Figure 86. Managing cables with the upper air baffle
Figure 87. Managing cables with the lower air baffle
• Bundle signal cables together in a rectangle so that the air-baffle sliders are closed as far as possible. Do
not bundle signal cables together in a circular formation.
Raised-floor environment
The following illustrations show routing and securing the hoses in a raised-floor environment for individual
racks and adjacent racks.
78
ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide
Содержание ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Страница 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Страница 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Страница 145: ...Figure 159 Installing a rear cable management bracket Chapter 5 Hardware removal installation and reversion 141 ...
Страница 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 153: ......
Страница 154: ......