Motor connection
To connect the motor correctly, you must follow:
•
The notes in the terminal box of the motor.
•
The notes in the configuration document of the motor.
•
The technical data on the motor nameplate.
Second ground connection on the motor
According to standard EN 61800-5-1, an additional PE conductor is required if the leakage
current is greater than 3.5 mA for AC current or greater than 10 mA for DC current.
Scope of delivery when selecting a 2nd grounding point:
•
Toothed lock washer
•
Washer
•
Fixing screw
An additional grounding cable is not included in the scope of delivery.
The dimensioning of the grounding is done by the customer.
Electrical installation
Motor connection
36
Содержание IE2 g500-S
Страница 2: ......
Страница 26: ...Dimensions Dimensions are contained in the configuration document Mechanical installation Dimensions 26...
Страница 53: ...Template Dipsticks for G50BS122 100 mm 50 10 0 M1 M3 M4 M6 M2 M5 Maintenance Maintenance work 53...
Страница 54: ...Template Dipsticks for G50BS140 M1 M3 M6 M5 M2 M4 mm 100 50 10 0 Maintenance Maintenance work 54...