ThinkSystem Friction 2-Post Screw-in Rail Kit

Read guidelines first

Review the documentation that comes with the rack for safety and cabling information. Before you install the 
server in a rack, read the following guidelines:

•  Some illustrations might differ from your server. All types of server are removed and installed in a similar 

manner.

•  See the 

Maintenance Manual 

for the maximum room air temperature.

•  Do not block any air vents, usually 15 cm (6 inches) of air space provides proper airflow.

•  Plan the device installation starting from the bottom of the rack.

•  Install the heaviest device in the bottom of the rack.

•  Do not extend more than one device out of the rack at the same time.

•  Do not place any objects on the top of the rack-mounted devices.

•  Connect all power cords to properly wired and grounded electrical outlets.

•  Do not overload the power outlet when installing multiple devices in the rack.

•  The maximum width of the mounting flange is 225.6 mm (8.9 inches).

Safety notice 

CAUTION: 
Make sure the rails support your server model and use 
safe practices when lifting

1

1

Содержание 7D1R

Страница 1: ...ually 15 cm 6 inches of air space provides proper airflow Plan the device installation starting from the bottom of the rack Install the heaviest device in the bottom of the rack Do not extend more than one device out of the rack at the same time Do not place any objects on the top of the rack mounted devices Connect all power cords to properly wired and grounded electrical outlets Do not overload ...

Страница 2: ...ort see the following website https en resources lenovo com brochures thinksystem rail support matrix Part number Find the rail part number on the label as shown use the part number to identify your rail model in the Rail Support Matrix above 1 Part number 10 digits 2 2 ...

Страница 3: ...ument 2 Left rail 3 Right rail 4 Nine M5 screws for square hole and round hole rack 5 Nine cage nuts for square hole rack 6 Nine clip nuts for round hole rack 7 Nine 10 32 screws for threaded rack 8 Nine 12 24 screws for threaded rack 9 Four screws 3 3 ...

Страница 4: ...te The graphic shown below is the right rail Step 1 Pull the inner rail outward until you see the release latch Step 2 Press the release latch Step 3 Pull out the inner rail away from the outer rail Step 4 Repeat step 1 3 on the left rail 4 4 ...

Страница 5: ...erver lock into place with the inner rail Step 3 Repeat step 1 2 on the left rail Notes Make sure the stamp Front always face toward the front when assembling the inner rail to the server or to the slide rail assembly The number of the rail mounting pins on the side of the server might be different from the illustration depending on the server model Step 4 Insert and fasten the four screws on the ...

Страница 6: ...79 mm 4 Server depth 725 mm 805 mm Note Based on the server dimension you may need to adjust the bracket to make sure the center of gravity of the server is within the rails The steps are listed as below Step 1 Move rear sliding bracket to the back as shown Step 2 Pull the pins of front sliding bracket Step 3 Slide the front bracket so the pins lock into the corresponding holes on the rails 6 6 ...

Страница 7: ...ts to Rack Note For threaded rack skip to the next page for Step 5 For round hole rack install clip nuts to the rack as shown 1 Clip nut For square hole rack install cage nuts to the rack as shown 1 Cage nut 7 7 ...

Страница 8: ...clip nuts For threaded rack use only 10 32 or 12 24 screws depending on the rack Step 1 Align the rail with the rack and install the screws to secure the front side of the rail Step 2 Adjust the rear sliding bracket against the rack then install the screws to secure the rail Step 3 Repeat step 1 2 on the left rail 1 Screws installation on the front side of the rack 2 Screws installation on the rea...

Страница 9: ...ift the server and align the server with the slide rails Position the server as shown and push the server into the rack Step 2 Press the release latches Step 3 Push the server all the way into the rack until the server locks into place with a click 9 9 ...

Страница 10: ... optional Secure the server before you move the rack or place the rack in a vibration prone area Open the rack release latches and tighten the screws to firmly secure the system 1 Rack release latches 2 Front Screw 1 10 0 ...

Страница 11: ...when performing Step 3 Step 1 Disconnect all cables from the rear of the server Open the rack release latch in the front of the server and loosen the front screws then slowly slide the server out until it stops Step 2 Press the release latches Step 3 Carefully pull the server out of the rack 1 11 1 ...

Страница 12: ...are the property of their respective owners LIMITED AND RESTRICTED RIGHTS NOTICE If data or software is delivered pursuant to a General Services Administration GSA contract use reproduction or disclosure is subject to restrictions set forth in Contract No GS 35F 05925 Printed in China 1P P N SP47A46592 1PSP47A46592 ...

Отзывы: