Commissioning
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3
Commissioning
Tip!
• Information on some of the operating statuses can quickly be obtained via the
on the front of the inverter.
•
Check firmware:
Particularly with regard to the use of an older inverter (e.g. if the
customer is using one from stock) it makes sense to check the software (firmware)
version. The software version of the inverter can be seen on the nameplate in the "SW"
line and can be determined by reading out code
•
Restore delivery status:
to "1: On / start" to reset all parameter
settings of the device to the Lenze setting. This leaves you with a defined device
configuration.
Danger!
Unexpected motor movements can occur
Under certain conditions the motor may rotate after mains connection.
Possible consequences:
• Persons in the vicinity of the machine or plant risk getting hurt.
• Unexpected starting action may damage the machine or plant.
Protective measures:
• Commissioning with external 24 V supply and without mains voltage. In this case, the
inverter can only be parameterised and diagnosed during commissioning.
• Ensure that setpoints are not active.
The following chapters describe the commissioning of the available technology
applications with the »Engineer«.
Information on how to commission using the keypad (or diagnosis terminal) can be
found in the
8400 hardware manual
. The hardware manual has been stored in electronic
form on the data carrier supplied with the 8400 inverter.