
3. Evacuation
(All amount of refrigerant leaked)
• Procedure
(1) Connect the vacuum pump to the charge set’s
center hose
(2) Evacuation for approximately one hour.
– Confirm that the gauge needle has moved
toward -76 cmHg (vacuum of 4 mmHg or
less).
(3) Close the valve (Lo side) on the charge set,
turn off the vacuum pump, and confirm that
the gauge needle does not move (approxima-
tely 5 minutes after turning off the vacuum
pump).
(4) Disconnect the charge hose from the vacuum
pump.
– Vacuum pump oil.
If the vacuum pump oil becomes dirty or
depleted, replenish as needed.
Lo
Open
Open
Vacuum pump
2-Way
valve
Outdoor unit
Liquid side
Indoor unit
Gas side
3-Way
valve
CLOSE
OPEN
-47-
Содержание LS-J0762NM
Страница 64: ... 64 2 MAIN PCB ASS Y OUTDOOR PCB ASS Y SVC PART LIST 6871A20265A 9K_Series AC TOP VIEW BOTTOM VIEW ...
Страница 66: ...Schematic Diagram 66 Indoor _YL _UL Series ...
Страница 67: ... 67 Indoor _NM _NN Series ...
Страница 68: ... 68 Outdoor 7K AC Series ...
Страница 69: ... 69 Outdoor 12K AC Series ...
Страница 70: ... 70 Outdoor 9K DC Series ...
Страница 73: ... 73 Outdoor 12K DC Series ...
Страница 80: ...Memo 80 ...
Страница 81: ... 81 Memo ...
Страница 82: ...P No 3828A20061S February 2003 Printed in Korea ...