66
Single Zone
Art Cool Premier W
all Mounted Installation Manual
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
FINAL INSTALLATION PROCEDURES
Reattaching the Indoor Unit Bottom
Panel
1. Position the bottom panel so its plastic clips align with all of the
indoor unit frame connection points. The number and position of
the connections vary depending on the model of the indoor unit.
Take care not to damage the bottom panel or scratch the main
horizontal vane.
2. Push the back of the bottom panel onto the indoor unit frame until
its clips lock into the connection points.
3. Push both sides of the bottom panel onto the indoor unit frame
until its clips lock into the connection points.
4. Close the front panel.
Figure 120: Positioning the Bottom
Panel Connection Points.
Figure 121: Reconnecting the Back
of the Bottom Panel.
Figure 122: Reconnecting the Sides
of the Bottom Panel.
Reattaching the Bottom Cover