Step1. Pass the two BANDs into the space back of the pole mounting bracket and then tighten the BANDs
backward the pole with hand.
Step2. Tighten suitably and insert the HOOK into the hole of the other position of the BAND. Insert the rod
(bolt) in the ring and tighten the NUT and WASHER (3 ~ 5N·m).
Step3. After tightening the NUT, bend the BAND at the other side.
Step4. Cut the remaining part of the BAND
suitably
, and then put the end of the BAND into the rod (bolt) at the the
other side.
Содержание 1103
Страница 10: ... EN 60950 1 2006 A11 2009 EN 60825 1 2001 EN 60825 2 2004 ...
Страница 13: ...Open view ...
Страница 24: ...Connecting power cable Connect the Battery plug to BATT interface from UPS BATTERY INTERFACE UPS ...
Страница 34: ......