background image

Solar-ready 

Combination Service Entrance Device (CSED)

Cat Nos. LPxxx-SRL, LPxxx-SR

INSTALLATION INSTRUCTIONS

ENGLISH

PK-A3305-10-00-5A

WARNINGS

•   

TO AVOID FIRE, SHOCK, OR DEATH, TURN OFF ALL POWER SERVICING THE DEVICE, TEST THAT POWER IS 
OFF BEFORE SERVICING OR WIRING 

and ensure connections are made in the same sequence as existing device 

connections.

•   This equipment 

MUST BE

 installed and serviced by a qualified electrician.

•   Leviton circuit breakers 

MUST BE

 used with a Leviton circuit breaker enclosure.

•  Before providing power to the load center, check all electrical connections and confirm that the wiring is correct.
•  Replace all doors and covers before connecting power to this equipment.

CAUTIONS

•  Use ONLY approved fittings and clamps to avoid damage to wires.
•  Ensure that all branch circuit breakers are in the OFF position before installing into the panel.
•  To be installed and/or used in accordance with electrical codes and regulations.

1.

  

Remove Compartment Covers

2.

  

Install 5th Jaw Application (Optional)

3.

  

Remove the Load Center Door (Optional)

4.

  

Mount the Enclosure

6.

  

Connect to Phase, Neutral and Ground Conductors

5.

  

Remove Knockouts  for Bottom Feed Wiring

Installation

c.  

Connect to the neutral bar using 
the opening next to the ground 
lug in the service chamber. 

NOTE

: The wire retention channel can be used to ensure wire stays in place.

The load center door can be removed for easier installation.

NOTE: 

When installation is complete, align the door hinge with 

the hinge pin and insert downward until door is seated.

This panel series can only be mounted in a semi-flush manner. Consult the local electrical 
code to determine the proper installation height. The right side of the panel has a meter socket 
centerline marking that can be referenced to achieve the proper installation height.

 To mount the unit, use the mounting brackets on the left and right outside perimeter of the panel. 
Use outdoor approved screws or nails (not provided) in the mounting brackets to secure the 
enclosure to the wall studs.

Mount a minimum of 12 inches away from an adjacent wall to the right side of the panel to allow 
ample room for accessing the door latch.

NOTE

: Install unit within rough opening of dwelling and seal off all gaps around the flange and 

enclosure body to the rough opening in the wall. Apply a minimum 1 inch overlap of all-weather 
flashing tape, or equivalent over mounting flanges.

NOTE

: -SRL models suitable only for use as service equipment. Install no more than six main 

disconnecting means.

CAUTION

: Use ONLY approved fittings and clamps to avoid damage to wires.

a.

  Bring the phase, neutral and ground conductors into the enclosure’s service chamber.

b.

  Connect the phase, neutral and ground conductors to the appropriate terminals and 

torque to spec. You may reference the wire terminal table inside the panel door.

NOTE: 

For top feed wiring, use the overhead tunnel accessory and follow the instructions 

(sold separately).

NOTE

: Before removing any knockouts from the enclosure, consult the local electrical code to 

determine the knockout requirements.

PHASE

NEUTRAL

GROUND

b.

b.

b.

a.

a.

a.

a.

  Strike the center of 

the knockout.

b.

  Pry each ring up one at a 

time with a pair of pliers.

c.

  Grip both ends with the pliers 

to bend the rings until they 
disconnect from the enclosure. 

WEB 

VERSION

Отзывы: