7 Maintenance

To prevent a risk of burn, do not touch the metal part of the AC module in operation with  bare 
hands.

To prevent the risk of overvoltage, do not disconnect the cable connector in operation.

Ensure that AC cable connectors are tightly connected and the wiring properly works.

Conduct periodic inspection of the AC modules for any damages on front glass, back sheet, frame, AC junction box,
micro inverters, circuit breakers, conduits, Earth Grounding path, or external electrical connections.

No aggressive and abrasive cleansers or chemicals such as alkali chemicals including ammonia based solution should
ever be used on the treated front glass.

Always wear rubber gloves for electrical insulation while maintaining, washing or cleaning panels.

Deposits of foreign material on the frame surface can be cleaned using a wet sponge or cloth and dried in air or by using
a clean chamois.

All works related to repair shall be carried out by the approved installer for the safety of workers and systems.

Do not use any kind of oil or lubricant on the module's any parts, It can defect the AC Module.

96

Copyright © 2017 LG Electronics. 

All Rights Reserved.

Содержание LG A1C-A5 Series

Страница 1: ... Manual Important Please read AC Module System Installation Manual before installing wiring or using this product in any way Failure to comply with these instructions will invalidate Warranty 1 Copyright 2017 LG Electronics All Rights Reserved ...

Страница 2: ...g Components of an EnerBox2 13 3 5 Wiring Diagram of AC Module System 14 3 6 Installing the AC Junction Box and PV Rack 15 3 7 Mounting the AC module 16 3 8 Coupling AC cable Connectors 21 3 9 Building an Array of AC modules 23 3 10 Building Blocks of an Array 25 3 11 Grounding 34 3 12 Connecting Array of AC Modules to Distribution Panel 37 3 13 Grid Voltage Measurement 44 3 14 Grid Frequency Meas...

Страница 3: ... account 72 4 7 EnerVu2 Mobile Monitoring Application Homeowner account 75 5 Trouble Shooting Guide 79 5 1 EnerBox2 Inspection 79 5 2 Replacing an EnerBox2 80 5 3 Check the PLC Level 82 5 4 Micro Inverter Detection Issues 83 5 5 Internet Connection Issues 85 5 6 Micro Inverter Operation Issues 87 5 7 Grid Voltage Measurement 90 5 8 Grid Frequency Measurement 91 6 Event List and Description 92 6 1 ...

Страница 4: ...nsportation and Storage 103 12 Contact 103 Appendix 1 AC module Installation Map 104 Appendix 2 Module Installation Load Guide 105 Appendix 3 Alternative Equipment Grounding Devices 106 Revisions Table Date Version Description of change Remark 2018 03 19 1 0 First Release Installation Manual 2018 05 29 1 1 Deletion of Proposition 65 4 Copyright 2017 LG Electronics All Rights Reserved Contents ...

Страница 5: ...Mark the number in front of this sy mbol to represent the number of phases Equipment Grounding Conductor EGC Conductor connecting normally non current carrying metal parts of equipment together Grounding Electrode Conductor GEC Conductor connecting EGC and neutral conductor to the ground for grounding 1 2 Circuit Symbol Safety Symbol Description Failure to comply with the instructions may cause a ...

Страница 6: ...er safety equipment Micro inverter warranty is void if cover removed No serviceable parts inside Refer to qualified personnel for service For proper operation make sure to use AC cables connectors and accessories provided by LG Electronics Parts that are not listed may cause critical danger For proper operation the AC module shall be connected only to a dedicated branch circuit To prevent the risk...

Страница 7: ...LG Electronics All Rights Reserved AC modules shall be mounted with racking and mounting products certified and listed for system fire class rating in accordance with UL1703 edition 2014 and UL2703 edition 2014 The System Fire Class Rating of the module or panel in a mounting system in combination with a roof covering must complete with requirements to achieve the specified System Fire Class Ratin...

Страница 8: ...er or an experienced radio TV technician for help This device complies with part 15 of the FCC rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 This device must accept any interference received including interference that may cause undesired operation Indoor use only FCC Caution For indoor use only outdoor use or in any other environ...

Страница 9: ...roof vents on the target site there is no worry because AC cable connection is possible for the AC module array circumventing the vent area The mentioned advantages will reduce total installation and labor costs Also total installation time will be shortened In this diagram AC modules will produce power during daytime The produced energy can be consumed by home appliances like a fridge TVs and etc...

Страница 10: ...he solar modules Store the AC modules in its original packing before installation Keep the AC modules in clear and secured area Any particles or moisture may cause malfunction of AC cable s contactors Consider the weight of AC module before installation Do not work alone Install AC modules with a team unit including at least 2 persons for safe installation To prevent the risk of accidents use prop...

Страница 11: ...ople Do not install AC modules indoors or on a moving vehicle In an environment having frequent lightning storms an auxiliary grounding may need to be established by installer which is connected directly from the AC module system to the ground If the target installation structure lies on an uneven surface do not forcefully modify the module to fit in the structure Make sure that the installation s...

Страница 12: ...le preventing it from getting free 7 AC Cable Female Connector Holder holds the cable preventing it from getting free 8 Product Label indicates product specification and MAC ID number 9 Detachable MAC ID is for a customer to place it on a map for record 10 Model number represents its model number Accessory Contact to distributor for order 11 Extension Cable serviceable as a transition cable has bo...

Страница 13: ...cable LAN cable 13 EnerBox2 Wi Fi Antenna Copyright 2017 LG Electronics All Rights Reserved EnerBox2 Gateway Contact to distributor for order 1 EnerBox2 is to collect energy harvest volume data from installed AC modules 2 Wi Fi antenna is attached on the body of EnerBox2 for wireless connection of an EnerBox2 to a router It needs to be already installed at home owner s shelter A router is not prov...

Страница 14: ...he condition of the system to the service center in case of a problem 3 5 Wiring Diagram of AC Module System 14 PV rack Structure used to attach AC modules on surfaces like roofs empty plots etc AC junction box Container for electrical connections of AC cables Distribution panel Component of an electricity supply system which divides an electrical power feed into subsidiary circuits while providin...

Страница 15: ...n site If there are any vents or obstacles that make array build difficult go to 3 9 Building an array of AC modules to get ideas to design an array Install the AC junction box near the PV rack Select the size and type of AC junction box suitable for connection type according to the output voltage refer to 3 12 Connecting Array of AC Modules to Distribution Panel Make sure that the AC junction box...

Страница 16: ... avoid the tensile strain from the thermal expansion it is recommended to leave a space more than 6mm 0 236 inches between AC modules frames Mount LG AC module to PV rack with 4 5N m torque For reliable connection make sure that the AC module frame and a PV rack are surely fastened enough to prevent the AC modules from getting loose When installing modules in areas of heavy snow special care shoul...

Страница 17: ...e frame deforms Please follow instructions and manuals specified by bolt clamp or fixing plate manufactures Make sure that any clamps or fixing plates do not contact the front glass and do not deform the frame Also be sure to avoid shadowing effects caused by the clamps or fixing plates It is recommended to check with local authorities for fire safety guidelines and requirements for any buildings ...

Страница 18: ...label And the other is the detachable MAC ID label The layout of the array will be utilized for building a monitoring system allowing a customer to check the amount of energy harvest The AC modules can be mounted in landscape or portrait orientation as illustrated below When the AC module is mounted on a PV rack rail ensure that the rail is inside the range specified in Appendix 2 Module Installat...

Страница 19: ... end cap and junction box connection are surely finished proceed to install next row of modules All of AC cable connectors must be installed underneath the module out of rain and sun Do not leave AC cable connectors in an environment of long term exposure to direct sunlight or rain 270 mm 10 63 inch 400 mm 15 75 inch 270 mm 10 63 inch 400 mm 15 75 inch 120 mm 4 72 inch 120 mm 4 72 inch 120 mm 4 72...

Страница 20: ...ied Once it starts power production connection time 1 min will be applied After connection time or reconnection time the micro inverter will transform DC power to AC power for utility grid 1 At night the LED has no light because there is no energy to make the LED illuminate 2 At daytime the LED will light in flashing red when the PV panel is getting solar energy as well as the micro inverter is no...

Страница 21: ...y pushing the connectors together until a clear audible click is heard When the connectors are correctly connected there should be no space between the end of a male connector and the end of a female connector Do not let cable be pulled too tight or hang too loose Internal conductor may break Do not allow any liquid inside to prevent danger of electric shock Do not use damaged cables Do not cut or...

Страница 22: ...ctions is prevented A minimum bending radius R 55mm 5 x Cable diameter must be maintained Do not attempt to assemble connectors in wet soiled or dusty environment Keep connectors dry and clean and ensure that connectors have no damage or deforms Avoid connectors resting on the ground or roof surface AC cables should be kept way from the ground or roof surface Use proper tools like cable ties for s...

Страница 23: ... completing the electrical connection between DC module and a micro inverter Therefore it eliminates installation steps for pairing DC module outputs and micro inverter inputs Also the two AC cables coming out of the micro inverter have enough cable length which enables easy cable links throughout an array you have designed Landscape portrait or mixture of the two type orientation is possible with...

Страница 24: ... PV racks using the cable ties Let the AC cables float way from the ground surface or the roof After checking whether paring male and female connectors between modules except end cap and junction box connection are surely finished proceed to install next row of modules Seal the last AC cable connector with an appropriate end cap to add the waterproof function Insert the end cap into the male or fe...

Страница 25: ...n each building block Also to avoid the tensile strain from the thermal expansion it is recommended to leave a space more than 6 mm 0 236 inches between AC module frames This manual provides gap limitation between AC module frames for each building blocks After male and female connection of two AC modules use cable ties in order to fasten the AC cables on frames or PV racks Keep the AC cables off ...

Страница 26: ...rtrait in reverse or landscape in common steps are described to recommend to fasten AC cables on AC module frames and PV racks For portrait in reverse or landscape in common A Get the AC cable paired B Use a mounting hole with a cable tie for fastening the AC cable on the AC module frame Mounting holes are placed in red dots as displayed in the rear side of an AC module Also C Attach another AC ca...

Страница 27: ...es to Distribution Panel guiding installers to make a transition cable from an extension cable Seal the AC cable male or female connector of the last AC module using an appropriate end cap End caps can be found in an extension cable If AC junction box is on the left of a 3 by 4 PV array in portrait orientation Possible combination of AC modules for array design 27 Copyright 2017 LG Electronics All...

Страница 28: ...propriate end cap End caps can be found in an extension cable If AC junction box is on the left of a 3 by 4 PV array in landscape orientation Requirement for the landscape formation Unlike a connection in a portrait orientation two AC modules in a landscape orientation requires to be placed with a gap ranging from 6mm 0 24 inch to 50mm 1 95 inch Otherwise the length of the AC cables is not enough ...

Страница 29: ...es to Distribution Panel guiding installers to make a transition cable from an extension cable Seal the AC cable male or female connector of the last AC module using an appropriate end cap End caps can be found in an extension cable If AC junction box is on the left of a 2 by 6 PV array in portrait orientation Possible combination of AC modules for array design 29 Copyright 2017 LG Electronics All...

Страница 30: ...es to Distribution Panel guiding installers to make a transition cable from an extension cable Seal the AC cable male or female connector of the last AC module using an appropriate end cap End caps can be found in an extension cable If AC junction box is on the left of a 2 by 6 PV array in portrait orientation Possible combination of AC modules for array design 30 Copyright 2017 LG Electronics All...

Страница 31: ...propriate end cap End caps can be found in an extension cable If AC junction box is on the left of a 2 by 6 PV array in landscape orientation Requirement for the landscape formation Unlike a connection in a portrait orientation two AC modules in a landscape orientation requires to be placed with a gap ranging from 6mm 0 24 inch to 50mm 1 95 inch Otherwise the length of the AC cables is not enough ...

Страница 32: ...ray of AC Modules to Distribution Panel guiding installers to make a transition cable from an extension cable Seal the AC cable male or female connector of the last AC module using an appropriate end cap End caps can be found in an extension cable Requirement for the connection of AC modules in reverse position Unlike a general connection of AC modules in a portrait orientation AC modules in a rev...

Страница 33: ... obstacles The problem can be solved by using extension cables which has 1600 mm 63 in long The extension cable connectors are provided with end caps So apply unlocking tool to remove end caps from connectors If AC junction box is on the left of a 2 by 6 PV array in portrait orientation Possible combination of AC modules for array design 33 Copyright 2017 LG Electronics All Rights Reserved Extensi...

Страница 34: ... grounding path from AC module to the grounded distribution panel with one connection in the following order To form the effective grounding path connect the one of points marked of a AC module frame to the PV rack To electrically connect it recommends that you use one M4 stainless steel bolt one nut one spring washer two flat washers one cup washer and one star washer Minimum torque 4 5 N m Conne...

Страница 35: ...ctly into the aluminum frame The combination of 2 flat washers star washer cup washer spring washer and M4 size nut and bolt made of stainless steel is required in order to provide a reliable grounding connection to the module frame Use torque under 4 5N m AC junction box grounding wire LG AC module includes DC cables in the module s internal wiring so no grounding is required for DC input LG AC M...

Страница 36: ...ved by LG not by UL Please follow installation manual for the grounding devices provided by its manufacturer These alternative grounding devices indicated on the appendix has been evaluated and approved by LG not by UL Please refer to Appendix 3 Alternative Equipment Grounding Devices for alternative equipment grounding devices Samples for grounding 36 Copyright 2017 LG Electronics All Rights Rese...

Страница 37: ...cables smaller than size of AC cables provided by LG Notice 3 12 Connecting Array of AC Modules to Distribution Panel To prevent property damage or danger to human life by fire or explosion do not connect any consumable device between AC module and the circuit breaker To prevent the danger of the electric shock make sure to turn off the circuit breaker Each conductor can be identified by the color...

Страница 38: ...rain and sun Do not leave AC cable connectors in an environment of long term exposure to direct sunlight or rain AC cables from the junction box to the distribution panel should be protected by a conduit 38 Use a proper transition cable for the first AC module connector Copyright 2017 LG Electronics All Rights Reserved L1 Black L2 Red Neutral White Cut here Adjust an extension cable for junction b...

Страница 39: ...g the cable ties Let the AC cables float way from the ground surface or the roof All of AC cable connectors must be installed underneath the module out of rain and sun Do not leave AC cable connectors in an environment of long term exposure to direct sunlight or rain AC cables from the junction box to the distribution panel should be protected by a conduit 39 Copyright 2017 LG Electronics All Righ...

Страница 40: ...ls using the cable ties Also place extension transition cables or AC cables under a structure so that wires can avoid direct sunlight exposure and water immersion Step 4 Connect the equipment grounding conductor from all of the AC modules to the AC junction box ending to the distribution panel Step 5 Make sure that a conduit or a small pipe protects wires from the AC junction box to the distributi...

Страница 41: ...ls using the cable ties Also place extension transition cables or AC cables under a structure so that wires can avoid direct sunlight exposure and water immersion Step 4 Connect the equipment grounding conductor from all of the AC modules to the AC junction box ending to the distribution panel Step 5 Make sure that a conduit or a small pipe protects wires from the AC junction box to the distributi...

Страница 42: ...n transition cables or AC cables under a structure so that wires can avoid direct sunlight exposure and water immersion Step 4 Connect the equipment grounding conductor from all of the AC modules to the AC junction box ending to the distribution panel Step 5 Make sure that a conduit or a small pipe protects wires from the AC junction box to the distribution panel from rain snow or direct sunlight ...

Страница 43: ...es can avoid direct sunlight exposure and water immersion Step 4 Connect the equipment grounding conductor from all of the AC modules to the AC junction box ending to the distribution panel Step 5 Make sure that a conduit or a small pipe protects wires from the AC junction box to the distribution panel from rain snow or direct sunlight AC output three phase 208VAC split type Distribution panel AC ...

Страница 44: ...06 132 L1 L2 240 211 264 208 183 229 208 183 229 L2 L3 208 183 229 L3 L1 208 183 229 Measure point Single Phase 240V RMS Single Phase 208V RMS Three Phase 208V RMS Merge Split Type Expected Range Measured Expected Range Measured Expected Range Measured L1 N 120 106 132 120 106 132 120 106 132 L2 N 120 106 132 120 106 132 120 106 132 L3 N 120 106 132 L1 L2 240 211 264 208 183 229 208 183 229 L2 L3 ...

Страница 45: ...nstallation location is high above ground make sure to use Fall Protection System during the installation For safety only qualified personnel should service the work Measure point Single Phase 240V RMS Single Phase 208V RMS Three Phase 208V RMS Merge Split Type Expected Range Measured Expected Range Measured Expected Range Measured L1 N 60Hz 59 4 60 4 60Hz 59 4 60 4 60Hz 59 4 60 4 L2 N 60Hz 59 4 6...

Страница 46: ...nction box An array of AC modules 2 pole 20A Meter N L1 L2 G A F A Make sure that the branch circuit breaker is initially turned off B Check whether all of AC cable connectors are properly engaged Refer to 3 8 Coupling AC cable connectors and 3 9 Building an array of AC modules C Confirm that the last AC module s cable connector is appropriately sealed with an end cap D Ensure grounding wire conne...

Страница 47: ...lly protected location To avoid malfunction of the gateway be sure to use only the enclosed adapter and cables To avoid risk of the electric shock do not disassemble or expose to pressure To avoid risk of the electric shock do not bend or cut cables used to connect to the gateway Do not expose to water Only clean with a dry cloth The gateway will not log energy production if the power of the gatew...

Страница 48: ...mmunication between the gateway and AC modules Then the gateway collecting energy and performance data from the AC modules in real time transmits the accumulated log data to a web server through an internet router 4 1 EnerBox2 Components 2 EnerBox2 left side 3 EnerBox2 bottom side 4 EnerBox2 Power cable 5 LAN cable 48 1 EnerBox2 Front side Internet Router EnerBox2 LG EnerVu for Professionals or fo...

Страница 49: ... Verify the system configuration Step 6 Create a system using EnerVu2 or LG EnerVu2 Professionals Step 7 Design the Array in EnerVu2 EnerVu2 indicates a website https enervu lg solar com while LG EnerVu2 Professionals mean a program of mobile application Search for the LG EnerVu2 in Google Play Step 8 Activate a System 4 3 EnerBox2 installation procedure Step 1 Create an installer account If you h...

Страница 50: ...r subscription is complete You can create an account by using your laptop or desktop Copyright 2017 LG Electronics All Rights Reserved Step 1 Create an installer account If you have it skip this step Mobile phone Type enervu2 at Google Play Store Then install the app Create an account for homeowner or installer EnerVu2 URL http enervu lg solar com After installing the app sign in on the app with t...

Страница 51: ...s positioned to the G gateway E Locate the EnerBox2 close to the AC mains and plug on the EnerBox2 When the EnerBox2 starts to operate the LED on upper position of the EnerBox2 will be flashing light Then it will be turned off after the boot procedure is in completion Please do not control buttons nor pull the power cord out of an outlet during the boot procedure 51 EnerBox2 left side LEDs and but...

Страница 52: ...be deactivated B Turn Wi Fi on in your mobile phone Search for the SSID of EnerBox_xxxxx xxxxx Five digits after EnerBox2 serial number The password is 87654321 C Control your mobile phone to get the LG EnerVu2 Professionals shown up Tap Connect to an EnerBox It will guide you directly to the Dashboard Then touch Installed Number D Put the total number of AC modules in the blank then touch the sav...

Страница 53: ...where few home appliances are installed F Briefly press the AP button on EnerBox2 to deactivate the Soft AP mode The MOBILE S METER LED is off PLC level indicator Inappropriate PLC level for communication Intermittent communication failure is imminent Decent PLC level Excellent PLC level PLC level indicator Relocate the EnerBox2 on another place Relocate the EnerBox2 on another place Go on to next...

Страница 54: ...METER LED is displayed in amber if you push the AP button again Soft AP mode will be deactivated B Turn Wi Fi on in your mobile phone Search for the SSID of EnerBox_xxxxx C Then go for Connect to an EnerBox Network WLAN D Select your home router s SSID then put the password on the blank E Find solid green on INTERNET LED If it is not try method B Briefly press the AP button Amber color on the LED ...

Страница 55: ...e it try Method C B Press and hold the WPS button on the EnerBox2 for 3 seconds When the WPS mode is activated the INTERNET LED is displayed as flashing green C Press the router s WPS button to connect to EnerBox2 After the internet connection is completed the INTERNET LED will turn green At this time WPS button of the router needs to be pressed in a couple of minutes D Go to Step 5 If internet co...

Страница 56: ...NET of EnerBox2 is supposed to be turned on solid green If not change the Ethernet cable C Make sure that you are using a Broadband router In most cases of Switch Hub DHCP is not in service If DHCP service is not available EnerVu Web server will not be accessible because IP address cannot be assigned Broadband router Ethernet cable AC power cable Find solid green on INTERNET LED If internet connec...

Страница 57: ... where Factory installed grid profile IEEE1547 is not applied users can edit grid profile by going AC module Set Grid Profile It takes 15 min for updating changes D Do Start Scan If the number is matched go on to next steps If the number is more than input number delete MAC addresses that you cannot find from Installation Map EnerBox2 is connected to internet EnerBox2 is not connected to internet ...

Страница 58: ...he EnerBox2 serial number and press check button The serial number is attached on the EnerBox2 If the server says This EnerBox is not verified on EnerVu Please proceed after installation is completed check the internet connection of the EnerBox2 F Make sure that the inserted serial number is correct If it is not edit the number If the number of Detected AC modules and the number of Total AC module...

Страница 59: ...ottom side of the dashboard D Fill in the System Owner information If you click the Save button an invitation e mail will be sent to the home owner s email typed in Owner Info E Design arrays via EnerVu2 web application It is possible to edit arrays although the system is activated Copyright 2017 LG Electronics All Rights Reserved Once Activate button is pushed the system will be locked in Activat...

Страница 60: ...n the system of dashboard After creating an array for AC modules drag the MAC on the array for mapping The maximum allowable number of AC modules is 600 If you want to register more than 600 AC modules please create multiple systems on the website E Confirm whether all of MAC addresses and AC modules are properly placed with a reference of AC module Installation map F Save and terminate the Array ...

Страница 61: ...r homeowners and sign up D A window for creating an account will be popped up E Agree with the terms and conditions then go for Create Account F The email account the home owner has created here should be same with the email address that the installer put on the installed system information Once Activate button is pushed the system will be locked in Activation Ready so that it is impossible to edi...

Страница 62: ...low C If red LED light or no LED light is shown during daytime and it persists continuously please refer to Trouble Shooting Guide in Installation manual 62 Power production LED Power production LED Power production LED Power production LED Average power is above 60W At least one Micro Inverter does not produce power over 72 hours After sunset no power production Copyright 2017 LG Electronics All ...

Страница 63: ... button to go to the subscription page and enter basic information User Company Info C If you choose to submit the agreement after confirming the terms and conditions an email will be sent from the solar server so that you can set the password with the email you have entered D If you generate a password through a link sent to your email your subscription is complete E Access and sign in to LG Ener...

Страница 64: ... a mouse wheel C Alerts and systems in progress are displayed here so that users can find current conditions of overall AC module system If you click Notice Error or Fault relevant systems will be listed Clickable system name will guide you to a system monitoring page D Total number of registered system and AC modules can be found here And weather forecast is provided here from AccuWeather If you ...

Страница 65: ...k a system that you have created C The list can be easily fetched by just clicking the excel icon An excel file will be automatically generated for helping user stack data or report a list Also Setting Table Data is provided to freely select columns you want to demonstrate in the excel file or on the display window 65 B A C Copyright 2017 LG Electronics All Rights Reserved ...

Страница 66: ...between Fahrenheit scale F and Celsius scale C Change Password You can change Password C Support System manuals frequently asked questions FAQ terms and privacy can be found in the menu D VIEW Menu for checking energy production trend which includes 1 amount of energy produced by each AC module with a set period 2 graphs showing produced power at a specific time MANAGE Menu for managing the system...

Страница 67: ...owing power from the AC module system at a specific time The power generated from the AC module system depends on weather conditions shadows caused by clouds structures and etc You can hover your mouse pointer near a line of the graph so that a mini popup will indicate how much power is produced at a certain time This function is available with Today 7 days setting E Set left and right time frames...

Страница 68: ... check energy and power production D Multiple graphs can be created in taps For a new tap it shows data with previous setting So change settings for graphs that you want to check E The graphs can be fetched in a format that you have selected F For Power setting users can find more parameters that individual micro inverter has collected only for ONE AC module If you selected the system consisting o...

Страница 69: ...time frame E Please check out two modules you want to compare F After selecting two modules press the Apply button G Then you can compare two AC modules for power DC voltage current and etc Also if you hover your mouse pointer on the graphs actual values are displayed with a popup Detailed information can be found only at Power H Once you have changed setting please click onto Apply button again C...

Страница 70: ...board Monitoring System Info C System Energy provides information representing energy production D Energy Production Graph allows a home owner to observe general energy production trend quickly E Trip to America simply demonstrate an electric car on a road in order to simply show how the solar energy contributes to alleviate air pollution 4 5 EnerVu2 Monitoring system Homeowner account C D E B Cop...

Страница 71: ...e AC module system shows energy production on each AC module depending on how you set the time period F Go for System Info if setting system information is needed G It shows brief information about the home owner H It depicts current status of the installed AC modules and communication network I A report can be selected among 1 Energy Production 2 Recent Power Production 3 System Report After sett...

Страница 72: ...on and system status Network where internet setting for EnerVu can be changed AC modules for giving individual AC Module conditions More helping users find EnerBox2 F W version and EnerBox2 Event D Check Systems Alert showing systems having any alerts In progress listing systems in process of activation Activated representing systems ready to view energy production E Settings Firmware download Lan...

Страница 73: ...stered systems are settled in the Activated tap From this tap mobile web monitoring activity can be achieved E You may create a new system if you touch Create on right top screen However it is recommended to create a system based on the web site because it will be more convenient to put information in blanks F If there are any updates on the system send the system report to the owner for letting h...

Страница 74: ... an option to choose a language that you want to set D Firebase Analytics provides an option for users to allow disallow sending logs to a web server So if you want to disable Firebase Analytics turn it off E Touch Support F Terms of Use G Privacy Policy H Video Guide I FAQ J Open Source K Application Info A E F G H I J K B C F G H H I I J K Copyright 2017 LG Electronics All Rights Reserved B C D ...

Страница 75: ...le screen down more buttons are ready to be used FAQ helps a user find out useful resources to solve potential problems D After touching Guest an example of screen layout will be depicted The Energy Production Graph is based on random values which will be automatically generated 4 7 EnerVu2 Mobile Monitoring Application Homeowner account A B C D B A C D D D Copyright 2017 LG Electronics All Rights...

Страница 76: ...ison of the produced solar energy with electricity consumption by an electric car is illustrated for showing how the installed AC module systems contribute to clean the world C Mobile monitoring is available on the left side The built AC module array is on the screen Set a period with which total amount of energy will be specified on the virtual array Blue color saturation is used to describe the ...

Страница 77: ...n a form of files go for Run Report after setting Report Type Date and File Format D Other users can be invited to monitor the system The invited user will have access to view the system information and data but will not be authorized to add or transfer the account E To transfer your account enter a new owner s email and press Check Once the new owner s account has been verified you can proceed wi...

Страница 78: ...s Privacy can be used to check rights and obligation There are 3 taps consisting of Terms of Use Privacy Policy and LG Account C System Inquiry Please contact the installer for inquiries about system and error occurrence Homepage Inquiry For inquiries about using the website please contact LG Electronics A B C A B B B C Copyright 2017 LG Electronics All Rights Reserved ...

Страница 79: ...he boot procedure is in completion B Check the EnerBox2 operation mode Enerbox2 usually used as the GATEWAY mode C Reboot the EnerBox2 by pressing the RESET pin If everything is normal The LEDs will be flashing light then turned off after the boot procedure is in completion D For another solution push the FACTORY RESET for 3 seconds The button is placed on the bottom of the EnerBox2 Four LEDs will...

Страница 80: ...he new EnerBox2 you need to connect to the Internet to use the Replace function Using EnerVu2 website Go for System Activated System Select the system Manage EnerBox Info View Detail As before you can find the Replace button by pressing EnerBox2 S N in the left System View or by clicking View Detail in the EnerBox Info When you press the Replace button the above popup window will appear Enter the ...

Страница 81: ...n is placed on the right When you press the Replace button you will see three ways to enter the new EnerBox2 S N as shown below Discover Automatically If the home router is connected together as shown below discover the EnerBox2 automatically Scan Barcode Scan Barcode for EnerBox2 registration Utilize your mobile phone camera to scan barcode placed on the bottom of the EnerBox2 Enter Manually Ente...

Страница 82: ...elocate the EnerBox2 to a location where few home appliances are installed Refer to 5 4 Micro Inverter Detection Issues when relocation of EnerBox2 cannot solve problem In App Step on the Dashboard for checking PLC Level Then check out the PLC level In website It is also possible to check PLC level via website if the system is in completion of activation Go for Manage EnerBox info View detail PLC ...

Страница 83: ...ages B Measure frequencies C Measure ambient temperature and check if it is in the range of 40 65 C 40 145 D Please check that all of AC cable connectors are properly connected Troubleshoot power line communication issues as follows Issue When the number of detected AC modules is not matched with the number of installed AC modules Detected AC modules is smaller than Installed Number Follow below c...

Страница 84: ...led Number Follow below check list Make sure that the number of installed AC modules is accurate in the activated system Go for Detected AC Module Edit Then the bring the installation map where all of MAC address is attached Compare it with the list in the app Find and delete one which is not in the installation map Then save it for update ...

Страница 85: ...nternet service with no problem then follow the steps described below EnerBox2 can play a host in a network with particular settings like a laptop or mobile phone To troubleshoot this issue When the internet LED is solid amber check setting of site owner s broadband router This is a case that EnerBox2 can only access to local network but Internet EnerVu Web server It might be solved if the router ...

Страница 86: ...server However based on circumstances an EnerBox2 can manually set static IP address 1 Push AP button for Soft AP mode Refer to Method B Notice 7 2 Go for Dashboard Network Then select WLAN or Ethernet 3 For WLAN select SSID of the target router and put the password on the blank 4 In IP setting select Static and put the appropriate information on each space When WLAN is already connected and you w...

Страница 87: ...nd keep the LED status in mind or write it down on your notes Web Monitoring system Installed AC module system A B Plan the installation work in moderate weather There is a risk of electric shock when it is raining or snowing To prevent the risk of accidents use proper PPE Personnel Protective Equipment including helmets and globes at all times If installation location is high above ground make su...

Страница 88: ...hich is connected with the AC junction box For this step make sure that the circuit breaker is properly turned off Do not disconnect the AC cable connectors under loads F During a daytime check whether the LED blinks red or shows no lights And keep the LED status in mind or write it down on your notes or F Check LED status Grid connectivity Grid connection 5 min after grid connection Grid disconne...

Страница 89: ...re ambient temperature and check if it is in the range of 40 65 C 40 145 D Please check that all of AC cable connectors are properly connected with the reference described in AC Module System Installation Manual Then try to follow steps of 5 6 Micro inverter Operation Issues again E If the problem persists continuously contact LG Electronics to replace the product D Grid connectivity Grid connecti...

Страница 90: ...6 132 L1 L2 240 211 264 208 183 229 208 183 229 L2 L3 208 183 229 L3 L1 208 183 229 Measure point Single Phase 240V RMS Single Phase 208V RMS Three Phase 208V RMS Merge Split Type Expected Range Measured Expected Range Measured Expected Range Measured L1 N 120 106 132 120 106 132 120 106 132 L2 N 120 106 132 120 106 132 120 106 132 L3 N 120 106 132 L1 L2 240 211 264 208 183 229 208 183 229 L2 L3 2...

Страница 91: ...uding helmets and globes at all times If installation location is high above ground make sure to use Fall Protection System during the installation For safety only qualified personnel should service the work Measure point Single Phase 240V RMS Single Phase 208V RMS Three Phase 208V RMS Merge Split Type Expected Range Measured Expected Range Measured Expected Range Measured L1 N 60Hz 59 3 60 5 60Hz...

Страница 92: ...ress AP mode AP starts and stops with toggle long press for 3 seconds WPS mode No switch to WPS disable and auto disable after 2 minutes 3 PAIRING Repeater pairing button short press Enter pairing mode Pairing starts and stops with toggle long press for 3 seconds Delete the registered Gateway and Repeater To pair press the Repeater and GW pairing button each other 2 GATEWAY REPEATER Mode Select Sw...

Страница 93: ...ued Off AP mode Zigbee disconnected 4 INVERTER Green All Microinverter are communicating Flashing Green While one or more is communicating with gateway scan is in operation Amber At least one Micro inverter is not communicating Flashing Amber While it is not communicating with any micro inverter scan is in operation Off Microinverters are not communicating include low light or night time 5 REPEATE...

Страница 94: ...unicate with AC Mo dule Communication is temporary uns table This condition should corre ct itself MI_THM_OP N Error Inverter Failure Thermistor Status ERROR Thermistor St atus 10 Thermistor Open 10 Error 6 Thermistor Open AC Module has been in failure mo de MI_THM_SHT Error Inverter Failure Thermistor Status ERROR Thermistor St atus 11 Thermistor Short 11 Error 8 Thermistor Short AC Module has be...

Страница 95: ...rsists MI_VFR_UND Notice AC Frequency Low Vfreq Status NOTICE Vfreq Status 11 Vfreq Under AC Frequency is the frequency at which voltage varies on the utility grid AC Frequency coming from t he utility is too low than allowed And this events are usually transi ent and recovered by the utility No action is required unless the c ondition persists MI_VPV_OVR Error DC Voltage High Vpv Status ERROR Vpv...

Страница 96: ...ding path or external electrical connections No aggressive and abrasive cleansers or chemicals such as alkali chemicals including ammonia based solution should ever be used on the treated front glass Always wear rubber gloves for electrical insulation while maintaining washing or cleaning panels Deposits of foreign material on the frame surface can be cleaned using a wet sponge or cloth and dried ...

Страница 97: ...d caps are initially paired with connectors The length 1600 mm 63 in includes only cable length excluded connector length Unlocking Tool LAC UNLOCK2 AU1 Used in the disassembly of the connector 8 Accessories 97 Copyright 2017 LG Electronics All Rights Reserved Accessories are not included in AC module Contact the distributor for purchase Use unlocking tool to get end caps from the extension cable ...

Страница 98: ...ication with AC modules Used for producing power to the EnerBox2 Used in a case of wired LAN Used for mounting the EnerBox2 on wall Used for mounting the EnerBox2 on wall 98 Copyright 2017 LG Electronics All Rights Reserved Accessories are not included in AC module Contact the distributor for purchase ...

Страница 99: ...stable 1 0 8 leading 0 8 lagging CEC Weighted Efficiency California Energy Commission 97 96 Max Number of AC Modules1 12 EA 10 EA Certification DC module UL1703 IEC61215 IEC 61730 Safety Class II AC module UL1741 IEEE1547 UL1741SA FCC Part 15 Class B IEEE 1547 Default Parameter Range Clearing Time s Phase Voltage V 50 0 16 50 V 88 2 00 110 V 120 1 00 V 120 0 16 Frequency 60 5 Hz 0 16 59 3 Hz 0 16 ...

Страница 100: ...t Utility Interactive LM320UE A2 Operating ambient temperature 40 65 C 40 149 Storage temperature 40 90 C 40 194 AC Module Length 1700mm Width 1016mm Height 40mm Weight 20 0kg Cable length male 1100mm Cable length female 1200mm Dimensions LGXXXA1C A5 100 Cross sectional Drawings Short Side Frame Long Side Frame Copyright 2017 LG Electronics All Rights Reserved Unit mm in ...

Страница 101: ...ltage 600V AC Temperature Range 40 85 C 40 185 Rated Current 20A Protection Degree IP68 Wire Size Range 3C 12AWG Diameter range of cable ø 11 mm 9 2 AC Cables AC Cable Ass y attached on a micro inverter and Extension Cable Accessory 101 Copyright 2017 LG Electronics All Rights Reserved ...

Страница 102: ...00BASE TX Ethernet Wireless Communication IEEE802 11b g n Power Requirement Min Typ Max Input Voltage 90 Vrms 100 264 Vrms 277 Vrms Input Current 0 45 Arms 0 24 Arms 0 21 Arms Frequency 47 Hz 50 60 Hz 63 Hz Phase Single Lightening Surge 3kV IEC61547 Mechanical Properties Dimension W x H x D 155 8 x 173 4 x 38 2 mm Weight 0 4 kg Operating Temperature 0 60 C 32 140 F Enclosure Rating IP30 Certificat...

Страница 103: ...bilities claims demands losses or damages on his her account caused or alleged to be caused in whole or in part by the negligence of the LG its affiliated companies successors or assigns its administrators directors agents officers volunteer and employees Disposal Please contact us if you have any inquiries related to the disposal or recycling of solar modules from LG Electronics 10 Warranty Get A...

Страница 104: ...AC Module System Installation Manual Rev 1 0 104 Copyright 2017 LG Electronics All Rights Reserved ...

Страница 105: ...2850Pa 50psf Fig 5 Clamping Type Fig 6 Clamping Type 4 point installation is allowed in the following cases 1 Slope roof If module is installed parallel to the rooftop 2 Flat roof If installed with an additional stand such as wind shield or deflector A 200mm 7 9 in B 400mm 15 7 in Front 6000Pa 125psf Rear 5400Pa 113psf A 120mm 4 7 in 4point Front 1800Pa 37 5psf Rear 1800Pa 37 5psf C 120mm 4 7 in F...

Страница 106: ...Bonding Clip w 8 AWG Panel Claw Standard Claw Long Claw PolaBear III Claw Quickmount PV Quick Rack Panel Clamp SnapNrack SnapNrack Bonding Mid Clamp SnapLink for RL system Ecolibrium EcoX Clamp and Coupling assembly EcoFoot Clamp Pegasus Pegasus LightSpeed Corners Schletter Rapid Grounding Module Clamps Dynorax DynoBond Roof Tech Roof Tech Bonding Plate ILSCO ILSCO SGB 4 Solar Grounding Lug TYCO T...

Страница 107: ...of LG Electronics Inc worldwide Trademarks and intellectual properties of LG Electronics Inc are protected by international copyright laws Document II AC UL V1 EN 201803 107 Copyright 2017 LG Electronics All Rights Reserved LG Electronics U S A Inc 1000 Sylvan Ave Englewood Cliffs NJ 07632 Contact lg solar lge com http www lgsolarusa com ...