60
Installation
3-The Storage Management Console is introduced in
. See the Storage Manager Guide or online help for
additional information.
Planning for installation
Before beginning the enclosure installation, familiarize yourself with the system configuration requirements. The
figures listed below show the locations for each plug-in module:
•
•
•
2U controller enclosure rear panel: see
•
2U expansion enclosure rear panel: see
•
(eBezel) and
(drawer with slot index)
•
5U expansion enclosure rear panel: see
(product option)
IMPORTANT:
Installation work should be performed by qualified service personnel.
NOTE: Whether 2U or 5U, DS EXP enclosures use a common expansion module. See
.
Preparing for installation
NOTE: Enclosure configurations
•
2U enclosures are delivered with CRUs and all drive carrier modules installed.
•
5U enclosures are delivered with many CRUs installed; however, DDICs must be installed during system setup.
CAUTION:
Lifting enclosures
•
A 2U enclosure—together will all its component parts—is too heavy for one person to lift and install into the
rack cabinet. Two people are required to safely move a 2U enclosure.
Table 10 Storage system configuration
Module type Location
Description
Drive carrier
modules
2U Front
panel
All drive slots must hold either a drive carrier or dummy drive carrier module.
Empty slots are not allowed. At least one disk must be installed.
DDIC
5U Front
panel
drawers
Maximum 84 disks are installed (42 disks per drawer)
Minimum 14 disks are required. Follow drawer population rules on
Power cooling
modules
2U Rear
panel
Two PCMs provide full power redundancy, allowing the system to continue to
operate while a faulty PCM is replaced.
Power supply
unit modules
5U Rear
panel
Two PSUs provide full power redundancy, allowing the system to continue to
operate while a faulty PSU is replaced.
Fan cooling
modules
5U rear panel Five FCMs provide airflow circulation, maintaining all system components
below the maximum temperature allowed.
I/O modules
Rear panel
Two IOMs must be installed for this configuration (RBOD and EBOD).
Содержание ThinkSystem D3284
Страница 136: ...136 Module removal and replacement 5 Pull the DDIC upwards and out of the drawer slot Figure 96 Removing a DDIC 2 of 2 ...
Страница 145: ...Replacing an IOM 145 5 Reconnect the cables 6 See Verifying component operation page 132 ...
Страница 152: ...152 Standards and regulations Taiwan BSMI RoHS declaration ...