1. Read the safety information and installation guidelines (see
).
2. Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
3.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=
PLYV5R7hVcs-B2y7oAb54mfyuLrIusa_qE
.
To install a hot-swap fan, complete the following steps:
Step 1. Align the fan over the fan slot in the fan cage assembly.
Figure 48. Hot-swap fan installation
Step 2. Insert the fan into the fan cage assembly until it clicks into place.
Attention:
When replacing a fan with power on, complete the replacement within 30 seconds to
ensure proper operation.
After installing the hot-swap fan, complete the following steps:
1. Reinstall the top cover (see
“Install the top cover” on page 134
2. Install the server in the rack.
Front VGA assembly replacement
Use this procedure to remove or install the front VGA assembly.
Remove the front VGA assembly
Use this procedure to remove the front VGA assembly.
Before removing the front VGA assembly:
64
ThinkSystem SR850P Maintenance Manual
Содержание 7D2F
Страница 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Страница 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Страница 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Страница 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Страница 187: ......
Страница 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...