1. Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 174
).
2. Power on the server; then, reset date, time, and all the passwords.
EIA bracket replacement
See these topics to learn how to remove, install and adjust the EIA brackets.
Remove the EIA brackets
See this topic to learn how to remove the EIA brackets.
About this task
Attention:
• Go over
“Installation Guidelines” on page 41
to ensure that you work with safety.
• Turn off the server and peripheral devices and disconnect the power cords and all external cables (see
“Power off the server” on page 13
).
• If the server is installed in a rack, slide the server out on its rack slide rails to gain access to the top cover,
or remove the server from the rack.
Watch the procedure.
A video of this procedure is available from the following link:
•
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DV_Ja2E7l6T-lwN_IrnJRk
Procedure
Step 1. Remove the six screws that secure each of the EIA brackets to the chassis, and remove the
brackets from the chassis.
.
Hardware replacement procedures
63
Содержание 7D8T
Страница 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Страница 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Страница 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Страница 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Страница 72: ...Figure 43 EIA bracket regular depth Figure 44 EIA bracket maximal depth 64 ThinkEdge SE450 Maintenance Manual ...
Страница 75: ...Figure 47 Remove the mylar Figure 48 EIA bracket maximal depth Chapter 3 Hardware replacement procedures 67 ...
Страница 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Страница 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Страница 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Страница 217: ......
Страница 218: ......