Statement 21
CAUTION:
Hazardous energy is present when the blade server is connected to the power source. Always replace
the blade cover before installing the blade server.
Installing an expansion unit
Use these instructions to install an expansion unit or for the topmost blade server in a scalable blade
complex.
Attention:
You cannot insert the blade server into the BladeCenter chassis until the cover is installed and
closed. Do not attempt to override this protection.
Statement 21
CAUTION:
Hazardous energy is present when the blade server is connected to the power source. Always replace
the blade cover before installing the blade server.
Blade server
cover release
Blade server
cover release
Cover
Pins
To install and close the blade server cover, complete the following steps:
Step 1. Before you begin, read “Safety” on page v and “Installation guidelines” on page 65.
.
Removing and replacing blade server components
75
Содержание BladeCenter HX5 1909
Страница 6: ...iv BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 16: ......
Страница 34: ...18 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 72: ...56 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 292: ...276 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 296: ...280 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 303: ...Taiwan Class A compliance statement Appendix B Notices 287 ...
Страница 304: ...288 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 310: ...294 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 311: ......
Страница 312: ...Part Number 46W8208 Printed in China 1P P N 46W8208 ...
Страница 313: ... 1P46W8208 ...