nam...

Страница 6: ...e pump has cooled 1 phase models automatically reset after the pump has cooled to a safe temperature Power and Control Cords Do not remove cord and strain relief and do not connect conduit to pump The...

Страница 7: ...into the pump intake The pump can remain upright or can be laid down on its side for easier access to the intake Besides verification that the impeller is freely spinning rotating the impeller helps t...

Страница 8: ...skets and components are present Pump Record information from pump nameplate onto inside cover of these instructions Complete a visual inspection before lowering into basin Place pump in basin making...

Страница 9: ...further assistance To keep the pump pump system operating smoothly perform the following routine checks Monthly Pumps that are idle for more than a month in a dry basin should have impellers manually...

Страница 10: ...s trip Unintentional ground Turn off power and check motor leads for possible ground 3 phase motor winding failure Check resistance of motor windings All three phases should have the same reading Obst...

Страница 11: ...pen gate or ball valve Total head is beyond pump s capability Route piping to a lower level If not possible a larger pump may be required Consult Liberty Pumps Obstructed impeller or volute clogged in...

Страница 12: ...mages including costs of removal reinstallation or transportation There is no other express warranty All implied warranties including those of merchantability and fitness for a particular purpose are...

Отзывы: