Figure 2-2
"
Power Plug
1. The power line of the switch adopts a single-phase three wire power socket, the
middle pin is the grounding wire, the left pin is the zero wire, and the right pin is the live
wire. Please check before operation. Figure 2-3
Connect the power cable
1. Check that the selected power supply is consistent with the power supply requirements
marked on the switch
#
2. Built in without power adapter, it can be directly connected to AC100 ~ 240V, 50 ~
60Hz mains power; As shown in Figure 2-4
Connect SFP port
The process of installing the optical fiber module in the switch is as follows
!
Grasp the optical fiber module from the side and insert it smoothly along the SFP port
slot of the switch until the optical fiber module is in close contact with the switch, as
shown in Figure 2-5
"
Figure 2-5
Installation inspection
Please check the following items after installation
!
Содержание GEP-2841
Страница 1: ...Web Management Guide GEP 2841...