Start-up
34
ROD4… plus
Leuze electronic
Notice!
Before commissioning the device, you must adjust the device parameters and the detection
fields for your application. To do this, configure the ROD4…plus using the
RODsoft
software
user manual so that the detection fields are optimised for the monitoring task.
6.3
Screwing down and aligning the device
The ROD4…plus is to be mounted and aligned as described in chapter 4.
6.4
Switch on the device
Once the device is installed, the required device parameters set and the detection fields
defined, the ROD4…plus can be put into operation.
After you have switched on the voltage supply of the ROD4…plus, illumination of the red
LED on the interface box indicates the operational readiness of the ROD4…plus.