
Service Manual 79
Test Running
1. Check that all tubing and wiring have been properly con-
nected.
2. Check that the gas and liquid side service valves are
fully open.
1) Prepare remote controller
Remove the battery cover by pulling it according to
the arrow direction.
Insert new batteries making sure that the (+) and (–)
of battery are installed correctly.
Reattach the cover by pushing it back into position.
NOTE:
• Use 2 AAA(1.5volt) batteries. Do not use rechargeable
batteries.
• Remove the batteries from the remote controller if the sys-
tem is not going to be used for a long time.
2) Precautions in test run
■
The initial power supply must provide at least 90% of
the rated voltage.
Otherwise, the air conditioner should not be operated.
■
For test run, carry out the cooling operation firstly
even during heating season. If heating operation is
carried out firstly, it leads to the trouble of compres-
sor. Then attention must be paid.
■
Carry out the test run more than 5 minutes without
fail. (Test run will be cancelled 18 minutes later auto-
matically)
■
The forced operation is started by pressing button for
2 seconds. (Cassette Type)
The test run is started by pressing button for 5 sec-
onds. (Cassette Type)
The test run is started by pressing timer cancel button
five times continuously. (Room type)
■
To cancel the test run, press any button.
3) Settlement of outdoor unit
■
Anchor the outdoor unit with a bolt and nut(ø10mm)
tightly and horizontally on a concrete or rigid mount.
■
When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming the
influence of wind and earthquake.
■
In the case when the vibration of the unit is conveyed to
the hose, secure the unit with an anti-vibration rubber.
4) Evaluation of the performance
Operate unit for 15~20 minutes, then check the system
refrigerant charge:
1. Measure the pressure of the gas side service valve.
2. Measure the temperature of the intake and discharge of
air.
3. Ensure the difference between the intake temperature
and the discharge is more than 8°C (Cooling) or reverse-
ly (Heating).
Bolt
Tubing connection
Discharge
temperature
Discharge air
Intake temperature
Discharge
temperature
Discharge air
Intake temperature
Discharge
temperature
Discharge air
Intake temperature
Installation
SPLIT, ART cool, ART cool deluxe Type
Содержание A2UQ166FA0
Страница 135: ...Service Manual 135 Schematic Diagram 2 Art Cool Type ...
Страница 136: ...136 Multi type Air Conditioner Schematic Diagram 3 Art Cool Deluxe Type ...
Страница 147: ...Service Manual 147 Schematic Diagram 1 Indoor Unit MAIN P C B ASM 1 Split Type Components Locations DC part AC part ...
Страница 148: ...148 Multi type Air Conditioner Schematic Diagram 2 Art Cool Type TOP VIEW BOTTOM VIEW ...
Страница 150: ...150 Multi type Air Conditioner Schematic Diagram 4 Duct Type High static BH BG chassis Built in type BP chassis ...
Страница 151: ...Service Manual 151 Schematic Diagram Low static BT BT1 chassis ...
Страница 152: ...152 Multi type Air Conditioner Schematic Diagram 5 Casset Type 1 way TC chasis ...
Страница 153: ...Service Manual 153 Schematic Diagram 4 way TE TF TD chasis 58 B ...
Страница 155: ...Service Manual 155 Schematic Diagram VB chassis ...
Страница 158: ...158 Multi type Air Conditioner Schematic Diagram 3 Outdoor Unit 1 Component side ...
Страница 159: ...Service Manual 159 Schematic Diagram 2 Solder side ...
Страница 160: ...160 Multi type Air Conditioner Schematic Diagram 3 Central control PCB 2 Bottom View 1 Top View ...
Страница 161: ...Service Manual 161 4 SUB P W B ASSEMBLY 1 Art Cool Type TOP VIEW BOTTOM VIEW Schematic Diagram ...
Страница 238: ...P No 3828A22009C October 2006 Printed in Korea ...