Verify component operation 157
Figure 107 Install a qualified SFP option into an DS2200 FC/iSCSI controller module
Verify component operation
View the CNC port Link Status/Link Activity LED on the controller canister face plate. A green LED indicates that
the port is connected and the link is up:
•
For FC SFPs, see
, and refer to table entry No.1
•
For 10GbE iSCSI SFPs, see
or
, and refer to table entry No.2
•
For 1Gb iSCSI SFPs, see
or
, and refer to table entry No.2
NOTE:
To remove an external SFP connector, perform the installation steps in
reverse
order relative to what is
“Install an SFP transceiver” (page 156)
Canister face plate
Target CNC port
Installed SFP
(actuator closed)
Fiber-optic interface cable
Align SFP for installation
(plug removed/actuator open)
Содержание ThinkSystem D3284
Страница 136: ...136 Module removal and replacement 5 Pull the DDIC upwards and out of the drawer slot Figure 96 Removing a DDIC 2 of 2 ...
Страница 145: ...Replacing an IOM 145 5 Reconnect the cables 6 See Verifying component operation page 132 ...