![Lenovo System x3250 M5 Скачать руководство пользователя страница 253](http://html.mh-extra.com/html/lenovo/system-x3250-m5/system-x3250-m5_installation-and-service-manual_202655253.webp)
Figure 167. Hardware RAID signal cable routing for redundant power supply (Hardware RAID card inserted on
the left side)
Step 8.
Reinstall the cover (see “Replacing the cover” on page 158).
Step 9.
Reinstall the hard disk drives and filler panels (see “Replacing a hot-swap hard disk drive” on page
174 and “Replacing a simple-swap hard disk drive” on page 177).
What to do next
1. Install the server into the rack enclosure and push the server into the rack until it clicks into place.
2. Reconnect the power cords and any cables that you removed.
3. Turn on the peripheral devices and the server.
Removing and replacing Tier 2 CRUs
This section provides information for removing and replacing Tier 2 CRUs in the server.
You may install a Tier 2 CRU yourself or request Lenovo to install it, at no additional charge, under the type
of warranty service that is designated for your server.
The illustrations in this document might differ slightly from your hardware.
Removing and replacing server components
239
Содержание System x3250 M5
Страница 1: ...Lenovo System x3250 M5 Installation and Service Guide Machine Type Type 5458 ...
Страница 6: ...iv Lenovo System x3250 M5Installation and Service Guide ...
Страница 36: ...22 Lenovo System x3250 M5Installation and Service Guide ...
Страница 98: ...84 Lenovo System x3250 M5Installation and Service Guide ...
Страница 122: ...108 Lenovo System x3250 M5Installation and Service Guide ...
Страница 162: ...Figure 84 Server components 148 Lenovo System x3250 M5Installation and Service Guide ...
Страница 546: ...532 Lenovo System x3250 M5Installation and Service Guide ...
Страница 722: ...708 Lenovo System x3250 M5Installation and Service Guide ...
Страница 738: ...724 Lenovo System x3250 M5Installation and Service Guide ...
Страница 739: ......
Страница 740: ......