INSTALLATION ADJUSTMENT SERVICE

TM-1520A-DT, TM-2020A-DT PARALLEL SYSTEMS

Note: Each individual valve assembly is ASSE 1017 listed.

IMPORTANT! Provide serial numbers for both valves when ordering parts!!

INSTALLATION

LEONARD VALVE CO.

CRANSTON RI USA

U S.   Pa ten ts   2 .97 0,             3 ,0 61 ,1 95   3 .152,760

TYP  TM

20

4

0

°F

0

140

30

10

0

20

60

LEONARD

-10

°C

0

10

50

12

0

40

R

60

80

LEONARD VALVE CO.

CRANSTON RI USA

U S.  Pa te nt s  2 .9 70 ,            3, 06 1,1 9 5  3 .1 52,760

TYP   TM

28"

39"

HOT

COLD

H

C

ASSE
1 017

LEONARD

THERMOSTATIC

3"

33 1/2"

43"

HOT

COLD

10

- 10

20

0

40

140

°F

0

60

°C

50

LEONARD

20

40

R

30

12

0

10

0

60

80

L

C

THERMOSTATIC

LEONARD

H

C

1 017

ASSE

TM-2020A-DT

TM-1520A-DT

4. Flush pipes thoroughly after system has been 

connected.

5. Assemblies installed on a recirculated hot water system  

MUST

be piped according to 

LEONARD’S 

REQUIRED PIPING METHOD #5

(see page 4).

6. Refer to page 3 of this bulletin for correct Setup 

Instructions.  

1. Type TM Parallel Systems are factory pre-assembled and 

tested and include large and small thermostatic water 
mixing valves which function as a system to meet both 
high and low demand for tempered water.

2. System should be installed at a location where it can 

easily be cleaned, adjusted or repaired.

3. System supplies must be connected as shown (Hot-left, 

Cold-right). Exercise caution when soldering.

Maximum Operating Pressure 125PSI (860 KPA) for Hot and Cold Water.

CAUTION

All thermostatic water-mixing valves have limitations. They will not provide the desired 
accuracy outside of their flow capacity range. Consult the capacity chart on page 12. Minimum 
flow must be no less than as shown.

1360 Elmwood Avenue, Cranston, RI 02910 USA

Phone: 401.461.1200 Fax: 401.941.5310

Email: 

[email protected]

Web Site: http://www.leonardvalve.com

Содержание TM-1520A-DT

Страница 1: ...tem MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions 1 Type TM Parallel Systems are factory pre assembled and...

Страница 2: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Страница 3: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Страница 4: ...t V1L set outlet temperature of SVR mixing valve to the same temperature as STEP 7 14 Open all outlets System is operational To balance circulation system temperature see page 5 1 The Parallel Unit MU...

Страница 5: ...G VALVE 1 APPROXIMATELY HALF WAY AND START CIRCULATOR KEEP BALANCE VALVE 2 CLOSED AT THIS TIME 2 OBSERVE TEMPERATURE UNTIL IT STABILIZES 3 CLOSE BALANCING VALVE 1 SLIGHTLY IF TEMPERATURE IS TOO HOT OR...

Страница 6: ...will go then screw the port sleeve nut into the base The port sleeve and thimble may be lifted out SEE DWG BELOW 5 Clean in a non corrosive cleaning solution DO NOT USE ABRASIVES The port sleeve shoul...

Страница 7: ...TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 PORT SLEEVE 313 ASSY 4724 SCREEN PACKING LOWER STEM NUT ASSY PORT SLEEVE 2 EA 4733 SPRING POINTER ROD MU 5...

Страница 8: ...CKING 013 MU 5A O RING SCREEN 4519 UPPER STEM 03 05 PACKING PKG 2 EACH KIT R 28 REBUILDING KIT KIT 2 28Y CHECKSTOP KIT 013 SCREEN CONTROL ASSEMBLY KIT 1 28Y PACKINGS GASKETS LOWER STEM O RING 2 EACH H...

Страница 9: ...oil remove coil sleeve stud and take off thermostat group 6 Clean with a non corrosive cleaning solution DO NOT USE ABRASIVES 7 When reassembling make sure driving ball of thermostat group engages the...

Страница 10: ...rial s 09 125 RF CP 152 Serial s 2 EA 03 LOWER STEM PACKING COIL SLEEVE TM 8 STUD 03 PACKING LOWER STEM 2 EA 014 CAP PACKING CAP PACKING SPRING 1529 014 O RING MU 5A O RING MU 5A NUT ASSY PORT SLEEVE...

Страница 11: ...SLEEVE POINTER ROD NUT RETAINING RING POINTER SCREW W WASHER 57 M M20 3B M20 1B BRIDGE P S PACKING 2 REQ D 2 REQ D HOLDER NUT O RING M20 6B 2 REQ D M20 14B DRIVING BRIDGE ASSEMBLY M 20 1 8B POINTER ST...

Страница 12: ...8 825 734 442 640 10 169 7 117 3 5 194 218 15 97 1 4 20 1120 977 1067 927 245 258 1 7 25 2 1 30 282 296 2 4 35 40 2 8 l min 1215 1283 321 339 3 1 45 3 4 50 GPM PSI BAR TM 2020A DT PARALLEL LIMITED WA...

Отзывы: