background image

15 

Hardware Installation 

Installation Steps 

This section will explain how to install EG2-0501-SFP series.

 

 

Installation Steps

 

Step 1. 

Unpack the industrial Ethernet switch from the original packing box.

 

Step 2. 

Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.

 

 

If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the 

DIN-Rail 

Mounting

 section for DIN-Rail installation.

 

 

If you want to wall mount the industrial Ethernet switch, please refer to the 

Wall Mounting

 

section for wall mounting installation.

 

Step 3. 

To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the 

Mounting 

Installation

 section.

 

Step 4. 

Power on the industrial Ethernet switch and then the power LED light will turn on.

 

 

If you need help on how to wire power, please refer to the 

Wiring the Power Inputs

 section.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 5. 

Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.

 

Step 6. 

Insert one side of the RJ-45 cable into switch’s Ethernet port and on the other side into 

the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ-45) 

LED  on  the  industrial  Ethernet  switch  will  turn  on  when  the  cable  is  connected  to  the 

networking device.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 7. 

When  all  connections  are  set  and  the  LED  lights  all  show  normal,  the  installation  is 

complete.

 

Содержание EG2-0501-SFP Series

Страница 1: ...Leonton EG2 0501 SFP Series EG2 0501 SFP EG2 0501 SFP T User Manual Version 1 0...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Страница 3: ...the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between t...

Страница 4: ...sical Dimensions 3 Front Panel 4 Top View 4 LED Indicators 5 Ethernet Ports 6 Cabling 7 Wiring the Power Inputs 9 Wiring the Fault Alarm Contact 10 DIP Switch Settings 11 Mounting Installation 12 DIN...

Страница 5: ...f 10 C 65 C and another with a wide operating temperature of 40 C 75 C this series is designed to meet any needs for industrial automation application and harsh environments Key Features Interface Per...

Страница 6: ...tion If the DC voltage is supplied by an external circuit please use a protection device on the power supply input Supply by UL Listed industrial use power The industrial Ethernet switch s hardware sp...

Страница 7: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of EG2 0501 SFP series W x H x D is 30mm x 142mm x 99mm Figure 2 1 EG2 0501 SFP Series Physical Dimensions...

Страница 8: ...shown below in Figure 2 2 Figure 2 2 The Front Panel of EG2 0501 SFP Series Top View Figure 2 3 below shows the top panel of the EG2 0501 SFP series switch that is equipped with one 6 pin removal ter...

Страница 9: ...ctive P2 Green On Power input 2 is active Off Power input 2 is inactive Fault Red On Power input 1 or 2 is inactive Off Power input 1 and 2 are both functional SFP Port LINK ACT Green On Connected to...

Страница 10: ...aight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45 P...

Страница 11: ...t optical transceiver used in optical communications for both telecommunication and data communication applications To connect the transceiver and LC cable please follow below steps Step 1 Insert the...

Страница 12: ...ure 2 11 Figure 2 11 LC Connector to the Transceiver To remove the LC connector from the transceiver please follow the steps shown below Step 1 Press the upper side of the LC connector from the transc...

Страница 13: ...Please follow the below steps to insert the power wire Step 1 Insert the positive and negative wires into the PWR1 V1 V1 and PWR2 V2 V2 contacts on the terminal block connector as shown below in Figu...

Страница 14: ...2 16 By inserting the wires it will detect the fault status including power failure or port link failure managed industrial switch only and form a normally open circuit An application example for the...

Страница 15: ...IP Switch Settings The following describes the DIP switch settings DIP Switch ON OFF 1 Enable Energy Efficient Ethernet Disable Energy Efficient Ethernet 2 Set SFP speed to 100Mbps Set SFP speed to 1G...

Страница 16: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Страница 17: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Страница 18: ...ottom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket...

Страница 19: ...o the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Power...

Страница 20: ...assist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicat...

Отзывы: