5-10
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Normal: Approx. 200 ~ 400
Ω
Abnormal:
∞
or several
Ω
Normal: Approx. 10~20 K
Ω
Abnormal:
∞
or several
Ω
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
20%
40%
60%
80%
100%
6 sec
10 sec
14 sec
18 sec
22 sec
16 sec
12 sec
8 sec
4 sec
0 sec
POWER
LEVEL
Relay 1
Relay 2
Power
Transformer
A
B
230V 21V COM.
Measure the resistance.
(Ohm-meter scale: R x 100)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1000)
Содержание MS-2645DPA
Страница 9: ...SCHEMATIC DIAGRAM 4 3 ...
Страница 28: ...6 2 13213A 13552A 15006A 13581A 13536A 14026A 14970A 13720D 14890A DOOR PARTS EV ...
Страница 29: ...6 3 23572A 24781M WTP018 268711 24510L 250201 24970A 23506A CONTROL PANEL PARTS EV ...
Страница 30: ...6 4 WTT011 WTT010 WTP013 WTT021 33390G 34370T 35889A 36549S 33052M 33112U OVEN CAVITY PARTS EV ...
Страница 31: ...6 5 466001 466003 466001 43500A WSZ085 LATCH BOARD PARTS EV ...
Страница 33: ...6 7 56170D 63303A WSZ002 WTT021 WTT030 647781 63302A BASE PLATE PARTS EV ...
Страница 34: ......