background image

Quick Installation Guide

Hybrid Inverter

LGES-5048 

V1.0 -2021 -11-01

Содержание LGES-5048

Страница 1: ...Quick Installation Guide Hybrid Inverter LGES 5048 V1 0 2021 11 01 ...

Страница 2: ... www lgessbattery com au home battery product info lg General Disclaimer DC Side 1 Ensure the component frames and the bracket system are securely grounded 2 Connect the DC cables using the delivered PV connectors The manufacturer shall not be liable for the damage if other connectors are used 3 Ensure the DC cables are connected tightly securely and correctly Inappropriate wiring may cause poor c...

Страница 3: ...nected to the battery 6 Warning labels on the inverter are as follows High voltage hazard Power off the inverter first before any operations Potential risks exist Wear proper PPE before any operations Read through the guide before any operations Delayed discharge Wait until the components are totally discharged after power off High temperature hazard Do not touch the equipment to avoid being burnt...

Страница 4: ...Communication Port 5 DRED or Remote Shutdown Communication Port 6 BMS Communication Port 7 RS485 Communication Port 8 Reserved Port 9 AC Terminal ON GRID BACKUP 10 Indicators 11 Mounting Plate 12 Heat Sink 13 PE Terminal Parts Dimensions 11 12 13 10 9 8 7 6 5 4 3 2 1 516mm 440mm 184mm 228 5mm 228 5mm 200mm 200mm 117 5mm 104 5mm ...

Страница 5: ... Installation x 1 x 1 x 6 x 2 x 1 x 2 x 1 x 1 x 1 a x 1 x 2 Packing List x 1 x 1 x 1 Space Requirement x 1 x 10 300mm 300mm 200mm 200mm 500mm a The communication module can be used as a WiFi module or LAN module x 1 ...

Страница 6: ...oid water pipes and cables buried in the wall when drilling holes The lock and its accessories should be prepared by customers Angle Requirements Inverter Installation 0 95 RH IP65 1 2 3 4 Φ 10mm Depth 80mm ...

Страница 7: ...the PE Cable 04 Electrical Connection 1 2 3 1 2 2N m M5 Copper 4 6mm2 L L1 1 2 mm L1 Connecting the AC Cable ON GRID BACKUP 1 2 3 4 2 2 1 1 1 2 2 2 1 1 Copper 4mm2 S 6mm2 20 25mm Φ 13 18mm 7 9mm L N PE M3 0 6 0 8N m ...

Страница 8: ...07 Connecting the DC Cable PV 1 2 3 4 1 1 2 3 4 1 1 2 3 4 5 2 2 2 7 8mm 7 8mm Φ 4 5mm 2 5mm2 S 4mm2 Click Click Click Use a multimeter to measure the DC voltage and check the polarity of the connectors ...

Страница 9: ...nnecting the Battery Cable BATTERY Connecting the DRED Communication Cable 05 Communication Connection Φ 10 14mm 10mm 10mm Φ 10 14mm 20mm2 S 35mm2 2 3 4 2 2 1 1 1 1 M8 1 2 2 7 9N m 6 8mm 25mm 1 M3 0 6 0 8N m ...

Страница 10: ...down Communication Cable 1 2 3 4 5 6 4 1 4 4 4 4 3 3 3 3 3 2 M3 0 8N m 4 1 2 4 1 2 3 25mm 6 8mm 5 REFGEN 6 COM DRMO 1 DRM 1 5 2 DRM2 6 3 DRM3 7 4 DRM4 8 5 REFGEN 6 COM DRMO 1 2 3 4 5 6 4 1 4 4 4 4 3 3 3 3 3 2 M3 0 8N m 4 1 2 4 2 3 ...

Страница 11: ...te 485_A2 NC 485_A 2 Orange NC NC 485_B 3 Green White 485_B2 485_B1 485_A 4 Blue CAN_H NC NC 5 Blue White CAN_L NC NC 6 Green NC 485_A1 485_B 7 Brown White NC 485_B1 NC 8 Brown NC 485_A1 NC Connecting the Communication Module Notice Use the delivered module remover when removing the communication module Otherwise the module may be damaged ...

Страница 12: ...ker Turn on Turn off Power On Power Off 06 Wiring System 1 2 4 5 3 1 4 3 5 2 If the inverter is not equipped with a DC switch an external DC breaker shall be added CT PE N L3 L2 L1 Battery To Battery To Smart Meter Power Meter Loads Grid AC Breaker 5 AC Breaker 3 AC Breaker 2 DC Breaker 1 BACK UP Loads PV DC Breaker 4 1 ...

Страница 13: ...AR RS485 RCD CT Back Up Loads On Grid RCD Normal Loads Battery Hybrid Inverter BMS Solar Array Bypass Switch Wiring with SP3T Bypass Switch Notice The purpose of SP3T bypass switch is to allow for continued operation of back up loads in case of inverter fault SP3T bypass switch is not provided with inverter it can be purchased from electrical wholesalers ...

Страница 14: ...13 LED Indicators 07 Commissioning and Monitoring Commissioning via LGES PV Master App LGES PV Master 10m 5m LGES PV Master play App Store ...

Страница 15: ...6 5 Initial Password lgresuinstaller Configure basic settings following the hints after log in 1 3 2 Bluetooth SOL BLE WiFi Solar WiFi are the last 8 digits of the inverter SN WiFi initial password 12345678 ...

Страница 16: ...Dealer use existing organisation code and password to add a plant Configure WiFi following the WiFi Configuration Instruction For WiFi module only Monitoring via LG RESU HOME App 5 6 Test LG RESU HOME LG RESU HOME App play App Store 602 18 AUD 1 4 ...

Страница 17: ...LG Energy Solution Australia Pty Ltd Unit 12 35 Dunlop Rd Mulgrave VIC 3170 www lghomebattery com au essserviceau lgensol com 340 00567 01 ...

Отзывы: