5-12
COMPONENTS
TEST PROCEDURE
RESULTS
CIRCULATION MOTOR
(Wire leads removed)
NOTE :
A MICROWAVE ENERGY LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
MAKE SURE THE WIRE LEADS ARE CORRECT POSITION.
WHEN REMOVING THE WIRE LEAD FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Normal : COM-230V : Approx. 160
Ω
Abnormal : Infinite or several ohm.
Содержание MC2841SPS
Страница 1: ...MODEL MC2841SPS ...
Страница 9: ...SCHEMATIC DIAGRAM 4 3 Conv therostat ...
Страница 31: ... 6 2 DOOR P ARTS 13581A ...
Страница 32: ... 6 3 CONTROL PANEL PARTS 268711 23572A 23506A ...
Страница 33: ... 6 4 OVEN CAVITY PARTS 33052M 36549S 33390G 34370T 35889A 33390M 33112U 372901 35300A 33390L 33390H ...
Страница 34: ... 6 5 LATCH BOARD PARTS 33052N 466001 466003 466001 43500A ...
Страница 36: ... 6 7 BASE PLATE PARTS 56170D ...
Страница 37: ......
Страница 39: ......