Step 3. If there is a power supply filler installed, remove it.
Figure 75. Hot-swap power supply filler removal
Step 4. Slide the new hot-swap power supply into the bay until the release latch clicks into place.
Figure 76. Hot-swap power supply installation
After installing the power supply:
1. Connect one end of the power cord to the new power supply connector; then, connect the other end of
the power cord into a properly grounded electrical outlet.
2. If the server is powered off, power on the server. Ensure that both the power input LED and the power
output LED on the power supply are lit, indicating that the power supply is operating properly.
RAID super capacitor module replacement
Use this information to remove and install a RAID super capacitor module.
.
Hardware replacement procedures
101
Содержание ThinkSystem SR550
Страница 1: ...ThinkSystem SR550 Maintenance Manual Machine Types 7X03 and 7X04 ...
Страница 8: ...vi ThinkSystem SR550 Maintenance Manual ...
Страница 49: ...Chapter 2 Server components 41 ...
Страница 60: ...52 ThinkSystem SR550 Maintenance Manual ...
Страница 113: ...Figure 80 Riser 1 assembly removal Chapter 3 Hardware replacement procedures 105 ...
Страница 174: ...166 ThinkSystem SR550 Maintenance Manual ...
Страница 192: ...184 ThinkSystem SR550 Maintenance Manual ...
Страница 196: ...188 ThinkSystem SR550 Maintenance Manual ...
Страница 200: ...192 ThinkSystem SR550 Maintenance Manual ...
Страница 205: ......
Страница 206: ......