Figure 154. Installing the outrigger stabilizing bars
Align the two stabilizing bars with the bottom of the rack cabinet.
Secure the two stabilizing bars with eight screws.
Step 4. If you intend to move the rack cabinet, shorten the leveling pads until the cabinet weight is solely on
the outriggers.
Figure 155. Shortening the leveling pads
Installing and removing cable management brackets
See this topic to learn how to remove and install the cable management brackets.
Remove a cable management bracket
See this topic to learn how to remove a cable management bracket.
.
Hardware removal, installation and reversion
137
Содержание ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Страница 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Страница 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Страница 145: ...Figure 159 Installing a rear cable management bracket Chapter 5 Hardware removal installation and reversion 141 ...
Страница 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 153: ......
Страница 154: ......