7-19
B. CHECKOUT PROCEDURES
(1) CHECKOUT PROCEDURES FOR FUSE BLOWING
CAUTION:
REPLACE BLOWN FUSE WITH 20 AMPERE FUSE.
NOTES:
• If the fuse is blown by an improper switch operation, replace all switches and the fuse at the same time.
After replacing the defective switches with new ones, make sure that they are correctly connected.
• Check for microwave energy leakage according to INTERLOCK ADJUSTMENT PROCEDURES on page
7-12 when the primary interlock, secondary interlock switches and/or the interlock monitor switches are
adjusted or replaced.
Fuse blows immediately after
the door is closed.
Fuse blows immediately after
the door is opened.
Fuse blows when the door is closed and START
key is touched.
Improper operation of the primary interlock, secondary
interlock switches and/or the interlock monitor switch.
Malfunction of the high voltage transformer; the high
voltage capacitor including the diode, the magnetron,
the blower motor or the circuit board.
PROBLEMS
CAUSES
Содержание LMV1645SB
Страница 10: ...5 2 MATRIX CIRCUIT FOR TOUCH KEY BOARD KEY MATRIX ...
Страница 40: ...8 4 LATCH BOARD PARTS 43501A WSZ084 43500A 466001 466003 466001 44510A ...
Страница 43: ...8 7 INSTALLATION PARTS 63300M WTT028 65862D 65862B VINYL BAG 63861A ...
Страница 44: ......