IMPORTANT SAFETY INSTRUCTIONS - 

READ ALL INSTRUCTIONS BEFORE USING.

INSTALLATION INSTRUCTIONS

Nos. 

LP2xx, LP3xx, LP4xx, LP6xx

© 2019 Leviton Mfg. Co., Inc.

Load Center Enclosure

Patents covering this product, if any, can be found on Leviton.com/patents.

LIMITED PRODUCT WARRANTY

For Leviton’s limited product warranty, go to 

www.leviton.com

. For a printed copy of the warranty you may call 

1-800-323-8920

.

WARNING

INSTALLATION

WARNING: TO AVOID FIRE, SHOCK OR DEATH: TURN OFF 

POWER SUPPLYING THIS EQUIPMENT, AND CONFIRM 

POWER IS OFF,

 before installing, removing or servicing this 

equipment.

Step 1: Enclosure Knockouts

NOTE: 

Before removing any knockouts from the enclosure, consult 

the local electrical code to determine the knockout requirements.

a.

 To remove 

knockouts (A)

, first strike the center of the knockout.

b.

  Pry each 

ring (B)

 up, one at a time, and grip both ends with a pair 

of pliers.

c.

   Use the pliers to bend the rings until they disconnect from the 

enclosure 

(fig. 1)

.

Step 2: Enclosure Mounting

Surface Mounting
NOTE: 

Leviton

®

 load centers can be inverted for bottom feed 

applications.

a.

  

Keyholes (C)

 at the top and bottom of the enclosure are provided 

to assist in the alignment and leveling of the enclosure 

(fig. 2)

.

b.

  Temporary screws or nails (not provided) should be used in these 

keyholes during alignment and leveling. 

c.

  Four (x4) 

mounting holes (D)

 have been precut in the back of the 

enclosure for ease of installation 

(fig. 2)

.

d.

  Use screws or nails (not provided) in these four (x4) 

mounting 

holes (D)

 to secure the enclosure to the wall.

e.

  Remove the temporary screws or nails that were used to align 

and level the enclosure through the 

keyholes (C)

.

Flush Mounting
NOTE: 

Leviton

 load centers can be inverted for bottom feed applications.

a.

  Four (x4) 

mounting slots (E)

 have been precut on the side of the 

enclosure for installation between studs.

b.

  Pierce the 

foil tape (F)

 on side of enclosure with a mounting 

screw or nail. 

c.

  If using 1/2 inch sheetrock, align the embossed (1/2) line with the 

front of the stud to achieve optimal flush mounting 

(fig. 3)

.

d.

  Use the 

mounting slots (E)

 on both sides of enclosure to mount 

the enclosure with screws or nails (not provided) 

(fig. 3)

.

Step 3: Phase, Neutral and Ground Conductors

WARNING: 

Use 

ONLY

 approved fittings and clamps to avoid 

damage to wires.

a.

  Bring the 

phase wires (G)

neutral (H)

 and 

ground (I)

 conductors 

into the enclosure through the predetermined knockouts.

b.

  Determine whether or not the application requires the use of a 

main circuit breaker (J) 

(fig. 4)

, or if 

main lugs (K)

 

(fig. 5)

 can 

be used based on the local electrical codes.

Fig. 1

Fig. 2

Fig. 3

a.

b.

c.

•  

TO AVOID FIRE, SHOCK OR DEATH: TURN OFF POWER SUPPLYING THIS EQUIPMENT, AND CONFIRM POWER IS OFF,

  

before installing, removing or servicing this equipment.

•  This equipment 

MUST BE

 installed and serviced by an electrician.

•  Replace all doors and covers before connecting power to this equipment.
•  To be installed and/or used in accordance with electrical codes and regulations.

Knockouts 

(A)

Rings 

(B)

Rings 

(B)

Foil t

a

pe

(F) (x4)

Mounting slots

(E) (x4)

1/2 in. line

Keyhole (C)

Mounting

holes

(D) (x4)

Keyhole (C)

WEB 