background image

ThinkSystem SR670 V2  
Maintenance Manual

Machine Types: 

7Z22, 7Z23

Содержание 7Z22

Страница 1: ...ThinkSystem SR670 V2 Maintenance Manual Machine Types 7Z22 7Z23 ...

Страница 2: ... addition be sure that you are familiar with the terms and conditions of the Lenovo warranty for your server which can be found at http datacentersupport lenovo com warrantylookup Second Edition June 2021 Copyright Lenovo 2021 LIMITED AND RESTRICTED RIGHTS NOTICE If data or software is delivered pursuant to a General Services Administration GSA contract use reproduction or disclosure is subject to...

Страница 3: ...ing 77 4 DW GPU Model with 4x 3 5 inch drives cable routing 81 Configuration B cable routing 83 Configuration B with HBA RAID adapter cable routing 88 8 DW GPU Model cable routing 93 Configuration D cable routing 95 Configuration E cable routing 101 SXM GPU Model cable routing 106 Configuration F cable routing 108 Configuration G cable routing 114 Chapter 4 Hardware replacement procedures 121 Inst...

Страница 4: ... parts replacement 328 Chapter 5 Problem determination 331 Event logs 331 Light Path Diagnostics 333 Front panel 333 External LCD diagnostics handset 334 Power supply LEDs 341 System board LEDs 342 General problem determination procedures 345 Resolving suspected power problems 346 Resolving suspected Ethernet controller problems 346 Troubleshooting by symptom 347 Power on and power off problems 34...

Страница 5: ...eiligheidsvoorschriften Ennen kuin asennat tämän tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de sécurité Vor der Installation dieses Produkts die Sicherheitshinweise lesen Prima di installare questo prodotto leggere le Informazioni sulla Sicurezza Les sikkerhetsinformasjonen Safety Information før du installerer dette produktet Antes de ins...

Страница 6: ...hnology Lenovo assumes you are qualified in the servicing of equipment and trained in recognizing hazards energy levels in products Access to the equipment is by the use of a tool lock and key or other means of security and is controlled by the authority responsible for the location Important Electrical grounding of the server is required for operator safety and correct system function Proper grou...

Страница 7: ...yed or worn 3 Check for any obvious non Lenovo alterations Use good judgment as to the safety of any non Lenovo alterations 4 Check inside the server for any obvious unsafe conditions such as metal filings contamination water or other liquid or signs of fire or smoke damage 5 Check for worn frayed or pinched cables 6 Make sure that the power supply cover fasteners screws or rivets have not been re...

Страница 8: ...vi ThinkSystem SR670 V2 Maintenance Manual ...

Страница 9: ...wing information is a summary of the features and specifications of the server Depending on the model some features might not be available or some specifications might not apply The ThinkSystem SR670 V2 models are listed as below The 4 DW GPU Model The 8 DW GPU Model The SXM GPU Model Refer to the following tables for server general specification and model unique specifications General specificati...

Страница 10: ... 11 2 GT s Supports TDP up to 270 watts For a list of supported processors see https static lenovo com us en serverproven index shtml Memory Capacity Minimum 32 GB Maximum RDIMM 2 TB Persistent Memory PMEM RDIMM 3TB Memory module types Double data rate 4 TruDDR4 error correcting code ECC 3200 MT s registered DIMM RDIMM Persistent Memory PMEM Capacity RDIMM 16 GB 2Rx8 32 GB 2Rx4 2Rx8 and 64 GB 2Rx4...

Страница 11: ... Optional One serial port connector on the rear of the server2 Notes 1 Available when the front I O module is installed in the server 2 Available when the serial port cable is installed in the server Network OCP 3 0 Ethernet network adapter Rear button NMI button RAID adapter Hardware RAID 0 1 10 5 50 ThinkSystem 530 8i Internal SAS SATA RAID RAID 0 1 10 5 50 6 60 ThinkSystem 930 8i Internal SAS S...

Страница 12: ...easured in controlled acoustical environments according to procedures specified by ISO7779 and are reported in accordance with ISO 9296 The declared acoustic sound levels are based on the specified configurations which may change depending on configuration conditions SXM configuration two 270W processors thirty two 64 GB DIMMs eight HDD or SSD NVIDIA SXM4 400W two 1P HDR CX6 card GPU Typical confi...

Страница 13: ...formance may be impacted when operating temperature is outside AHSARE A2 specification Air temperature Operating ASHARE Class A2 10 C to 35 C 50 F to 95 F the maximum ambient temperature decreases by 1 C for every 300 m 984 ft increase in altitude above 900 m 2 953 ft Server off 5 C to 45 C 41 F to 113 F Shipment storage 40 C to 60 C 40 F to 140 F Maximum altitude 3 050 m 10 000 ft Relative Humidi...

Страница 14: ...rives The 8 DW GPU Model supports the following storage configuration Up to six hot swap EDSFF drives Expansion slots Front I O expansion board Slot 1 to 2 Front I O expansion board PCI Express 4 0 x16 FH FL Front GPU expansion board Slot 3 to 6 4 DW GPU Model PCI Express 4 0 x16 double wide FH FL Slot 3 to 10 8 DW GPU Model PCIe Express 4 0 x16 double wide single wide FH FL Rear PCIe riser 1 Slot...

Страница 15: ...GPUs Up to eight PCIe x16 single wide FH FL GPUs Note The DisplayPort ports on the Nvidia A40 GPU are not supported when used in the ThinkSystem SR670 V2 Electrical input This server supports up to four units of CFF V4 power supplies with N N redundancy Following is the list of supported types 2400 watt Platinum input power 200 240 VAC 1800 watt Platinum input power 200 240 VAC Important Power sup...

Страница 16: ...losure must be with the same power rating wattage or level Particulate contamination Attention Airborne particulates including metal flakes or particles and reactive gases acting alone or in combination with other environmental factors such as humidity or temperature might pose a risk to the device that is described in this document Risks that are posed by the presence of excessive particulate lev...

Страница 17: ...rement and control systems Airborne contaminants Instrument Society of America Research Triangle Park North Carolina U S A 2 The derivation of the equivalence between the rate of copper corrosion growth in the thickness of the corrosion product in Å month and the rate of weight gain assumes that Cu2S and Cu2O grow in equal proportions 3 The derivation of the equivalence between the rate of silver ...

Страница 18: ...m executing on the server s operating system Off Target update The installation or update is initiated from a computing device interacting directly with the server s Lenovo XClarity Controller UpdateXpress System Packs UXSPs UXSPs are bundled updates designed and tested to provide the interdependent level of functionality performance and compatibility UXSPs are server machine type specific and are...

Страница 19: ...d Out of band On Target Off Target All I O devices Lenovo XClarity Essentials Bootable Media Creator3 BOMC In band On Target All I O devices BOMC applica tion BOMC applica tion Lenovo XClarity Administrator LXCA In band1 Out of band2 Off Target All I O devices Lenovo XClarity Integrator LXCI for VMware vCenter Out of band Off Target Selected I O devices Lenovo XClarity Integrator LXCI for Microsof...

Страница 20: ...update through Windows or Linux the operating system driver must be installed and the Ethernet over USB sometimes called LAN over USB interface must be enabled Additional information about configuring Ethernet over USB is available at http sysmgt lenovofiles com help topic com lenovo systems management xcc doc NN1ia_c_ configuringUSB html If you update firmware through the Lenovo XClarity Controll...

Страница 21: ...istrator are available at http sysmgt lenovofiles com help topic com lenovo lxca doc update_fw html Lenovo XClarity Integrator offerings Lenovo XClarity Integrator offerings can integrate management features of Lenovo XClarity Administrator and your server with software used in a certain deployment infrastructure such as VMware vCenter Microsoft Admin Center or Microsoft System Center Specific det...

Страница 22: ...when it is connected to a power source allowing the Lenovo XClarity Controller to respond to remote power on requests To remove all power from the server power status LED off you must disconnect all power cables To place the server in a standby state power status LED flashes once per second Note The Lenovo XClarity Controller can place the server in a standby state as an automatic response to a cr...

Страница 23: ...containing the machine type model and serial number Figure 2 Location of the machine type model and serial number The model number and serial number are on the ID label on the front of the server as shown in the following illustrations You can also add other system information labels to the front of the server in the customer label spaces XClarity Controller network access label In addition the XC...

Страница 24: ...to the following tables for front view identification of each storage configuration Front view of 2 5 inch drive configuration on page 16 Front view of 3 5 inch drive configuration on page 17 Front view of 2 5 inch drive configuration Figure 4 Front view of 2 5 inch drive configuration Table 5 Components on the front view of 2 5 inch drive configuration 1 Front panel 5 PCIe slot 3 6 2 Drive activi...

Страница 25: ...econd the drive is being identified 4 Front I O module For more information about the front I O module see Front I O module on page 26 5 PCIe slot 3 6 Install PCIe adapters particularly GPUs to these slots These PCIe slots support the following configuration PCIe slot 3 6 PCIe x16 double wide FH FL 6 PCIe slots 1 2 Not available when rear PCIe riser 1 and rear PCIe riser 2 are installed Install PC...

Страница 26: ...is flashing rapidly three times per second the drive is being identified 4 Front I O module For more information about the front I O module see Front I O module on page 26 5 PCIe slot 3 6 Install PCIe adapters particularly GPUs to these slots These PCIe slots support the following configuration PCIe slot 3 6 PCIe x16 double wide FH FL 6 PCIe slots 1 2 Not available when rear PCIe riser 1 and rear ...

Страница 27: ...he chassis 2 Front panel For more information about the front panel see Front panel on page 25 3 Drive activity LED green Each hot swap drive comes with an activity LED When this LED is flashing it indicates that the drive is in use 4 Drive status LED yellow The drive status LED indicates the following status The LED is lit the drive has failed The LED is flashing slowly once per second the drive ...

Страница 28: ...e 26 PCIe Slot 1 and slot 2 PCIe x16 FH FL Install PCIe adapters particularly network adapters to these slots Note Not available when rear PCIe riser 1 and rear PCIe riser 2 are installed 7 ESDFF drive bays bay 0 to 5 Install EDSFF drives to these bays See Install an EDSFF hot swap drive on page 241 for more information 20 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 29: ...es to these bays See Install a 2 5 inch hot swap drive on page 265 3 Drive activity LED green Each hot swap drive comes with an activity LED When this LED is flashing it indicates that the drive is in use 4 Drive status LED yellow The drive status LED indicates the following status The LED is lit the drive has failed The LED is flashing slowly once per second the drive is being rebuilt The LED is ...

Страница 30: ...ment 1 GB RJ 45 connector dedicated to Lenovo XClarity Controller functions 4 NMI button 8 OCP 3 0 Ethernet adapter Note PCIe riser 1 and PCIe riser 2 are not supported in the SXM GPU Model 1 2 PCIe riser Install PCIe adapters into these risers See the following table for PCIe slots corresponding to the risers Table 10 PCIe riser and corresponding slots PCIe riser PCIe slot PCI Express 4 0 x16 FH ...

Страница 31: ...ply is working normally 3 Fault LED Off The power supply is working normally Amber The power supply has failed To resolve the issue replace the power supply 4 NMI button Press this button to force a nonmaskable interrupt to the processor You might have to use a pen or the end of a straightened paper clip to press the button You can also use it to force a blue screen memory dump Use this button onl...

Страница 32: ...1 GB RJ 45 Ethernet port link LED Use this green LED to distinguish the network connectivity status Off The network link is disconnected Green The network link is established 2 1 GB RJ 45 Ethernet port activity LED Use this green LED to distinguish the network activity status Off The server is disconnected from a LAN Green The network is connected and active 8 OCP 3 0 Ethernet adapter The OCP 3 0 ...

Страница 33: ... last approximately 5 to 10 seconds Flashing slowly once per second Green The server is turned off and is ready to be turned on You can press the power button to turn on the server Lit Green The server is turned on 2 Network activity LED green The network activity LED on the front panel helps you identify the network connectivity and activity Status Color Description On Green The server is connect...

Страница 34: ...ermine the exact cause of the error Off None The server is off or the server is on and is working correctly None Front I O module The front I O module of the server provides controls connectors and LEDs The front I O module varies by model The following illustrations show the front I O module for different server models To locate the front I O module see Chapter 2 Server components on page 15 Figu...

Страница 35: ... Controller Shared mode owned by BMC In this mode connection to the USB port is shared by the server and Lenovo XClarity Controller while the port is switched to Lenovo XClarity Controller Shared mode owned by host In this mode connection to the USB port is shared by the server and Lenovo XClarity Controller while the port is switched to the server 2 USB 3 2 Gen 1 Connect a USB 3 2 Gen 1 device su...

Страница 36: ...ndset can be attached to the top or side of the rack with hands spared for service tasks 3 External diagnostics connector This connector is located on the front of the server and is used to connect an external LCD diagnostics handset Note When unplugging the external handset see the following instructions Press the plastic clip on the plug forward Hold the clip and remove the cable from the connec...

Страница 37: ... LCD display and 5 navigation buttons 1 LCD display 2 Scroll buttons up down left right Press the scroll buttons to locate and select system information 3 Select button Press the select button to select from the options in the menu Chapter 2 Server components 29 ...

Страница 38: ...CD diagnostics handset displays various system information Navigate through the options with the scroll keys Depending on the model the options and entries on the LCD display might be different 30 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 39: ...Chapter 2 Server components 31 ...

Страница 40: ...ts Sub Menu Example Home screen Active error quantity Note The Active Alerts menu displays only the quantity of active errors If no errors occur the Active Alerts menu will not be available during navigation 1 Active Alerts Details screen Error message ID Type Error Warning Information Occurrence time Possible sources of the error Active Alerts 1 Press to view alert details FQXSPPU009N Error 04 07...

Страница 41: ...ersion number Release date XCC Backup Active Build D8BT05I Version 1 00 Date 2019 12 30 XCC Network Information Sub Menu Example XCC hostname MAC address IPv4 Network Mask IPv4 DNS IPv6 Link Local IP Stateless IPv6 IP Static IPv6 IP Current IPv6 Gateway IPv6 DNS Note Only the MAC address that is currently in use is displayed extension or shared XCC Network Information XCC Hostname XCC xxxx SN MAC ...

Страница 42: ...set Request XCC Reset Set UEFI Memory Test Clear CMOS Request Virtual Reseat Modify XCC Static IPv4 Address Net mask Gateway Modify System Name Generate Download FFDC Service Data Request XCC Reset This will request the BMC to reboot itself Hold for 3 seconds System board layout The illustrations in this section provide information about the connectors and switches that are available on the system...

Страница 43: ...1 connector 6 PCIe connector 13 27 LCD connector1 7 Front VGA connector1 28 Front panel connector 8 PCIe connector 15 rear PCIe riser 1 29 Fan 5 connector 9 Front USB connector1 30 Fan 4 connector 10 SATA 1 connector 31 Memory module 32 25 left to right 11 SATA 2 connector 32 Processor 2 12 M 2 signal connector 33 Memory module slots 24 9 left to right 13 M 2 power connector 34 Power distribution ...

Страница 44: ...ight 42 Serial port cable connector Note 1 Front I O module cables connect to these connectors System board switches The following illustrations show the location of the switches jumpers and buttons on the server Note If there is a clear protective sticker on the top of the switch blocks you must remove and discard it to access the switches Figure 14 System board switches Important 1 Before you ch...

Страница 45: ...switch only if the normal firmware update procedure fails and the operational firmware image is corrupted Use of this switch disables normal baseboard management controller operation 4 Off Reserved SW2 switch block The following table describes the functions of the SW2 switch block on the system board Table 15 System board SW2 switch block description Switch number Default position Description 1 O...

Страница 46: ...do not leave this switch in the On position 3 Off Reserved Parts list Use the parts list to identify each of the components that are available for your server The ThinkSystem SR670 V2 parts list varies by model Refer to the parts list specific to each model to identify the components The 4 DW GPU Model 2 5 inch drive configuration parts list on page 39 The 4 DW GPU Model 3 5 inch drive configurati...

Страница 47: ...atacentersupport lenovo com tw en products servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your server 2 Enter either the serial number or the machine type model for your server to see the parts for your server It is highly recommended that you check the power summary data for your server using Lenovo Capacity Planner before purchasing any new parts N...

Страница 48: ...Figure 15 Server components of the 4 DW GPU Model 2 5 inch drive configuration parts list 40 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 49: ...nfiguration Index Description Tier 1 CRU Tier 2 CRU FRU Consuma ble and Structural part For more information about ordering the parts shown in Figure 15 Server components of the 4 DW GPU Model 2 5 inch drive configuration parts list on page 40 1 Go to https datacentersupport lenovo com tw en products servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for you...

Страница 50: ...e cage 25 2 5 inch drive filler 8 bay 26 2 5 inch drive filler 4 bay 27 2 5 inch drive filler 1 bay 28 2 5 inch hot swap drive 29 Front panel 30 Front I O module 31 External LCD diagnostics handset 32 Double wide GPU 33 GPU adapter link bridge 34 Four PCIe x16 slot switched PCIe distribution board 35 Four PCIe x16 slot PCIe distribution board 36 Cable 37 Fan cage 38 Fan 39 Air baffle 40 M 2 drive ...

Страница 51: ...tersupport lenovo com tw en products servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your server 2 Enter either the serial number or the machine type model for your server to see the parts for your server It is highly recommended that you check the power summary data for your server using Lenovo Capacity Planner before purchasing any new parts Note De...

Страница 52: ...Figure 16 Server components of the 4 DW GPU Model 3 5 inch drive configuration 44 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 53: ...ve configuration Index Description Tier 1 CRU Tier 2 CRU FRU Consuma ble and Structural part For more information about ordering the parts shown in Figure 16 Server components of the 4 DW GPU Model 3 5 inch drive configuration on page 44 1 Go to https datacentersupport lenovo com tw en products servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your serv...

Страница 54: ...rive backplane 24 3 5 inch drive cage 25 3 5 inch drive filler 1 bay 26 3 5 inch hot swap drive 27 Front panel 28 Front I O module 29 External LCD diagnostics handset 30 Double wide GPU 31 GPU adapter link bridge 32 Four PCIe x16 slot switched PCIe distribution board 33 Four PCIe x16 slot PCIe distribution board 34 Cable 35 Fan cage 36 Fan 37 Air baffle 38 M 2 drive retainer 39 M 2 drive backplane...

Страница 55: ...roducts servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your server 2 Enter either the serial number or the machine type model for your server to see the parts for your server It is highly recommended that you check the power summary data for your server using Lenovo Capacity Planner before purchasing any new parts Note Depending on the model your ser...

Страница 56: ...Figure 17 Server components of the 8 DW GPU Model 48 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 57: ...e 8 DW GPU Model Index Description Tier 1 CRU Tier 2 CRU FRU Consuma ble and Structural part For more information about ordering the parts shown in Figure 17 Server components of the 8 DW GPU Model on page 48 1 Go to https datacentersupport lenovo com tw en products servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your server 2 Enter either the serial ...

Страница 58: ...F drive backplane 24 EDSFF drive cage with cage cover 25 EDSFF drive filler 1 bay 26 EDSFF hot swap drive 27 Front panel 28 Front I O module 29 External LCD diagnostics handset 30 Double wide GPU 31 GPU adapter link bridge 32 Four PCIe x16 slot switched PCIe distribution board 33 Cable 34 Fan cage 35 Fan 36 Air baffle 37 M 2 drive retainer 38 M 2 drive backplane 39 M 2 drive 50 ThinkSystem SR670 V...

Страница 59: ...vers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your server 2 Enter either the serial number or the machine type model for your server to see the parts for your server It is highly recommended that you check the power summary data for your server using Lenovo Capacity Planner before purchasing any new parts Note Depending on the model your server might l...

Страница 60: ...Figure 18 Server components 52 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 61: ...list of the SXM GPU Model Index Description Tier 1 CRU Tier 2 CRU FRU Consuma ble and Structural part For more information about ordering the parts shown in Figure 18 Server components on page 52 1 Go to https datacentersupport lenovo com tw en products servers thinksystem sr670v2 7z22 parts display compatible and navigate to the support page for your server 2 Enter either the serial number or the...

Страница 62: ...y 23 Front I O expansion board 24 External LCD diagnostics handset 25 Front I O module 26 2 5 inch drive filler 1 bay 27 2 5 inch drive 28 Front panel 29 Retimer assembly 30 GPU tray 31 GPU 32 SXM GPU board 33 Lenovo NeptuneTM liquid to air L2A hybrid cooling module 34 Fan cage 35 Fan 36 Air baffle 37 M 2 drive retainer 38 M 2 drive backplane 39 M 2 drive 54 ThinkSystem SR670 V2 Maintenance Manual...

Страница 63: ... Standards Association CSA For units intended to be operated at 115 volts Use a UL listed and CSA certified cord set consisting of a minimum 18 AWG Type SVT or SJT three conductor cord a maximum of 15 feet in length and a parallel blade grounding type attachment plug rated 15 amperes 125 volts For units intended to be operated at 230 volts U S use Use a UL listed and CSA certified cord set consist...

Страница 64: ...56 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 65: ...latches release tabs or locks on cable connectors when you disconnect cables from the system board Failing to release them before removing the cables will damage the cable sockets on the system board which are fragile Any damage to the cable sockets might require replacing the system board Copyright Lenovo 2021 57 ...

Страница 66: ...planes are supported in this server 4 DW GPU Model supports 8x2 5 inch SAS SATA NVMe backplane 4x3 5 inch SAS SATA NVMe backplane 8 DW GPU Model supports 6x EDSFF NVMe backplane SXM GPU Model supports 4x2 5 inch NVMe backplane 8x2 5 inch SAS SATA NVMe backplane See this section to locate the connectors on the drive backplane 1 NVMe 6 7 2 NVMe 4 5 3 SAS SATA 4 Power connector 5 NVMe 2 3 6 NVMe 0 1 ...

Страница 67: ...SATA NVMe backplane See this section to locate the connectors on the drive backplane 1 NVMe 2 3 2 Power connector 3 NVMe 0 1 4 SAS SATA Figure 20 4x3 5 inch SAS SATA NVMe backplane Chapter 3 Internal cable routing 59 ...

Страница 68: ...DSFF 0 1 2 Power connector 3 EDSFF 2 3 4 EDSFF 4 5 Figure 21 6x EDSFF NVMe backplane 4x2 5 inch NVMe backplane See this section to locate the connectors on the drive backplane 1 NVMe 2 3 2 NVMe 0 1 3 Power connector Figure 22 4x2 5 inch NVMe backplane 60 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 69: ...ur PCIe x16 slot switched PCIe distribution board 8 DW GPU Model supports Four PCIe x16 slot switched PCIe distribution board Four PCIe x16 slot PCIe distribution board See this section to locate the connectors on the GPU distribution board 1 PCIe slots for GPU 2 MCIO connectors A to H A B GPU 3 7 C D GPU 4 8 E F GPU 5 9 G H GPU 6 10 3 Power connector Figure 23 Four PCIe x16 slot PCIe distribution...

Страница 70: ...is section to locate the connectors on the GPU distribution board Figure 24 Four PCIe x16 slot switched PCIe distribution board 1 PCIe slots for GPU 2 MCIO connectors A to D A B Uplink 2 C D Uplink 1 3 Power connector 62 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 71: ...O connectors B 2 MCIO connectors A 3 PCIe slot 2 4 PCIe slot 1 Front I O expansion board connectors See this section to locate the connectors in the front I O expansion board Front I O expansion board connectors Figure 26 Front I O expansion board connectors 1 PCIe slots 2 MCIO connectors A to D A B PCIe Slot 1 C D PCIe Slot 2 3 Power connector Chapter 3 Internal cable routing 63 ...

Страница 72: ...assembly Retimer assembly connectors Figure 27 Retimer assembly connectors 1 Backplane power connector 2 Cold plate assembly pump cable connectors 1 to 4 left to right 3 Power connector 4 SXM GPU board connectors A B C D E F G H MCIO connector 64 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 73: ...W GPU Model with 8x 2 5 inch drives configurations Cable routing is different by configuration See the table below for the configuration that matches your server and refer to the corresponding cable routing guide Rear riser 1 Rear riser 2 installed with HBA RAID adatper Front I O expansion board Configurations V Configuration A V V Configuration A with HBA RAID adapter V Configuration C Refer to t...

Страница 74: ...le guide and cable clip as instructed in the cable routing guides See the illustration below for the cable guide and cable clip locations Figure 28 Cable guide and cable clip locations in the chassis 66 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 75: ...ing for Configuration A Configuration A cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Rear riser 1 cable routing 4 OCP Ethernet adapter routing Cabling for these components are illustrated below Chapter 3 Internal cable routing 67 ...

Страница 76: ...e cable routing Configuration A From To Drive backplane 1 NVMe 6 7 System board 1 PCIe connector 11 2 NVMe 4 5 2 PCIe connector 12 3 SAS 3 SATA 1 connector and SATA 2 connector 4 Power connector 4 Backplane power 1 connector 5 NVMe 2 3 5 PCIe connector 16 6 NVMe 0 1 6 PCIe connector 16 68 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 77: ...A GPU 3 System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C GPU 4 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 MCIO connector E GPU 5 5 PCIe connector 8 6 MCIO connector F 6 PCIe connector 7 7 MCIO connector G GPU 6 7 PCIe connector 10 8 MCIO connector H 8 PCIe connector 9 9 Power connector 9 PCIe adapter distribution board power 1 connector Chapt...

Страница 78: ...ing Connect the rear riser 1 signal cable as illustrated Figure 31 Rear riser 1 cable routing Configuration A From To Rear riser 1 1 MCIO connector A System board 1 PCIe connector 2 70 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 79: ...ng Connect the OCP Ethernet adapter signal cable as illustrated Figure 32 OCP Ethernet adapter cable routing Configuration A From To System board 1 PCIe connector 14 System board 1 PCIe connector 1 Chapter 3 Internal cable routing 71 ...

Страница 80: ...A RAID adapter Configuration A with HBA RAID adapter cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Rear riser 1 rear riser 2 and HBA RAID adapter cable routing 4 OCP Ethernet adapter routing Cabling for these components are illustrated below 72 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 81: ...power cable as illustrated Figure 33 Drive backplane cable routing Configuration A with HBA RAID adapter From To Drive backplane 1 SAS System board 1 HBA RAID adapter installed on rear riser 2 2 Power connector 2 Backplane power 1 connector Chapter 3 Internal cable routing 73 ...

Страница 82: ...nector A GPU 3 System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C GPU 4 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 MCIO connector E GPU 5 5 PCIe connector 8 6 MCIO connector F 6 PCIe connector 7 7 MCIO connector G GPU 6 7 PCIe connector 10 8 MCIO connector H 8 PCIe connector 9 9 Power connector 9 PCIe adapter distribution board power 1 connecto...

Страница 83: ...er 1 rear riser 2 and HBA RAID adapter cable routing Configuration A with HBA RAID adapter From To Rear riser 2 1 MCIO connector A System board 1 PCIe connector 12 2 MCIO connector B 2 PCIe connector 11 3 HBA RAID adapter installed on rear riser 2 Drive backplane 3 SAS Rear riser 1 4 MCIO connector A System board 4 PCIe connector 2 Chapter 3 Internal cable routing 75 ...

Страница 84: ... OCP Ethernet adapter signal cable as illustrated Figure 36 OCP Ethernet adapter cable routing Configuration A with HBA RAID adapter From To System board 1 PCIe connector 14 System board 1 PCIe connector 1 76 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 85: ...able routing for Configuration C Configuration C cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Front I O expansion board cable routing Cabling for these components are illustrated below Chapter 3 Internal cable routing 77 ...

Страница 86: ...e cable routing Configuration C From To Drive backplane 1 NVMe 6 7 System board 1 PCIe connector 16 2 NVMe 4 5 2 PCIe connector 16 3 SAS 3 SATA 1 connector and SATA 2 connector 4 Power connector 4 Backplane power 1 connector 5 NVMe 2 3 5 PCIe connector 15 6 NVMe 0 1 6 PCIe connector 15 78 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 87: ...A GPU 3 System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C GPU 4 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 MCIO connector E GPU 5 5 PCIe connector 8 6 MCIO connector F 6 PCIe connector 7 7 MCIO connector G GPU 6 7 PCIe connector 10 8 MCIO connector H 8 PCIe connector 9 9 Power connector 9 PCIe adapter distribution board power 1 connector Chapt...

Страница 88: ...board cable routing Configuration C From To Front I O expansion board 1 MCIO connector A Slot 1 System board 1 PCIe connector 2 2 MCIO connector B 2 PCIe connector 1 3 MCIO connector C Slot 2 3 PCIe connector 12 4 MCIO connector D 4 PCIe connector 11 5 Power connector 5 Front I O expansion board power connector 80 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 89: ... board see Identifying connectors on page 58 4 DW GPU Model with 4x 3 5 inch drives configurations Cable routing is different by configuration See the table below for the configuration that matches your server and refer to the corresponding cable routing guide Rear riser 1 Rear riser 2 Rear rise 2 installed with HBA RAID adapter Configuration V V Configuration B V V Configuration B with HBA RAID a...

Страница 90: ...le guide and cable clip as instructed in the cable routing guides See the illustration below for the cable guide and cable clip locations Figure 40 Cable guide and cable clip locations in the chassis 82 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 91: ...Configuration B Configuration B cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Rear riser 1 and rear riser 2 cable routing 4 OCP Ethernet adapter routing Cabling for these components are illustrated below Chapter 3 Internal cable routing 83 ...

Страница 92: ...ane signal cable and power cable as illustrated Figure 41 Drive backplane cable routing Configuration B From To Drive backplane 1 Power connector System board 1 Backplane power 1 connector 2 SAS 2 SATA 1 connector 84 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 93: ...A GPU 3 System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C GPU 4 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 MCIO connector E GPU 5 5 PCIe connector 8 6 MCIO connector F 6 PCIe connector 7 7 MCIO connector G GPU 6 7 PCIe connector 10 8 MCIO connector H 8 PCIe connector 9 9 Power connector 9 PCIe adapter distribution board power 1 connector Chapt...

Страница 94: ...s as illustrated Figure 43 Rear riser 1 and rear riser 2 cable routing Configuration B From To Rear riser 2 1 MCIO connector A System board 1 PCIe connector 12 2 MCIO connector B 2 PCIe connector 11 Rear riser 1 3 MCIO connector A 3 PCIe connector 2 86 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 95: ...ng Connect the OCP Ethernet adapter signal cable as illustrated Figure 44 OCP Ethernet adapter cable routing Configuration B From To System board 1 PCIe connector 14 System board 1 PCIe connector 1 Chapter 3 Internal cable routing 87 ...

Страница 96: ...A RAID adapter Configuration B with HBA RAID adapter cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Rear riser 1 rear riser 2 and HBA RAID adapter cable routing 4 OCP Ethernet adapter routing Cabling for these components are illustrated below 88 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 97: ...power cable as illustrated Figure 45 Drive backplane cable routing Configuration B with HBA RAID adapter From To Drive backplane 1 Power connector System board 1 Backplane power 1 connector 2 SAS 2 HBA RAID adapter installed on rear riser 2 Chapter 3 Internal cable routing 89 ...

Страница 98: ...nector A GPU 3 System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C GPU 4 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 MCIO connector E GPU 5 5 PCIe connector 8 6 MCIO connector F 6 PCIe connector 7 7 MCIO connector G GPU 6 7 PCIe connector 10 8 MCIO connector H 8 PCIe connector 9 9 Power connector 9 PCIe adapter distribution board power 1 connecto...

Страница 99: ...ear riser 2 and HBA RAID adapter cable routing Configuration B with HBA RAID adapter From To Rear riser 2 1 MCIO connector A System board 1 PCIe connector 12 2 MCIO connector B 2 PCIe connector 11 3 HBA RAID adapter installed on rear riser 2 Drive backplane 3 SAS Rear riser 1 4 MCIO connector A System board 4 PCIe connector 2 Chapter 3 Internal cable routing 91 ...

Страница 100: ... OCP Ethernet adapter signal cable as illustrated Figure 48 OCP Ethernet adapter cable routing Configuration B with HBA RAID adapter From To System board 1 PCIe connector 14 System board 1 PCIe connector 1 92 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 101: ...rd rear riser and front I O expansion board see Identifying connectors on page 58 8 DW GPU Model configurations Cable routing is different by configuration See the table below for the configuration that matches your server and refer to the corresponding cable routing guide Rear riser 1 Front I O expansion board Configurations V Configuration D V Configuration E Refer to the corresponding cable rou...

Страница 102: ...le guide and cable clip as instructed in the cable routing guides See the illustration below for the cable guide and cable clip locations Figure 49 Cable guide and cable clip locations in the chassis 94 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 103: ... for Configuration D Configuration D cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Rear riser 2 cable routing 4 OCP Ethernet adapter cable routing Cabling for these components are illustrated below Chapter 3 Internal cable routing 95 ...

Страница 104: ... illustrated Figure 50 Drive backplane cable routing Configuration D From To Drive backplane 1 EDSFF 0 1 System board 1 PCIe connector 2 2 Power connector 2 Backplane power 1 connector 3 EDSFF 2 3 3 PCIe connector 12 4 EDSFF 4 5 4 PCIe connector 11 96 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 105: ...de 1 MCIO connector A System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 Power connector 5 PCIe adapter distribution board power 1 connector GPU distribution board Left side 6 MCIO connector A 6 PCIe connector 8 7 MCIO connector B 7 PCIe connector 7 8 MCIO connector C 8 PCIe connector 10 Chapter 3 Inte...

Страница 106: ...From To 9 MCIO connector D 9 PCIe connector 9 10 Power connector 10 PCIe adapter distribution board power 2 connector 98 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 107: ...rear riser 2 signal cable as illustrated Figure 52 Rear riser 2 cable routing Configuration D From To Rear riser 2 1 MCIO connector A System board 1 PCIe connector 15 2 MCIO connector B 2 PCIe connector 15 Chapter 3 Internal cable routing 99 ...

Страница 108: ...onnect the OCP Ethernet adapter signal cable as illustrated Figure 53 OCP Ethernet adapter cable routing Configuration D From To System board 1 PCIe connector 14 System board 1 PCIe connector 1 100 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 109: ...able routing for Configuration E Configuration E cable routing includes the following items 1 Drive backplane cable routing 2 GPU distribution board cable routing 3 Front I O expansion board cable routing Cabling for these components are illustrated below Chapter 3 Internal cable routing 101 ...

Страница 110: ...e backplane cable routing Configuration E From To Drive backplane 1 EDSFF 0 1 System board 1 PCIe connector 15 2 Power connector 2 Backplane power 1 connector 3 EDSFF 2 3 3 PCIe connector 16 4 EDSFF 4 5 4 PCIe connector 16 System board 5 PCIe connector 14 5 PCIe connector 15 102 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 111: ...e 1 MCIO connector A System board 1 PCIe connector 4 2 MCIO connector B 2 PCIe connector 3 3 MCIO connector C 3 PCIe connector 6 4 MCIO connector D 4 PCIe connector 5 5 Power connector 5 PCIe adapter distribution board power 1 connector GPU distribution board Left side 6 MCIO connector A 6 PCIe connector 8 7 MCIO connector B 7 PCIe connector 7 8 MCIO connector C 8 PCIe connector 10 Chapter 3 Inter...

Страница 112: ...From To 9 MCIO connector D 9 PCIe connector 9 10 Power connector 10 PCIe adapter distribution board power 2 connector 104 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 113: ...on board cable routing Configuration E From To Front I O expansion board 1 MCIO connector A Slot 1 System board 1 PCIe connector 2 2 MCIO connector B 2 PCIe connector 1 3 MCIO connector C Slot 2 3 PCIe connector 12 4 MCIO connector D 4 PCIe connector 11 5 Power connector 5 Front I O expansion board power connector Chapter 3 Internal cable routing 105 ...

Страница 114: ...and retimer assembly see Identifying connectors on page 58 SXM GPU Model configurations Cable routing is different by configuration See the table below for the configuration that matches your server and refer to the corresponding cable routing guide Drive quantity OCP Ethernet adapter Configurations Eight drives Configuration F Four drives V Configuration G Refer to the corresponding cable routing...

Страница 115: ...cable guide and cable clip as instructed in the cable routing guides See the illustration below for the cable guide and cable clip locations Figure 57 Cable guide and cable clip locations in the chassis Chapter 3 Internal cable routing 107 ...

Страница 116: ...iguration F Configuration F cable routing includes the following components 1 Drive backplane cable routing 2 Front I O expansion board cable routing 3 Retimer assembly cable routing 4 Cold plate assembly cable routing Cabling for these components are illustrated below 108 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 117: ...ation F From To Drive backplane right side 1 NVMe 2 3 System board 1 PCIe connector 16 2 NVMe 0 1 2 PCIe connector 16 3 Power connector 3 Backplane power 1 connector Drive backplane left side 4 NVMe 2 3 4 PCIe connector 15 5 NVMe 0 1 5 PCIe connector 15 6 Power connector Retimer assembly 6 Backplane power connector Chapter 3 Internal cable routing 109 ...

Страница 118: ...oard cable routing Configuration F From To Front I O expansion board 1 MCIO connector B Slot 1 System board 1 PCIe connector 1 2 MCIO connector A 2 PCIe connector 2 3 MCIO connector C Slot 2 3 PCIe connector 12 4 MCIO connector D 4 PCIe connector 11 5 Power connector 5 Front I O expansion board power connector 110 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 119: ...timer assembly signal cables Retimer assembly power cable Connect the retimer assembly power cable as illustrated Figure 60 Retimer assembly cable routing power cable Configuration F From To Retimer assembly 1 Power connector System board 1 PCIe adapter distribution board power 2 connector Chapter 3 Internal cable routing 111 ...

Страница 120: ...mer assembly 1 MCIO connector A System board 1 PCIe connector 10 2 MCIO connector B 2 PCIe connector 9 3 MCIO connector C 3 PCIe connector 8 4 MCIO connector D 4 PCIe connector 7 5 MCIO connector E 5 PCIe connector 6 6 MCIO connector F 6 PCIe connector 5 7 MCIO connector G 7 PCIe connector 4 8 MCIO connector H 8 PCIe connector 3 112 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 121: ...retimer assembly cable routing Configuration F From To Retimer assembly 1 Cold plate assembly pump cable connector 1 Cold plate assembly 1 Cold plate 1 2 Cold plate assembly pump cable connector 2 2 Cold plate 2 3 Cold plate assembly pump cable connector 3 3 Cold plate 3 4 Cold plate assembly pump cable connector 4 4 Cold plate 4 Chapter 3 Internal cable routing 113 ...

Страница 122: ...ration G cable routing includes the following components 1 Drive backplane cable routing 2 OCP Ethernet adapter cable routing 3 Front I O expansion board cable routing 4 Retimer assembly cable routing 5 Cold plate assembly cable routing Cabling for these components are illustrated below 114 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 123: ...wer cable as illustrated Figure 63 Drive backplane cable routing Configuration G From To Drive backplane 1 NVMe 2 3 System board 4 PCIe connector 15 2 NVMe 0 1 5 PCIe connector 15 3 Power connector Retimer assembly 6 Backplane power connector Chapter 3 Internal cable routing 115 ...

Страница 124: ...et adapter signal cables as illustrated Figure 64 OCP Ethernet adapter cable routing Configuration G From To System board 1 PCIe connector 13 System board 1 PCIe connector 15 2 PCIe connector 14 2 PCIe connector 15 116 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 125: ...on board cable routing Configuration G From To Front I O expansion board 1 MCIO connector B Slot 1 System board 1 PCIe connector 1 2 MCIO connector A 2 PCIe connector 2 3 MCIO connector C Slot 2 3 PCIe connector 12 4 MCIO connector D 4 PCIe connector 11 5 Power connector 5 Front I O expansion board power connector Chapter 3 Internal cable routing 117 ...

Страница 126: ...er assembly signal cables Retimer assembly power cable Connect the retimer assembly power cable as illustrated Figure 66 Retimer assembly cable routing power cable Configuration G From To Retimer assembly 1 Power connector System board 1 PCIe adapter distribution board power 2 connector 118 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 127: ...etimer assembly 1 MCIO connector A System board 1 PCIe connector 10 2 MCIO connector B 2 PCIe connector 9 3 MCIO connector C 3 PCIe connector 8 4 MCIO connector D 4 PCIe connector 7 5 MCIO connector E 5 PCIe connector 6 6 MCIO connector F 6 PCIe connector 5 7 MCIO connector G 7 PCIe connector 4 8 MCIO connector H 8 PCIe connector 3 Chapter 3 Internal cable routing 119 ...

Страница 128: ...mer assembly cable routing Configuration G From To Retimer assembly 1 Cold plate assembly pump cable connector 1 Cold plate assembly 1 Cold plate 1 2 Cold plate assembly pump cable connector 2 2 Cold plate 2 3 Cold plate assembly pump cable connector 3 3 Cold plate 3 4 Cold plate assembly pump cable connector 4 4 Cold plate 4 120 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 129: ...p topic safety_documentation pdf_files html The following guidelines are available as well Handling static sensitive devices on page 123 Make sure the components you are installing are supported by your server For a list of supported optional components for the server see https static lenovo com us en serverproven index shtml When you install a new server download and apply the latest firmware Thi...

Страница 130: ...y unsafe conditions with your server As each machine was designed and built required safety items were installed to protect users and service technicians from injury Notes 1 The product is not suitable for use at visual display workplaces according to 2 of the Workplace Regulations 2 The set up of the server is made in the server room only CAUTION This equipment must be installed or serviced by tr...

Страница 131: ...might damage server components Cabling instructions that come with optional components must be followed A failed fan must be replaced within 48 hours after malfunction A removed hot swap fan must be replaced within 30 seconds after removal A removed hot swap drive must be replaced within two minutes after removal A removed hot swap power supply must be replaced within two minutes after removal Eve...

Страница 132: ...es or the frame Do not touch solder joints pins or exposed circuitry Keep the device from others reach to prevent possible damages Server replacement Follow instructions in this section to remove and install the server Remove the server from rack Follow instructions in this section to remove the server from the rack S036 18 32 kg 39 70 lb 32 55 kg 70 121 lb CAUTION Use safe practices when lifting ...

Страница 133: ...05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Loosen the two thumbscrews located on the front of the server to disengage it from the rack Rack front Figure 69 Disengaging server from the rack 1 Thumbscrew Step 2 Hold the mounting ears on the front of the server then slide the server all the way out until it stops Figure 70 Pulling out the server Chapter 4 Ha...

Страница 134: ...p the server 1 Lift point a Press the release tabs to disengage the rails from the server b Carefully lift up the front end of the server slightly to detach the nailheads from the slots on the rails c With three people lift up the serve to remove it from the rails completely Place the server on a flat and sturdy surface 126 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 135: ...arefully lay the server on a flat static protective surface Install the server to rack Follow instructions in this section to install the server to the rack S036 18 32 kg 39 70 lb 32 55 kg 70 121 lb CAUTION Use safe practices when lifting R006 Chapter 4 Hardware replacement procedures 127 ...

Страница 136: ...r on page 14 CAUTION Make sure to have three people operate the server installation procedures to prevent injury Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 From the front of the rack pull the rails all the way ou...

Страница 137: ...lift up the server with three people CAUTION Make sure three people are lifting the sever by holding the lift points Rack front Figure 74 Lifting up the server 1 Lift point Chapter 4 Hardware replacement procedures 129 ...

Страница 138: ...nd make sure the other 3 nailheads on server s left and right side slip into corresponding slots Note Inspect the sides of the rails to make sure the nailheads are placed in the slots Attention You can only install the server successfully when the rails are fully extended Rack front Figure 75 Installing the server into the rails Step 4 Slide the server into rack a Push up the latches on the rails ...

Страница 139: ...Figure 76 Installing the server into the rack 1 Latch Chapter 4 Hardware replacement procedures 131 ...

Страница 140: ...w then fasten the M 5 screw Repeat to secure the other rail Rack rear Figure 77 Securing the server to the rear of the rack 1 Washer 2 M5 screw b Secure the server to the front of the rack Fasten the two thumbscrews located on the front of the server Rack front Figure 78 Securing the server to the front of the rack 132 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 141: ...eral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 If you intend to install memory modules in the server you must first remove the air baffle from the ser...

Страница 142: ...ntion For proper cooling and airflow reinstall the air baffle before you turn on the server Operating the server with the air baffle removed might damage server components Figure 80 Removing the air baffle Step 4 Remove the M 2 backplane from the air baffle See Remove the M 2 backplane on page 166 134 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 143: ...irflow reinstall the air baffle before you turn on the server Operating the server with the air baffle removed might damage server components Procedure Note Close the retaining clip on each end of the memory module connector before installing the air baffle for proper cooling Figure 81 Installing air baffle Step 1 Align the air baffle tabs with the air baffle slots on both sides of the chassis the...

Страница 144: ... by the manufacturer distributor or representative to be recycled or disposed of in a proper manner After you replace the battery you must reconfigure the server and reset the system date and time S004 CAUTION When replacing the lithium battery use only Lenovo specified part number or an equivalent type battery recommended by the manufacturer If your system has a module containing a lithium batter...

Страница 145: ...https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove the PCIe riser 1 See Remove a PCIe riser on page 183 Step 2 Locate the CMOS battery CR2032 on the system board See System board connectors on page 34 Step 3 Pivot the CM...

Страница 146: ...st reconfigure the server and reset the system date and time Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Note Follow any special handling and installation instructions that come with the replacement battery Step 1 Follow...

Страница 147: ...ow instructions in this section to remove or install the external LCD diagnostics handset Remove the external LCD diagnostics handset Follow instructions in this section to remove the external LCD diagnostics handset About this task To avoid possible danger read and follow the following safety statement S014 CAUTION Hazardous voltage current and energy levels might be present Only a qualified serv...

Страница 148: ...e Power off the server on page 14 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Disconnect the external LCD diagnostics handset cable a Press and hold on the latch on the side of the connector b Pull to disconnect t...

Страница 149: ...iagnostics handset Follow instructions in this section to install the external LCD diagnostics handset About this task To avoid possible danger read and follow the following safety statement S014 CAUTION Hazardous voltage current and energy levels might be present Only a qualified service technician is authorized to remove the covers where the label is attached S017 CAUTION Hazardous moving fan bl...

Страница 150: ...tive surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Align the connector on the cable with that on the server and push it in Note Depending on your configuration the server and the location of the connector mi...

Страница 151: ...klist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Watch the procedure A v...

Страница 152: ...nal device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Install the fan cage Follow instructions in this section to install the fan cage About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Watch the procedure A video of the installation and removal pr...

Страница 153: ... section to remove a fan About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access t...

Страница 154: ...o you Install a fan Follow instructions in this section to install a fan About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Make sure to replace a defective fan with another unit of the exact same type Do not mix single rotor fan and dual rotor fan in the same unit of server Touch the static protective packa...

Страница 155: ...gure 90 Installing a fan After you finish Complete the parts replacement See Complete the parts replacement on page 328 Flash power module replacement Follow instructions in this section to remove or install the flash power module Remove the flash power module Follow instructions in this section to remove the flash power module About this task Attention Read Installation Guidelines on page 121 and...

Страница 156: ... power module a Open the retention latch on the PCIe riser b Unfasten the screw that secures the flash power module holder bracket to the PCIe riser c Remove the holder bracket from the PCIe riser d Press and release the retaining latch e Remove the flash power module from the holder Figure 91 Removing the flash power module After you finish 1 Install a replacement unit See Install the flash power...

Страница 157: ...o ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku co...

Страница 158: ... the front I O module Remove the front I O module Follow instructions in this section to remove the front I O module About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the...

Страница 159: ... front I O module on page 151 2 If you are instructed to return the component or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Install the front I O module Follow instructions in this section to install the front I O module About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on ...

Страница 160: ...is covered with a slot bracket remove the bracket from the chassis first a Insert the front I O module into the front I O module slot Ensure that the module is fully seated b Fasten the front I O module retention screw Figure 95 Installing the front I O module Step 3 Connect the front USB video and external LCD diagnostics handset cables from the front I O module to their respective connectors on ...

Страница 161: ...cable System board 1 Front VGA connector 2 External LCD diagnostics handset cables 2 LCD connector 3 USB cable 3 Front USB connector Figure 96 4 DW GPU Model front I O module cable routing Chapter 4 Hardware replacement procedures 153 ...

Страница 162: ...Figure 97 8 DW GPU Model front I O module cable routing 154 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 163: ...tall the front panel Remove the front panel Follow instructions in this section to remove the front panel About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 Chapter 4 Hardwar...

Страница 164: ...st PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 Step 2 Disconnect the front panel cable from the system board as illustrated Figure 99 Disconnecting the front panel cable Step 3 Remove the front panel a Press and hold on the two release tabs on the top of the...

Страница 165: ...e package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Locate the...

Страница 166: ...ure 101 Installing the front panel Step 3 Reconnect the front panel cable to system board as illustrated See System board connectors on page 34 for more details 158 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 167: ...install a heat sink Torx T30 nut Remove a heat sink Torx T30 nut This task has instructions for removing a PEEK Polyether ether ketone Torx T30 nut on the heat sink About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external c...

Страница 168: ...L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove the air baffle See Remove the air baffle on page 133 c Remove the PHM See Remove a processor and heat sink on page 200 Step 2 Remove the Torx T30 nut Figure 103 Removing a Torx T30 nut from the heat sink Note Do not touch ...

Страница 169: ... grounding system Do not touch the processor contacts Contaminants on the processor contacts such as oil from your skin can cause connection failures Note The heat sink processor and processor carrier for your system might be different from those shown in the illustrations Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list P...

Страница 170: ... server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Watch the procedure A video of the installation and removal process is available YouT...

Страница 171: ...ttention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube h...

Страница 172: ... fully seated in the bracket b Route the intrusion switch cable through the three cable clips on the outside of the PSU bays c Connect the intrusion switch cable to the system board See System board connectors on page 34 for intrusion switch connector location on system board 164 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 173: ... Intrusion switch connector After you finish 1 Reinstall the PCIe riser 2 if needed See Install a PCIe riser on page 189 2 Complete the parts replacement See Complete the parts replacement on page 328 Chapter 4 Hardware replacement procedures 165 ...

Страница 174: ...id state drives are to be removed it is recommended to disable them beforehand via the operating system Before you remove or make changes to drives drive controllers including controllers that are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Before you remove any component of a RAID array drive RAID card etc back up all RAID co...

Страница 175: ...ase the M 2 backplane retention latch on the air baffle c Slide and lift the M 2 backplane out of the air baffle Figure 108 Removing the M 2 backplane Step 4 Optional Remove the M 2 backplane cables from the M 2 backplane a Unfasten the screw on the signal cable b Remove the M 2 cables from the M 2 backplane Chapter 4 Hardware replacement procedures 167 ...

Страница 176: ...er from the rack See Remove the server from rack on page 124 If one or more NVMe solid state drives are to be removed it is recommended to disable them beforehand via the operating system Before you remove or make changes to drives drive controllers including controllers that are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Bef...

Страница 177: ...static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure S...

Страница 178: ... safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59...

Страница 179: ...kplane with the guide pins on the air baffle then lower the M 2 backplane and insert it into the air baffle c Fasten the screw that secures the M 2 backplane to the air baffle Figure 113 Installing M 2 backplane to the air baffle Step 4 Connect M 2 cables to the M 2 power connector and signal connector on system board See System board connectors on page 34 for more details Chapter 4 Hardware repla...

Страница 180: ...gnal connector 2 M 2 power connector After you finish Complete the parts replacement See Complete the parts replacement on page 328 Memory module replacement Use the following procedures to remove and install a memory module 172 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 181: ...r housing Handle memory modules with care never bend twist or drop a memory module Do not use any metal tools such as jigs or clamps to handle the memory modules because the rigid metals may damage the memory modules Do not insert memory modules while holding packages or passive components which can cause package cracks or detachment of passive components by the high insertion force After you inst...

Страница 182: ...Figure 115 Removing the cable guide from chassis 174 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 183: ...ss on the top of the retaining clip then carefully rotate the retaining clip away from the memory module slot Make sure you use firm and solid pointed tool to open the latch Do not use pencils or other fragile tools Figure 116 Memory module removal After you finish 1 A memory module slot must be installed with a memory module or a memory module filler See Install a memory module on page 175 2 Chan...

Страница 184: ...e components which can cause package cracks or detachment of passive components by the high insertion force Important Remove or install memory modules for one processor at a time Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedu...

Страница 185: ...3 Touch the static protective package that contains the memory module to any unpainted surface on the outside of the server Then take the memory module out of the package and place it on a static protective surface Step 4 Locate the required memory module slot on the system board Note Remove or install memory modules for one processor at a time Ensure that you observe the installation rules and se...

Страница 186: ...ing clips snap into the locked position Attention To avoid breaking the retaining clips or damaging the memory module slots open and close the clips gently If there is a gap between the memory module and the retaining clips the memory module has not been correctly inserted In this case open the retaining clips remove the memory module and then reinsert it Figure 118 Memory module installation Step...

Страница 187: ...this section to remove a network adapter from the front I O expansion board or the front I O expansion board module About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the ...

Страница 188: ...k adapter Follow instructions in this section to install a network adapter to the front I O expansion board or the front I O expansion board module About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server t...

Страница 189: ...network adapter After you finish Complete the parts replacement See Complete the parts replacement on page 328 OCP Ethernet adapter replacement Follow instructions in this section to remove or install the OCP Ethernet adapter Remove the OCP Ethernet adapter Follow instructions in this section to remove the OCP Ethernet adapter About this task Attention Read Installation Guidelines on page 121 and ...

Страница 190: ... handle and slide the adapter out Figure 122 Removing the OCP Ethernet adapter After you finish 1 Install a replacement unit or a filler See Install the OCP Ethernet adapter on page 182 2 If you are instructed to return the component or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Install the OCP Ethernet adapter Follow ins...

Страница 191: ...dapter After you finish 1 Connect the required cables 2 Complete the parts replacement See Complete the parts replacement on page 328 PCIe riser and PCIe adapter replacement Follow instructions in this section to remove and install the PCIe riser and PCIe adapter installed on it Remove a PCIe riser Follow instructions in this section to remove a PCIe riser About this task Attention Read Installati...

Страница 192: ...al port installation See corresponding instructions below for proper removal procedure Figure 124 PCIe riser locations 1 Removing PCIe riser 1 or PCIe riser 2 without serial port module installed See Remove a PCIe riser without serial port on page 184 2 Removing PCIe riser 1 installed with serial port module See Remove PCIe riser 1 installed with serial port on page 185 3 Removing PCIer riser 2 in...

Страница 193: ...are connected to the PCIe riser and the PCIe adapter Step 2 If PCIe riser 2 is installed remove it from chassis See Remove a PCIe riser without serial port on page 184 Step 3 Remove the PCIe riser 1 installed with serial port a Disconnect serial port cable from system board b Unfasten the thumbscrew on the PCIe riser c Lift the PCIe riser out of the chassis Chapter 4 Hardware replacement procedure...

Страница 194: ...r See Remove the top cover on page 225 b Disconnect cables that are connected to the PCIe riser and the PCIe adapter Step 2 Remove the PCIe riser a Unfasten the thumbscrew on the PCIe riser b Slightly lift up the PCIe riser and disconnect the serial port cable from the system board c Lift the PCIe riser out of the chassis 186 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 195: ...ction to remove a PCIe adapter from the rear PCIe riser About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its ra...

Страница 196: ... you Install a PCIe adapter Follow instructions in this section to install a PCIe adapter About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static pr...

Страница 197: ...ctive package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Note To maintain proper system cooling do not operate the server without a PCIe riser or a rise filler installed in the chassis Watch the procedure A video of the installation and removal process is available YouTube https www youtube co...

Страница 198: ...tall PCIe riser 2 installed with serial port on page 191 Install a PCIe riser without serial port Procedure Step 1 Install the PCIe riser a Align the guide hole on the PCIe riser to the guide post on system board and insert the PCIe riser into the PCIe slots on system board b Fasten the thumbscrew to secure the PCIe riser Figure 131 Installing a PCIe riser without serial port Install PCIe riser 1 ...

Страница 199: ... on system board Figure 132 Installing PCIe riser 1 installed with serial port Install PCIe riser 2 installed with serial port Procedure Step 1 1 Install the PCIe riser Attention Make sure the serial port cable is routed through the cable clip inside the PCIe riser a Connect serial port cable to serial port connector on system board b Align the guide hole on the PCIe riser to the guide post on sys...

Страница 200: ...Follow instructions in this section to remove a PCIe riser board from the rear PCIe riser About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a r...

Страница 201: ... See Remove a PCIe riser on page 183 c Remove the PCIe adapter or serial port cable See Remove a PCIe adapter on page 187 or Remove the serial port module on page 212 Step 2 Unfasten the four screws to remove the PCIe riser board from the PCIe riser cage Figure 134 Removing the riser board After you finish If you are instructed to return the component or optional device follow all packaging instru...

Страница 202: ... Step 1 Fasten the four screws to secure the PCIe riser board to the PCIe riser cage Figure 135 Installing the riser board After you finish 1 Reinstall the PCIe adapter or serial port module See Install a PCIe adapter on page 188 or Install the serial port module on page 213 2 Reinstall the PCIe riser See Install a PCIe riser on page 189 3 Reconnect the required cables 4 Complete the parts replace...

Страница 203: ...aylist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove all of the power supply units See Remove a power supply unit on page 197 c SXM GPU Model only Disconnect the sideband cable between the power distribution board and the SXM GPU power distributi...

Страница 204: ...ely Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Install the power distribution board into the server a Align the connector on the power distribution board with that on the system board with the two power supply co...

Страница 205: ...peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Make sure you have a power supply unit filler available if some PSU bays will be left empty after...

Страница 206: ...fety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Notes 4 DW GPU Model and 8 DW GPU Model server should be installed with two power supply units in bay 1 and bay 2 or four power supply units in al...

Страница 207: ...the bay then slide the power supply unit into the bay until the release tab locks into place Step 3 Connect the power supply unit to a properly grounded electrical socket with a power cord Step 4 Make sure that the ac power LED on the power supply unit is lit indicating that the power supply unit is operating correctly Important During normal operation each power supply bay must contain either a p...

Страница 208: ...evices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Prevent exposure to static electricity which might lead to system halt and loss of data by keeping static sen...

Страница 209: ...Figure 141 Location of memory modules and processor sockets The following illustration shows the components of the PHM Chapter 4 Hardware replacement procedures 201 ...

Страница 210: ... Clips to secure carrier to heat sink Note The heat sink processor and processor carrier for your system might be different from those shown in the illustrations Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare...

Страница 211: ... the processor socket clean from any object to prevent possible damages Figure 143 PHM removal After you finish Empty processor socket must always contain a socket cover and a filler before the server is powered on If you are removing the PHM as part of a system board replacement set the PHM aside If you are reusing the processor or heat sink separate the processor from its carrier See Separate th...

Страница 212: ...ring it ineffective Thermal grease can damage components such as the electrical connectors in the processor socket Important Make sure you have the alcohol cleaning pad part number 00MP352 available Note The heat sink processor and processor carrier for your system might be different from those shown in the illustrations Watch the procedure A video of the installation and removal process is availa...

Страница 213: ...ottom of the heat sink with an alcohol cleaning pad Note The processor carrier will be discarded and replaced with a new one Make note of the color of the discarded carrier since replacement carrier needs to be of the same color Figure 145 Separating a processor carrier from the heat sink After you finish Install a replacement processor or heat sink See Install a processor and heat sink on page 20...

Страница 214: ...tatic discharge wrist strap or other grounding system Each processor socket must always contain a cover or a PHM When removing or installing a PHM protect empty processor sockets with a cover Do not touch the processor socket or processor contacts Processor socket contacts are very fragile and easily damaged Contaminants on the processor contacts such as oil from your skin can cause connection fai...

Страница 215: ...Figure 146 Location of memory modules and processor sockets The following illustration shows the components of the PHM Chapter 4 Hardware replacement procedures 207 ...

Страница 216: ...strations PHMs are keyed for the socket where they can be installed and for their orientation in the socket See https static lenovo com us en serverproven index shtml for a list of processors supported for your server All processors on the system board must have the same speed number of cores and frequency Before you install a new PHM or replacement processor update your system firmware to the lat...

Страница 217: ...r write the processor serial number from the processor identification label on the new heat sink in the same location as the label would be placed using a permanent marker b Install processor in new carrier Note Replacement heat sinks come with both gray and black processor carriers Make sure to use the carrier with the same color as the one you discarded earlier 1 Make sure the handle on the carr...

Страница 218: ...ng pad Note Make sure the alcohol has fully evaporated before applying new thermal grease c Apply the thermal grease on the top of the processor with syringe by forming four uniformly spaced dots while each dot consists of about 0 1 ml of thermal grease Figure 149 Thermal grease application with processor in shipping tray Step 5 Assemble the processor and heat sink a Align the triangular mark on t...

Страница 219: ...ssor socket c Rotate the anti tilt wire bails outward until they engage with the hooks in the socket d Fully tighten the Torx T30 nuts in the installation sequence shown on the heat sink label Tighten the screws until they stop then visually inspect to make sure that there is no gap between the screw shoulder beneath the heat sink and the processor socket Note For reference the torque required for...

Страница 220: ... Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See ...

Страница 221: ...ial port module After you finish Install a replacement unit See Install the serial port module on page 213 If you are instructed to return the component or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Install the serial port module Follow instructions in this section to install the serial port module About this task Attenti...

Страница 222: ...e 153 Installing the serial port module After you finish 1 Connect the serial port cable to the serial port cable connector on the system board See System board connectors on page 34 for more details 2 Reinstall the PCIe riser See Install a PCIe riser on page 189 3 Complete the parts replacement See Complete the parts replacement on page 328 System board replacement trained technician only Follow ...

Страница 223: ... connectors the cable is connected to and use the record as a cabling checklist after installing the new system board Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is inst...

Страница 224: ...the PCIe riser See Remove a PCIe riser on page 183 h If applicable remove the OCP Ethernet adapter See Remove the OCP Ethernet adapter on page 181 i Remove the power supply units See Remove a power supply unit on page 197 j SXM GPU Model only Remove the SXM GPU power distribution board See Remove the SXM GPU power distribution board on page 312 k Remove the power distribution board See Remove the ...

Страница 225: ... Lifting handles 2 Guide pin 3 Guide slot Step 5 Remove the system board a Tilt the system board so that its rear end is up b Hold both lifting handles and lift the system board out of the chassis Chapter 4 Hardware replacement procedures 217 ...

Страница 226: ...cket cover is securely attached 3 Make sure that the socket cover is securely attached to the CPU socket assembly If you plan to recycle the component see Disassemble the system board for recycle on page 363 Install the system board Follow instructions in this section to install the system board About this task Important Removing and installing this component requires trained technicians Do not at...

Страница 227: ...o that its rear end is up b Align the guide slot on system board with the guide pin on chassis then lower the system board into the chassis 1 Lifting handle Step 2 Grasp the lifting handles and slide the system board toward the rear of the chassis Make sure that 1 The guide pin is at the front end of the guide slot 2 The rear connectors on the new system board are inserted into the corresponding h...

Страница 228: ...mory module to the same slot on the new system board as on the defective system board until all the memory modules are installed See Install a memory module on page 175 h Install the PHMs See Install a processor and heat sink on page 206 i Install the air baffle See Install the air baffle on page 135 2 Reconnect all the required cables to the same connectors on the system board as the defective sy...

Страница 229: ...erial number in the Lenovo XClarity Controller Select one of the following methods to access the Lenovo XClarity Controller and set the machine type and serial number Operate from the target system such as LAN or keyboard console style KCS access Remote access to the target system TCP IP based To update the machine type and serial number from Lenovo XClarity Essentials OneCLI 1 Download and instal...

Страница 230: ...password xcc_external_ip Where xcc_external_ip The BMC IMM XCC IP address There is no default value This parameter is required xcc_user_id The BMC IMM XCC account 1 of 12 accounts The default value is USERID xcc_password The BMC IMM XCC account password 1 of 12 accounts Note BMC IMM or XCC internal LAN USB IP address account name and password are all valid for this command Example commands are as ...

Страница 231: ...ls OneCLI Note Please note that a Local IPMI user and password must be setup in Lenovo XClarity Controller for remote accessing to the target system To set the TPM policy from Lenovo XClarity Essentials OneCLI 1 Read TpmTcmPolicyLock to check whether the TPM_TCM_POLICY has been locked OneCli exe config show imm TpmTcmPolicyLock override imm userid password ip_address Note The imm TpmTcmPolicyLock ...

Страница 232: ...mNorTcm TpmOnly and NationZTPM20Only If the imm TpmTcmPolicy is set as Enabled but imm TpmTcmPolicy value is invalid UEFI will reject the lock request and change imm TpmTcmPolicy back to Disabled 8 Read back the value to check whether the Lock is accepted or rejected command as below OneCli exe config show imm TpmTcmPolicy override imm userid password ip_address Note If the read back value is chan...

Страница 233: ...com help topic toolsctr_cli_lenovo onecli_r_set_command html Top cover replacement Follow instructions in this section to remove and install the top cover Remove the top cover Follow instructions in this section to remove the top cover S014 CAUTION Hazardous voltage current and energy levels might be present Only a qualified service technician is authorized to remove the covers where the label is ...

Страница 234: ...h is fully open and the top cover is disengaged from the chassis c Lift up the top cover from the chassis and place it on a flat clean surface Attention Service label is located on the inside of the top cover For proper cooling and air flow install the top cover before you power on the server Operating the server with the top cover removed might damage server components Figure 157 Removing top cov...

Страница 235: ... YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Install the top cover a Align the top cover guide holes with the guide pins on chassis then place the top cover on top of the server b Press down the top cover latch to lock the top cover in place Figure 158 Installing top cover After you finish Com...

Страница 236: ...drive backplanes or drive cables back up all important data that is stored on drives Before you remove any component of a RAID array drive RAID card etc back up all RAID configuration information Note Make sure you have the drive bay fillers available if some drive bays will be left empty after the removal Watch the procedure A video of the installation and removal process is available YouTube htt...

Страница 237: ... of the drive bay Note Install a drive bay filler or replacement drive as soon as possible See Install a 2 5 3 5 inch hot swap drive on page 230 Figure 160 Removing a 3 5 inch hot swap drive After you finish If you are instructed to return the component or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Chapter 4 Hardware repl...

Страница 238: ...t is stored on drives Before you remove any component of a RAID array drive RAID card etc back up all RAID configuration information The following notes describe the type of drives that the server supports and other information that you must consider when you install a drive For a list of supported drives see https static lenovo com us en serverproven index shtml Locate the documentation that come...

Страница 239: ... a drive bay filler is installed in the drive bay pull the release lever on the filler and slide it out of the server a Make sure that the drive handle is in the open position Then align the drive with the guide rails in the bay and gently push the drive into the bay until the drive stops b Rotate the drive handle to the fully closed position until the handle latch clicks Figure 163 Installing a 2...

Страница 240: ...sed 2 If the server is configured for RAID operation through a ThinkSystem RAID adapter you might have to reconfigure your disk arrays after you install drives See the ThinkSystem RAID adapter documentation for additional information about RAID operation and complete instructions for using ThinkSystem RAID adapter 2 5 3 5 inch drive backplane replacement Follow instructions in this section to remo...

Страница 241: ... the power and signal cables from the 2 5 inch or 3 5 inch drive backplane d Remove the 2 5 inch or 3 5 inch drive cage assembly See Remove the 2 5 3 5 inch drive cage assembly on page 236 Step 2 Based on your configuration follow the corresponding procedures to remove the 2 5 inch or 3 5 inch drive backplane Remove the 2 5 inch drive backplane a Lift and hold the retention latches on top of the 2...

Страница 242: ...es on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list ...

Страница 243: ...ch drive backplane a Align the four tabs on the drive cage with the slots on the 3 5 inch drive backplane then insert the tabs into the corresponding slots b Slide the backplane toward the left as illustrated until it is seated in the drive cage Figure 168 Installing the 3 5 inch drive backplane After you finish 1 Reinstall the 2 5 inch or 3 5 inch drive cage assembly See Install the 2 5 3 5 inch ...

Страница 244: ...ck slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare yo...

Страница 245: ... or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Install the 2 5 3 5 inch drive cage assembly Follow instructions in this section to install the 2 5 inch or 3 5 inch drive cage assembly About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safe...

Страница 246: ...rive cage assembly with the opening on the front of the server then slide it into the chassis until it is seated in place b Fasten the two thumbscrews to secure the drive cage assembly to the chassis Figure 171 Installing the 2 5 inch drive cage assembly Install the 3 5 inch drive cage assembly a Align the 3 5 inch drive cage assembly with the opening on the front of the server then slide it into ...

Страница 247: ...inutes without either a drive or a filler installed in each bay If one or more EDSFF drives are to be removed it is recommended to disable them beforehand via the operating system Before you remove or make changes to drives drive controllers including controllers that are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Before you ...

Страница 248: ...andle to the open position c Grasp the handle and slide the drive out of the drive bay Figure 174 Removing an EDSFF hot swap drive Step 3 Install a drive bay filler or replacement drive as soon as possible See Install an EDSFF hot swap drive on page 241 Step 4 Reinstall the EDSFF drive cage cover back to the server 240 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 249: ...move a drive To make sure that there is adequate system cooling do not operate the server for more than two minutes without either a drive or a drive bay filler installed in each bay Before you make changes to drives drive controllers including controllers that are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Before you remove ...

Страница 250: ... is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Hold the handle of the EDSFF drive cage cover and pull it out of the server Figure 177 Removing the EDSFF drive cage cover Step 2 If a drive bay filler is installed in the drive bay pull the release lever on the filler and slide it out ...

Страница 251: ...d If the green drive activity LED is flashing the drive is functioning Step 6 Reinstall the EDSFF drive cage cover back to the server Figure 179 Reinstalling the EDSFF drive cage cover After you finish If the server is configured for RAID operation through a ThinkSystem RAID adapter you might have to reconfigure your disk arrays after you install drives See the ThinkSystem RAID adapter documentati...

Страница 252: ...e the server from rack on page 124 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove all EDSFF hot swap drives and drive bay fille...

Страница 253: ... it from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Fasten the two screws to secure the drive backplane to the drive cage Figure 181 Installing the EDSFF dr...

Страница 254: ...ended to disable them beforehand via the operating system Before you remove or make changes to drives drive controllers including controllers that are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Before you remove any component of a RAID array drive RAID card etc back up all RAID configuration information Watch the procedure A ...

Страница 255: ...e cage assembly About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the drive to any unpainted metal surface on the solution then remove the drive from the package and place it on a static protective surface Watch the procedure A video of the installation and ...

Страница 256: ...t swap drive on page 241 3 Complete the parts replacement See Complete the parts replacement on page 328 Front I O expansion board replacement Follow instructions in this section to remove and install the front I O expansion board Remove the front I O expansion board Follow instructions in this section to remove the front I O expansion board About this task Attention Read Installation Guidelines o...

Страница 257: ...top cover on page 225 b If a network adapter is installed on the front I O expansion board remove it See Remove a network adapter on page 179 Step 2 Disconnect cables that are connected to the front I O expansion board Step 3 Unfasten the five screws from the front I O expansion board and remove it from the chassis Figure 184 Removing the front I O expansion board After you finish Install a replac...

Страница 258: ...e five screw holes on the rear of the system board then lower the front I O expansion board into the chassis Step 2 Fasten the five screws to secure it to the chassis Figure 185 Installing the front I O expansion board After you finish 1 Reconnect the required cables 2 Reinstall the network adapter to the front I O expansion board See Install a network adapter on page 180 3 Complete the parts repl...

Страница 259: ... from the illustrations in this section Follow the additional instructions in any documentation that comes with your GPU adapter Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cov...

Страница 260: ... chassis smoothly After you finish 1 Install a replacement unit or a slot bracket See Install a GPU adapter on page 253 2 If you are instructed to return the component or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you 3 If the GPU adapter link bridge was removed reinstall the link connector cover back to the GPU If you do not...

Страница 261: ... that comes with your GPU adapter Important The DisplayPort ports on the Nvidia A40 GPU are not supported when used in the ThinkSystem SR670 V2 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Locate the PCIe slot base...

Страница 262: ...nk connector cover from the GPU Step 3 Install the GPU adapter Note If the PCIe slot is covered with a slot bracket remove the bracket from the chassis first Figure 189 Installing a GPU adapter a Align the GPU adapter with the PCIe slot on the chassis Then carefully press both ends of the GPU adapter straight into the slot until it is securely seated 254 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 263: ...ower connector mapping table Item Numbering GPU adapter PCIe slot 1 Slot 3 2 Slot 4 3 Slot 5 4 Slot 6 5 Slot 7 6 Slot 8 7 Slot 9 8 Slot 10 System board GPU power connector 1 2 3 4 5 6 7 8 After you finish To install the GPU adapter link bridge see Install a GPU adapter link bridge on page 262 Complete the parts replacement See Complete the parts replacement on page 328 GPU distribution board repla...

Страница 264: ...A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove all of the GPU adapters See Remove a GPU adapter on page 250 Step 2 Disconnect the power and signal ...

Страница 265: ...Note The illustration shows the Four PCIe x16 slot PCIe distribution board Figure 190 Removing a GPU distribution board 4 DW GPU Model Chapter 4 Hardware replacement procedures 257 ...

Страница 266: ...Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Based on your configuration the following GPU distribution boards are supported in the 4 DW GPU Model and the 8 DW GP...

Страница 267: ...36529 Procedure Step 1 Install the GPU distribution board a Align the nine screw holes on the GPU distribution board with the standoffs on the chassis b Fasten the nine screws to secure the GPU distribution board to the chassis Note The illustration shows the Four PCIe x16 slot PCIe distribution board Figure 192 Installing a GPU distribution board 4 DW GPU Model Chapter 4 Hardware replacement proc...

Страница 268: ... GPU adapter link bridge Follow instructions in this section to remove a GPU adapter link bridge About this task Important Make sure you have a suction cup available for properly removing the GPU adapter link bridge Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect...

Страница 269: ...cedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 Step 2 Remove the GPU adapter link bridge from the GPUs with a suction cup a Press the suction cup against the GPU adapter link bridge until it adheres to the GPU adapter link bridge b Pull up the suction cup and remove the GPU adapter link bridge together with the suction cup from the GPUs Note Depending...

Страница 270: ...remove it from the package and place it on a static protective surface Depending on the specific type your GPU adapter might look slightly different from the illustrations in this section Follow the additional instructions in any documentation that comes with your GPU adapter Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist lis...

Страница 271: ...ks into place Note Depending on the configuration there may be one or three GPU adapter link bridges on the GPU When linking a GPU pair all link connectors on the GPUs must be linked Figure 196 Installing the GPU adapter link bridge After you finish Complete the parts replacement See Complete the parts replacement on page 328 SXM GPU Model components Use information in this section to remove and i...

Страница 272: ...at are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Before you remove any component of a RAID array drive RAID card etc back up all RAID configuration information Note Make sure you have the drive bay fillers available if some drive bays will be left empty after the removal Watch the procedure A video of the installation and re...

Страница 273: ... install or remove a drive To make sure that there is adequate system cooling do not operate the server for more than two minutes without either a drive or a drive bay filler installed in each bay Before you make changes to drives drive controllers including controllers that are integrated on the system board drive backplanes or drive cables back up all important data that is stored on drives Befo...

Страница 274: ... https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 If a drive bay filler is installed in the drive bay pull the release lever on the filler and slide it out of the server Step 2 Install a 2 5 inch drive a Make sure that the drive handle is in the open position Then align the drive with the guide rails in th...

Страница 275: ...t you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Watch the procedure A video of the installation and re...

Страница 276: ...embly Step 4 Remove the 2 5 inch drive cage assembly a Tilt the assembly so that its rear end is up b Lift the assembly out of the chassis Figure 201 Removing the 2 5 inch drive cage assembly After you finish 268 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 277: ...al surface on the server then remove the drive from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Make sure the 2 5 inch drive backplane module is installed on...

Страница 278: ...5 Complete the parts replacement See Complete the parts replacement on page 328 2 5 inch drive backplane module replacement Follow instructions in this section to remove and install the 2 5 inch drive backplane module Remove the 2 5 inch drive backplane module Follow instructions in this section to remove the 2 5 inch drive backplane module About this task Attention Read Installation Guidelines on...

Страница 279: ...s from 2 5 inch drive backplane Step 3 Remove the 2 5 inch drive backplane module a Unfasten the thumbscrew on the drive backplane module b Lift the drive backplane module out of the chassis Figure 204 Removing the 2 5 inch drive backplane module After you finish Install a replacement unit See Install the 2 5 inch drive backplane module on page 271 If you are instructed to return the component or ...

Страница 280: ...st show id_59636529 Procedure Step 1 Installing the 2 5 inch drive backplane module a Align the guide holes on the drive backplane module with the guide pins on the 2 5 inch drive assembly then place the drive backplane module onto the assembly b Fasten the thumbscrew to secure the drive backplane module to the assembly Figure 205 Installing the 2 5 inch drive backplane module After you finish 1 R...

Страница 281: ...ck See Remove the server from rack on page 124 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove all 2 5 inch and drive bay filler...

Страница 282: ...atch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Position the 2 5 inch drive backplane and the backplane module as illustrated below Align the square shape guide slot on the drive backplane to the square shape guide pin...

Страница 283: ...ion to remove the front I O expansion board module About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack sl...

Страница 284: ...le from chassis a Press the release latch on the cross bar b Slide the front I O expansion board module toward the rear of the chassis to disengage the module from guide pins Figure 209 Disengaging the front I O expansion board module Step 4 Removing the front I O expansion board module a Lift up the front end of the front I O expansion board module to tilt the module b Remove the module from the ...

Страница 285: ...checklist on page 122 to ensure that you work safely Touch the static protective package that contains the drive to any unpainted metal surface on the server then remove the drive from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx...

Страница 286: ...I O expansion board module toward the front of the chassis until the guide pins on system board are fully seated in the guide holes on the module Figure 212 Installing the front I O expansion board module After you finish 1 Reconnect the required cables 278 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 287: ...bles See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku ...

Страница 288: ...ge 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the drive to any unpainted metal surface on the server then remove the drive from the package and place it on a static protective surface Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5...

Страница 289: ...he Lenovo NeptuneTM liquid to air L2A hybrid cooling module Important This task must be operated by trained technicians Remove the Lenovo Neptune TM liquid to air L2A hybrid cooling module Follow instructions in this section to remove the Lenovo NeptuneTM liquid to air L2A hybrid cooling module About this task Important Removing and installing this component requires trained technicians Do not att...

Страница 290: ...iator fins might damage the L2A Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove the 2 5 inch drive assembly See Remove the 2 5 i...

Страница 291: ...ssembly Figure 215 Routing the pump cables through the cable clips Step 4 Disconnect the SXM GPU board power cable from the SXM GPU board and the SXM GPU power distribution board Figure 216 Disconnecting the SXM GPU board power cable 1 Cable guide Chapter 4 Hardware replacement procedures 283 ...

Страница 292: ...e clips and handle on the SXM GPU board b Hold the handles on both sides of the SXM GPU board and lift the GPU L2A assembly out of the chassis Figure 217 Removing the GPU L2A assembly 1 SXM GPU board handle 284 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 293: ...ay Remove the screws with a torque screwdriver set to the proper torque For reference the torque required for the screws to fully tighten is 0 3 0 03 newton meter 2 7 0 27 pound inch Figure 218 Unfastening the screws on the radiator 1 Radiator 2 Cold plate assembly Chapter 4 Hardware replacement procedures 285 ...

Страница 294: ...h a torque screwdriver set to the proper torque For reference the torque required for the screws to fully tighten is 0 4 0 06 newton meter 3 5 0 5 pound inch Attention To prevent damage to components make sure to follow the indicated screw unfastening sequence shown on the cold plate label Figure 219 Unfastening the screws on the cold plates 286 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 295: ... up from the SXM GPU board Note A flat tool may be needed to carefully disengage the cold plates from the GPUs Make sure not to damage the GPUs while disengaging the cold plates Figure 220 Disengaging the cold plates from the SXM GPU board Figure 221 Removing the L2A Chapter 4 Hardware replacement procedures 287 ...

Страница 296: ...the L2A upside down a Keep the left end of the radiator standing on the flat surface and hold the cold plate assembly lifting handle b Move your hand to hold the bottom edge of the radiator then turn the L2A upside down so that the upper side of the radiator and cold plate assembly lifting handle are facing down Figure 223 Turning the L2A upside down Step 11 Place the L2A on a clean flat surface S...

Страница 297: ...tall it without proper training Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely CAUTION When removing a new L2A from the shipping box lift out the cold plate assembly with the plastic tray attached to prevent thermal grease on the cold plate assembly from damages Only remove the masking tape from the plastic tray and col...

Страница 298: ... radiator by its upper edge and hold the cold plate assembly by its lifting handle to remove the L2A out of the shipping box Attention To avoid damaging the thermal grease on the cold plate assembly make sure the plastic tray is secured to the cold plate assembly with masking tapes when removing the L2A out of the shipping box Step 3 Remove the masking tapes from the plastic tray and the cold plat...

Страница 299: ...the upper left corner of the GPU tray and the screw holes on the SXM GPU board then gently place the L2A down onto the SXM GPU board Figure 224 Placing the L2A onto the SXM GPU board Chapter 4 Hardware replacement procedures 291 ...

Страница 300: ...tray Install the screws with a torque screwdriver set to the proper torque For reference the torque required for the screws to fully tighten is 0 3 0 03 newton meter 2 7 0 27 pound inch Figure 225 Fastening screws to the radiator 1 Radiator 2 Cold plate assembly 292 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 301: ...ure to follow the indicated screw fastening sequence shown on the cold plate label Figure 226 Fastening screws on the cold plates Step 8 Remove the retimer assembly from the chassis See Remove the retimer assembly on page 318 Step 9 Install the GPU L2A assembly a Pull the GPU L2A assembly latch outward until it stops b Rotate up the clips and handle of the SXM GPU board and hold the handles on bot...

Страница 302: ...Figure 227 Install the GPU L2A assembly 1 SXM GPU board handle 294 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 303: ...ide and connect it to the SXM GPU board and the SXM GPU power distribution board in the rear of the chassis Attention Make sure to route the cables through the cable clip and cable guide Figure 228 Connecting SXM GPU board power cable Chapter 4 Hardware replacement procedures 295 ...

Страница 304: ...See Install the 2 5 inch drive cage assembly on page 269 5 Complete the parts replacement See Complete the parts replacement on page 328 SXM GPU replacement trained technician only Follow instructions in this section to remove and install the SXM GPU Important This task must be operated by trained technicians Remove an SXM GPU Follow instructions in this section to remove a GPU About this task Imp...

Страница 305: ...gure 230 SXM GPU Numbering Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove the top cover on page 225 b Remove the 2 5 inch drive assembly See Remove the 2 5 inch d...

Страница 306: ...s 2 screws on the GPU and carefully remove the GPU out of the GPU board Attention Tighten and remove the screws with a torque screwdriver sets to the proper torque For reference the torque required for the screws to fully tighten removal is 0 5 0 05 newton meter 4 5 0 5 pound inch Figure 231 Removing a GPU from the SXM GPU board Step 4 Install protective covers to the SXM GPU board 298 ThinkSystem...

Страница 307: ...ning Note Make sure you have an alcohol cleaning pad available Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Prepare the following scre...

Страница 308: ...e Attention If there is any old thermal grease on the four GPUs and the cold plates gently clean the top of the four GPUs and the cold plates with an alcohol cleaning pad Step 1 Remove protective covers from the GPU if they are installed Figure 234 Removing the protective covers Step 2 Gently place the GPU down on the SXM GPU board then fasten the four Philips 2 screw to secure the GPU to the SXM ...

Страница 309: ...lled in GPU tray After you finish 1 Reinstall the SXM GPU board See Install the SXM GPU board on page 305 2 Reinstall the Lenovo NeptuneTM liquid to air L2A hybrid cooling module See Install the Lenovo Neptune TM liquid to air L2A hybrid cooling module on page 289 3 Reinstall the retimer assembly See Install the retimer assembly on page 322 4 Reinstall the front I O expansion board module See Inst...

Страница 310: ...ad available Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove th...

Страница 311: ...ove the retimer assembly See Remove the retimer assembly on page 318 f Remove the Lenovo NeptuneTM liquid to air L2A hybrid cooling module See Remove the Lenovo Neptune TM liquid to air L2A hybrid cooling module on page 281 Step 2 If there is any old thermal grease on the four GPUs and the cold plates gently clean the top of the four GPUs and the cold plates with an alcohol cleaning pad Step 3 Wit...

Страница 312: ...ew 18mm 2 Torx T10 screw captive screw Step 4 Remove the SXM GPU board from the GPU tray a Rotate up the clips and handle on the SXM GPU board b Hold the handles on both sides of the SXM GPU board and lift it up from the GPU tray 304 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 313: ...structions in this section to install the SXM GPU board About this task Important Removing and installing this component requires trained technicians Do not attempt to remove or install it without proper training Note Make sure you have an alcohol cleaning pad available Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Hol...

Страница 314: ...om the package box Once the SXM GPU board is removed from the plastic protective bag hold two handles with both hands to move the GPU board Figure 240 Removing SXM GPU board from the package box 306 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 315: ...ering Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Attention If there is any old thermal grease on the cold plates gently clean the top of the cold plates with an alcohol cleaning pad Step 1 Hold the SXM GPU board handles...

Страница 316: ...he two captive screws on the SXM GPU board handles Remove the screws with a torque screwdriver sets to the proper torque For reference the torque required for the screws to fully tighten removal is 0 6 0 06 newton meter 5 0 5 pound inch Attention Make sure to install the Phillips 2 screw 18mm to the designated screw hole See the following illustration for the screw hole location 308 ThinkSystem SR...

Страница 317: ...d thermal grease on the cold plates gently clean the top of the cold plates with an alcohol cleaning pad b If you have cleaned the top of the GPUs with an alcohol cleaning pad make sure to apply the new thermal grease after the alcohol has fully evaporated Apply new thermal grease 1 5 g to the top of each of the four GPUs Chapter 4 Hardware replacement procedures 309 ...

Страница 318: ...e holding the cold plate assembly lifting handle with your left hand Figure 245 Lifting up the cold plate b Rotate the L2A clockwise Hold the bottom edge of the radiator and hold the cold plate assembly lifting handle from underneath Rotate the L2A clockwise so that the left end of the radiator is standing on the flat surface and the cold plate assembly lifting handle is facing your left side Move...

Страница 319: ...lifting handle are facing up Attention To prevent cold plate assembly thermal grease from contacting the flat surface below lift up the cold plate assembly before installing it onto the SXM GPU board Figure 247 Turning the L2A upside up d Reinstall the L2A See Install the Lenovo Neptune TM liquid to air L2A hybrid cooling module on page 289 2 Reinstall the retimer assembly See Install the retimer ...

Страница 320: ...Power off the server and peripheral devices and disconnect the power cords and all external cables See Power off the server on page 14 If the server is installed in a rack slide the server out on its rack slide rails to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Note Prepare Phillips 1 head screwdriver for this task Watch the procedu...

Страница 321: ... distribution boards Figure 249 Disconnecting the sideband cable Step 4 Remove the SXM GPU power distribution board a Unfasten the four screws that secure the SXM GPU power distribution board to the PSU bays Chapter 4 Hardware replacement procedures 313 ...

Страница 322: ...er distribution board After you finish Install a replacement unit See Install the SXM GPU power distribution board on page 314 To replace the power distribution board see Power distribution board replacement on page 194 If you are instructed to return the component or optional device follow all packaging instructions and use any packaging materials for shipping that are supplied to you Install the...

Страница 323: ...the power distribution board is installed in the chassis See Install the power distribution board on page 196 Step 2 Install the SXM GPU power distribution board a Align the SXM GPU power distribution board with guide slots in the two standoffs on the power distribution board then place the SXM GPU power distribution board on the PSU cage b Fasten the four screws to secure the SXM GPU power distri...

Страница 324: ...Step 3 Connect the side band cable to SXM GPU power distribution board and power distribution board 316 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 325: ...ting sideband cable Step 4 Connect the SXM GPU board power cable to the SXM GPU power distribution board Figure 253 Connecting the SXM GPU board power cable After you finish Chapter 4 Hardware replacement procedures 317 ...

Страница 326: ...ls to gain access to the top cover or remove the server from the rack See Remove the server from rack on page 124 Watch the procedure A video of the installation and removal process is available YouTube https www youtube com playlist list PLYV5R7hVcs BXei6L6c05osQVLt4w5XYx Youku https list youku com albumlist show id_59636529 Procedure Step 1 Prepare your server a Remove the top cover See Remove t...

Страница 327: ...bly a Disconnect the four cold plate assembly pump cables from the retimer assembly b Pull the SXM GPU board latch outward until it stops to disconnect it from the retimer assembly Figure 255 Disengaging the SXM GPU board from the retimer assembly Chapter 4 Hardware replacement procedures 319 ...

Страница 328: ...ble clips b Disconnect the retimer power cable from the system board and remove it from the cable clips Figure 256 Disconnecting the retimer cables Step 6 Rotate down the SXM GPU board handle and clips so that they are away from the retimer assembly Figure 257 Closing the GPU L2A assembly clips and handle 320 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 329: ...d remove it out of the chassis Attention Keep the SXM GPU board clips and handle away from the retimer assembly to prevent damages to the retimer assembly Figure 258 Removing the retimer assembly Chapter 4 Hardware replacement procedures 321 ...

Страница 330: ... install the retimer assembly About this task Attention Read Installation Guidelines on page 121 and Safety inspection checklist on page 122 to ensure that you work safely Touch the static protective package that contains the component to any unpainted metal surface on the server then remove it from the package and place it on a static protective surface Watch the procedure A video of the installa...

Страница 331: ...Pull out the SXM GPU board latch outward until it stops b Rotate down the clips and handle so that they are away from the retimer assembly guide pins Figure 259 Adjusting the SXM GPU board Step 3 Align the retimer assembly with the four guide pins then attach the retimer assembly to the chassis and slide it down to secure it in place Attention Keep the SXM GPU board clips and handle away from the ...

Страница 332: ...XM GPU board latch inward to connect the SXM GPU board to the retimer assembly Figure 261 Connecting SXM GPU board to the retimer assembly Step 5 Connect the four cold plate assembly pump cables to the retimer assembly 324 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 333: ... assembly pump cables to the retimer assembly Step 6 Route the retimer assembly power cable through the cable clips and connect the power cable to the retimer assembly and the system board Chapter 4 Hardware replacement procedures 325 ...

Страница 334: ... board PCIe adapter distribution board power 2 connector For detailed information see System board connectors on page 34 Step 7 Route the eight retimer assembly signal cables through the cable clips and connect the signal cables to the retimer assembly and the system board 326 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 335: ...D PCIe connector 7 MCIO connector E PCIe connector 6 MCIO connector F PCIe connector 5 MCIO connector G PCIe connector 4 MCIO connector H PCIe connector 3 For detailed information see System board connectors on page 34 Step 8 Install the cross bar a Place the cross bar on top of the radiator b Fasten the four screws to secure the cross bar to the chassis Chapter 4 Hardware replacement procedures 3...

Страница 336: ...ment do the following 1 Ensure that all components have been reassembled correctly and that no tools or loose screws are left inside your server 2 Properly route and secure the cables in the server Refer to the cable connecting and routing information for each component 3 Reinstall the air baffle See Install the air baffle on page 135 Attention For proper cooling and airflow reinstall the air baff...

Страница 337: ...are See Firmware updates on page 9 Update the UEFI configuration See https thinksystem lenovofiles com help topic dcg_uefi overview_ dcg_uefi html Reconfigure the disk arrays if you have installed or removed a hot swap drive or a RAID adapter See the Lenovo XClarity Provisioning Manager V3 User Guide at https sysmgt lenovofiles com help topic lxpm_frontend lxpm_v3_about html Chapter 4 Hardware rep...

Страница 338: ...330 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 339: ... are using some other management application begin with the Lenovo XClarity Controller event log Event logs An alert is a message or other indication that signals an event or an impending event Alerts are generated by the Lenovo XClarity Controller or by UEFI in the servers These alerts are stored in the Lenovo XClarity Controller Event Log If the server is managed by the Chassis Management Module...

Страница 340: ... supply voltages fan speeds and component status The Lenovo XClarity Controller provides various interfaces to systems management software and to system administrators and users to enable remote management and control of a server The Lenovo XClarity Controller monitors all components of the server and posts events in the Lenovo XClarity Controller event log Figure 267 Lenovo XClarity Controller ev...

Страница 341: ...stalled or the LED itself has failed Flashing rapidly four times per second Green The server is turned off and is not ready to be turned on The power button is disabled This will last approximately 5 to 10 seconds Flashing slowly once per second Green The server is turned off and is ready to be turned on You can press the power button to turn on the server Lit Green The server is turned on 2 Netwo...

Страница 342: ... server is on and is working correctly None External LCD diagnostics handset The external LCD diagnostics handset is an external device that is connected to the server with a cable and it allows quick access to system information such as errors system status firmware network and health information Location of the external LCD diagnostics handset Location Callouts The external LCD diagnostics hands...

Страница 343: ...te When unplugging the external handset see the following instructions Press the plastic clip on the plug forward Hold the clip and remove the cable from the connector Chapter 5 Problem determination 335 ...

Страница 344: ...splay and 5 navigation buttons 1 LCD display 2 Scroll buttons up down left right Press the scroll buttons to locate and select system information 3 Select button Press the select button to select from the options in the menu 336 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 345: ...l LCD diagnostics handset displays various system information Navigate through the options with the scroll keys Depending on the model the options and entries on the LCD display might be different Chapter 5 Problem determination 337 ...

Страница 346: ...338 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 347: ...lerts Sub Menu Example Home screen Active error quantity Note The Active Alerts menu displays only the quantity of active errors If no errors occur the Active Alerts menu will not be available during navigation 1 Active Alerts Details screen Error message ID Type Error Warning Information Occurrence time Possible sources of the error Active Alerts 1 Press to view alert details FQXSPPU009N Error 04...

Страница 348: ... number Release date XCC Backup Active Build D8BT05I Version 1 00 Date 2019 12 30 XCC Network Information Sub Menu Example XCC hostname MAC address IPv4 Network Mask IPv4 DNS IPv6 Link Local IP Stateless IPv6 IP Static IPv6 IP Current IPv6 Gateway IPv6 DNS Note Only the MAC address that is currently in use is displayed extension or shared XCC Network Information XCC Hostname XCC xxxx SN MAC Addres...

Страница 349: ... Generate Download FFDC Service Data Request XCC Reset This will request the BMC to reboot itself Hold for 3 seconds Power supply LEDs This topic provides information about various power supply LED status and corresponding action suggestions The following minimum configuration is required for the server to start Two processors in socket 1 and 2 Two DRAM memory modules in slots 14 and 30 Two power ...

Страница 350: ... is off replace the power supply Slow blinking green about one flash every two seconds The power supply is in cold redundancy active mode Fast blinking green about 2 flashes each second The power supply is in cold redundancy sleep mode Green The server is on and the power supply is working normally 3 Fault LED Off The power supply is working normally Amber The power supply has failed To resolve th...

Страница 351: ...oller event log and the system error log for information about the error Save the log if necessary and clear the log afterwards 2 XCC heartbeat LED green This LED indicates XCC heartbeat and boot process LED blinking fast XCC code is in the loading process LED going off momentarily XCC code has loaded completely LED going off momentarily and then starts blinking slowing XCC is fully operational Yo...

Страница 352: ...ated in the PCIe slots Replace the cable Trained technician only replace the system board See System board replacement trained technician only on page 214 6 Processor 1 error LED LED on an error has occurred to the processor the LED represents 7 DIMM 1 32 error LED amber LED on an error has occurred to the DIMM the LED represents 8 Fan 1 5 error LED LED on an error has occurred to the fan the LED ...

Страница 353: ...ed the PFR Platform Firmware Resilience error LED off PFR XCC UEFI verification passed LED on one or more PFR XCC UEFI content verification failed and is unable to recover Trained technician only replace the system board See System board replacement trained technician only on page 214 General problem determination procedures Use the information in this section to resolve problems if the event log ...

Страница 354: ...ee Power supply LEDs on page 341 to replace the components in the minimum configuration one at a time until the problem is isolated Resolving suspected Ethernet controller problems The method that you use to test the Ethernet controller depends on which operating system you are using See the operating system documentation for information about Ethernet controllers and see the Ethernet controller d...

Страница 355: ...ith the Lenovo XClarity Controller event log For more information about event logs see Event logs on page 331 2 Review this section to find the symptoms that you are experiencing and follow the suggested actions to resolve the issue 3 If the problem persists contact support see Contacting Support on page 369 Power on and power off problems Use this information to resolve issues when powering on or...

Страница 356: ...ectrical outlet The type of memory that is installed is correct and the installation rules are met The DIMMs are fully seated with lock latches fully closed The LEDs on the power supply do not indicate a problem The processors are installed in the correct sequence 5 Reseat the following components a Operator information panel connector b Power supplies 6 Replace the following components and restar...

Страница 357: ...seconds before restarting the server 1 Make sure that No error LEDs are lit on the operator information panel No memory module error LEDs are lit on the system board Memory mirrored channel does not account for the discrepancy The memory modules are seated correctly You have installed the correct type of memory module see PMEM rules in Setup Guide for requirements After changing or replacing a mem...

Страница 358: ...a channel identified as failing Note Each time you install or remove a memory module you must disconnect the server from the power source then wait 10 seconds before restarting the server Complete the following procedure to solve the problem 1 Reseat the memory modules then restart the server 2 Remove the highest numbered memory module of those that are identified and replace it with an identical ...

Страница 359: ... Press to Disable Security and input passphrase to disable security Setup Utility Go to System Configuration and Boot Management System Settings Intel Optane PMEMs Security Press to Disable Security and input passphrase to disable security 4 Delete namespaces with command corresponding to the operating system that is installed Linux command ndctl destroy namespace all f Windows Powershell command ...

Страница 360: ...PMEMs are installed in wrong slots AC the system or restart XCC to solve this problem Cannot create goal successfully when installing PMEMs to the system for the first time When seeing ones of the following messages ERROR Cannot retrieve memory resources info ERROR One or more PMEM modules do not have PCD data A platform reboot is recommended to restore valid PCD data Complete the following steps ...

Страница 361: ... until the problem is solved 1 Verify that the drive is supported for the server See https static lenovo com us en serverproven index shtml for a list of supported hard drives 2 Make sure that the drive is seated in the drive bay properly and that there is no physical damage to the drive connectors 3 Run the diagnostics tests for the SAS SATA adapter and hard disk drives When you start a server an...

Страница 362: ...order shown restarting the server each time a Monitor b Video adapter if one is installed c Trained technician only System board Screen goes blank when you start some application programs 1 Make sure that The application program is not setting a display mode that is higher than the capability of the monitor You installed the necessary device drivers for the application The monitor has screen jitte...

Страница 363: ...n The mouse option is enabled in the Setup utility 2 If you are using a USB mouse and it is connected to a USB hub disconnect the mouse from the hub and connect it directly to the server Try to install the USB mouse into a different USB port as available 3 Replace the mouse KVM switch problems 1 Make sure that the KVM switch is supported by your server 2 Make sure that the KVM switch is powered on...

Страница 364: ...chnical support A Lenovo optional device that was just installed does not work 1 Make sure that The device is supported for the server see https static lenovo com us en serverproven index shtml You followed the installation instructions that came with the device and the device is installed correctly You have not loosened any other installed devices or cables You updated the configuration informati...

Страница 365: ...this information to solve intermittent problems Intermittent external device problems on page 357 Intermittent KVM problems on page 357 Intermittent unexpected reboots on page 358 Intermittent external device problems Complete the following steps until the problem is solved 1 Update the UEFI and XCC firmware to the latest versions 2 Make sure that the correct device drivers are installed See the m...

Страница 366: ...stems will be using different method Enter the UEFI setup menus and disable the feature or disable it with the following OneCli command OneCli exe config set SystemRecovery RebootSystemOnNMI Disable bmcxcc_userid PASSW0RD xcc_ipaddress 3 See the management controller event log to check for an event code that indicates a reboot See Event logs on page 331 for information about viewing the event log ...

Страница 367: ...the POST Event Viewer when it is turned on on page 360 Server is unresponsive POST is complete and operating system is running on page 360 Server is unresponsive cannot press F1 to start System Setup on page 360 Voltage planar fault is displayed in the event log on page 361 Unusual smell on page 361 Server seems to be running hot on page 361 Cracked parts or cracked chassis on page 361 Server hang...

Страница 368: ...e that any new software has been installed and configured correctly 5 Contact your place of purchase of the software or your software provider If you are accessing the server from a remote location complete the following steps 1 Make sure that all applications are running no applications are hung 2 Attempt to log out of the system and log back in 3 Validate the network access by pinging or running...

Страница 369: ...m newly installed equipment 2 If the problem remains contact Lenovo Support Server seems to be running hot Complete the following steps until the problem is solved Multiple server or chassis 1 Make sure that the room temperature is within the specified range see Specifications on page 1 2 Make sure that the fans are installed correctly 3 Update the UEFI and XCC firmware to the latest versions 4 Ma...

Страница 370: ...r Other software works on the server The software works on another server 2 If you receive any error messages while you use the software see the information that comes with the software for a description of the messages and suggested solutions to the problem 3 Contact your place of purchase of the software 362 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 371: ...re disassembling the system board 1 Remove the system board from the server See Remove the system board on page 215 2 Refer to local environmental waste or disposal regulations to ensure compliance Procedure Step 1 Remove the following components as illustrated Two spacers 8 mm wrench Four guide pins 7 mm wrench One plunger 5 8 wrench for top side 7 16 wrench for bottom side Two hex nuts 5 mm wren...

Страница 372: ...ver Figure 272 Disassembling the system board Step 3 Remove the following components as illustrated Four screws PH 2 screwdriver Step 4 Separate the system board from the supporting sheet metal Figure 273 Disassembling the system board 364 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 373: ...e instructions in this section to disassemble the retimer assembly before recycling About this task Before disassembling the retimer assembly 1 Remove the retimer assembly from the server See Remove the retimer assembly on page 318 2 Refer to local environmental waste or disposal regulations to ensure compliance Appendix A Hardware disassembling for recycle 365 ...

Страница 374: ...2 screwdriver Step 2 Separate the retimer assembly from the supporting sheet metal Figure 274 Disassembling the retimer assembly After you finish After disassembling the system board recycle the unit in compliance with local regulations 366 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 375: ...g location http thinksystem lenovofiles com help index jsp You can take these steps to try to solve the problem yourself Check all cables to make sure that they are connected Check the power switches to make sure that the system and any optional devices are turned on Check for updated software firmware and operating system device drivers for your Lenovo product The Lenovo Warranty terms and condit...

Страница 376: ...n a new diagnostic to collect new data Lenovo XClarity Controller You can use the Lenovo XClarity Controller web interface or the CLI to collect service data for the server The file can be saved and sent to Lenovo Support For more information about using the web interface to collect service data see http sysmgt lenovofiles com help topic com lenovo systems management xcc doc NN1ia_c_ servicesandsu...

Страница 377: ...t to obtain help for your issue You can receive hardware service through a Lenovo Authorized Service Provider To locate a service provider authorized by Lenovo to provide warranty service go to https datacentersupport lenovo com serviceprovider and use filter searching for different countries For Lenovo support telephone numbers see https datacentersupport lenovo com supportphonelist for your regi...

Страница 378: ...370 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 379: ...n new editions of the publication Lenovo may make improvements and or changes in the product s and or the program s described in this publication at any time without notice The products described in this document are not intended for use in implantation or other life support applications where malfunction may result in injury or death to persons The information contained in this document does not ...

Страница 380: ...ve bays with the largest currently supported drives that are available from Lenovo Maximum memory might require replacement of the standard memory with an optional memory module Each solid state memory cell has an intrinsic finite number of write cycles that the cell can incur Therefore a solid state device has a maximum number of write cycles that it can be subjected to expressed as total bytes w...

Страница 381: ...ference suppression devices that are supplied with the monitor Additional electronic emissions notices are available at http thinksystem lenovofiles com help index jsp Taiwan BSMI RoHS declaration Taiwan import and export contact information Contacts are available for Taiwan import and export information Appendix C Notices 373 ...

Страница 382: ...374 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 383: ...ation E 101 SXM GPU Model 106 Configuration F 108 Configuration G 114 cables connecting and routing to the server 57 CMOS battery CR2032 installing 138 removing 136 replacing 136 collecting service data 368 common components 133 replacing 133 complete parts replacement 328 connecting cables to the server 57 connectors 58 contamination particulate and gaseous 8 cover installing 226 removing 225 rep...

Страница 384: ...s 121 installing 2 5 inch drive backplane 234 2 5 inch drive backplane 274 2 5 inch drive backplane module 271 2 5 inch drive cage assembly 237 269 2 5 inch hot swap drive 230 265 3 5 inch drive backplane 234 3 5 inch drive cage assembly 237 3 5 inch hot swap drive 230 air baffle 135 CMOS battery CR2032 138 cover 226 DRAM memory module 175 drive 241 265 EDSFF drive backplane 245 EDSFF drive cage a...

Страница 385: ... 187 replacing 183 PCIe riser installing 189 removing 183 replacing 183 PCIe riser board installing 193 removing 192 replacing 192 PDB installing 196 removing 194 replacing 194 PHM installing 206 removing 200 replacing 200 separating 204 PMEM Persistent Memory installing 175 removing 173 replacing 172 power problems 358 power button 26 power cords 55 power distribution board installing 196 removin...

Страница 386: ...2 5 inch drive backplane 273 2 5 inch drive backplane module 270 2 5 inch drive cage assembly 236 267 2 5 inch hot swap drive 228 264 3 5 inch drive backplane 232 3 5 inch drive cage assembly 236 3 5 inch hot swap drive 228 air baffle 133 CMOS battery CR2032 136 common components 133 cover 225 DRAM memory moduel 172 drive 264 EDSFF drive backplane 244 EDSFF drive cage assembly 246 EDSFF hot swap d...

Страница 387: ...n board installing 314 removing 312 replacing 312 system board connectors 34 disassemble 363 install 218 recycle 363 removing 215 replacing 214 system error LED 26 system ID button 26 system ID LED 26 system reliability guidelines 123 system board layout 34 system board LED 342 T Taiwan BSMI RoHS declaration 373 Taiwan import and export contact information 373 Tech Tips 13 telecommunication regula...

Страница 388: ...380 ThinkSystem SR670 V2 Maintenance Manual ...

Страница 389: ......

Страница 390: ......

Отзывы: