3. Make sure all the removed components are installed, and all the disconnected cables are reconnected.
To install the top cover, complete the following steps:
Step 1. Press and hold on the blue tab of cover release latch; then, rotate the tip of the latch up.
Step 2. Place the top cover on top of the server with both sides aligned.
Step 3. Push the latch down until it clicks in place.
Figure 129. Top cover installation
After installing the top cover, complete the following steps:
1. Reconnect the power cords and any cables that you removed.
2. Install the server in the rack.
3. Power on the server and any peripheral devices.
Complete the parts replacement
Use this information to complete the parts replacement.
To complete the parts replacement, do the following:
1. Ensure that all components have been reassembled correctly and that no tools or loose screws are left
inside your server.
2. Properly route and secure the cables in the server. Refer to the cable connecting and routing information
for each component.
3. If you have removed the server cover, reinstall it. See
“Install the top cover” on page 134
.
4. Reconnect external cables and power cords to the server.
Attention:
To avoid component damage, connect the power cords last.
5. Update the server configuration.
.
Hardware replacement procedures
135
Содержание 7D2F
Страница 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Страница 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Страница 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Страница 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Страница 187: ......
Страница 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...