background image

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

10

Locking Band

Mastic

Roof Ridge

120

°

Step 8. The standard Security Chimneys  FTF10
roof flashing assemblies include a storm collar.
Slide the storm collar over outer chimney, rest
on flashing spacers and align with top surface
of flashing. Insert tab in slot, pull tight and bend
tab back over slot. Seal storm collar to outer
chimney with roof caulking or mastic around
entire circumference of pipe. Also add extra
roof caulking to the tab/slot area to seal com-
pletely against water penetration (

Figure 30 ).

Check all joints very carefully to ensure no
water intrusion can take place.

Figure 31

Figure 29

Step 7. Secure flashing by nailing along the
perimeter into roof using 8d nails. If shingled
roof, slide upper end and sides of roof flashing
under shingles (trim if necessary), seal the top
and both sides of the flashing to the roof with
roof caulking. Cover nail heads with roof caulk-
ing (

Figure 29 ).

Figure 30

Step 9. Security Chimneys locking bands,
Model FLB, may be required if the chimney
extends too high above the roof flashing.  As
a general rule, if the chimney extends more
than 6' above the roof flashing, the use of
locking bands is advisable to strengthen the
chimney assembly.  Align the locking band at
the chimney joint. Locking bands wrap around
pipe joints equally covering the joints of both
pipe sections.

Step 10. Using the FTF10-CTDTM Round
Termination:

1. Hold CTDTM over top of last chimney section
(

Figure 32 ).

2. Center inner slip section in inner flue pipe-
slip down.

3. Center outer locking section over outer flue
pipe. Push down until locking tabs are firmly
engaged.

4. Pull up slightly on CTDTM to ensure locking
joint has firmly engaged.

Figure 33

Note: It is recommended that all exterior ex-
posed related metal fireplace components; such
as terminations, flashings, storm collars and/
or flue be painted with a premium-quality, high-
temperature, rust-preventative paint designed
for metal. This is especially important when
installations are made in abnormally adverse or
corrosive environments; such as near lakes,
oceans or in areas with consistently high-hu-
midity conditions. Consult the paint manufac-
turers instructions for proper preparation and
application.

For Canadian installations, all chimney installed
outside the building must be galvalume (outer
sections only), effective January 1, 1992. The
appropriate model designations (with a “C”
suffix) are located in the back of this manual.

TEN-FOOT RULE SUMMARY

The minimum chimney height above the roof
and/or to adjacent walls and buildings is speci-
fied by all major building codes.

If the horizontal distance from the peak of the
roof is less then 10' (3 m), the top of the
chimney must be at least 2'  (610 mm) above
the peak of the roof.

If the horizontal distance from the chimney
edge to the peak of the roof is more than 10'
(3 m), a chimney height reference point is
established on the roof surface 10' (3 m) hori-
zontally from the chimney edge. The top of the
chimney must be at least 2' (610 mm) above
this reference point. In all cases, the chimney
cannot be less than 3' (914 mm) above the roof
at the edge of the chimney.

The 2' in 10' rule is necessary in the interest of
safety, but does not ensure smoke-free opera-
tion. Trees, buildings, adjoining roof lines, ad-
verse wind conditions, etc., may require a taller
chimney should the fireplace not draft properly
(

see Figure 35 ).

FTF10-CT2RS

Termination

2" (51mm) Min.

Air Space to

Combustibles

Studs

Above

Roof

20"

(508mm)

Use the nut provided and TIGHTEN snugly. Do
not overtighten as this might damage the chim-
ney section (

refer to Figure 30 ).

Note: If chimney extends more than 8' above
roof surface, guy wires are also recommended.
Use three (3) guy wires, attach to locking band
assembly, extend and secure to roof in a trian-
gular pattern (Figure 31 ). Guy wires are not
supplied by the manufacturer.

Figure 32

Using a CT2 Chase Termination

Refer to specific installation instruction included
with the CT2 chase termination for clearance
statements and installation details.

Содержание COLONIAL COL-3629

Страница 1: ...nstructions before beginning your installation Do not alter or modify the fireplace or its components under any circumstances Any modification or alteration of the fireplace system including but not l...

Страница 2: ...ur distributor or qualified factory representative to ensure safe condition When in doubt con sult your distributor 16 For additional safety considerations and complete operating instructions refer to...

Страница 3: ...llationinresidentialhomesandbuildingsof conventionalconstruction notinmobilehomes These fireplace systems are designed for in stallation in accordance with the National Fire Protection Standard for ch...

Страница 4: ...n Note Non Combustible Chase Flashing Must be Used to Cover Chase Opening Optional Insulation in Outside Walls of Chase Solid Continuous Surface Outside Base Insulation Thermal Barrier 8 2 4m Level He...

Страница 5: ...ng Usually no special floor support is needed for the fireplace however to be certain 1 Estimate the total weight of the fireplace system including chimney and surround ma terials such as brick stone...

Страница 6: ...THEM Step 4 Fireplace may be anchored to floor Bend down four 4 anchor tabs located at the base of the fireplace and secure to the floor by nailing with 8d nails Figure 10 Note The Z type safety stri...

Страница 7: ...7 445 mm K 67 1702 mm Framing Dimensions Figure 16 Flue Type A B FTF10 19 19 Vertical 483 mm 483 mm FTF10 30 19 29 Offset 483 mm 737 mm Framing Dimensions for Ceiling Figure 14 Figure 15 Pitch C D 0 1...

Страница 8: ...ward Ensure nothing blocks the hood opening This air duct must never terminate higher than the chimney Step 9 Cut or frame hole through the outside wall for the installation of the duct inlet hood A 4...

Страница 9: ...tenoughtopen etrate the roof flashing openings Figure 26 Always maintain 2 minimum air space to com bustiblematerialsandalwayscheckeachchim ney joint inner and outer to ensure proper engagement Checkv...

Страница 10: ...ntative paint designed for metal This is especially important when installationsaremadeinabnormallyadverseor corrosive environments such as near lakes oceans or in areas with consistently high hu midi...

Страница 11: ...sfromtotaldesiredheight Reference Vertical Elevation Chart and deter minethenumberofchimneysections quantity and length required SPECIAL OFFSET INSTRUCTIONS To clear any overhead obstructions you may...

Страница 12: ...3 Use Elevation Chart as job estimator only Add necessary firestop spacers and sta bilizers as required Firestop spacers must be used as shown in Figures 21 and 22 and stabilizers as shown in Figure...

Страница 13: ...171 14 3 0 0 5 182 15 2 1 0 5 188 15 8 0 1 5 192 16 0 2 0 5 198 16 6 1 1 5 206 17 2 0 0 6 215 17 11 1 0 6 222 18 6 0 1 6 226 18 10 2 0 6 232 19 4 1 1 6 240 20 0 0 0 7 250 20 10 1 0 7 256 21 4 0 1 7 FT...

Страница 14: ...s install the same way as round terminations and stabilizers Step 1 Hold return elbow over top of last chimney section Step 2 Center inner slip section into inner flue pipe slip down Step3 Centerouter...

Страница 15: ...line connects to a gas shut off valve recessed flush into the wall or floor The valve should be controlled by a removable valve key for safety Always plumb gas line installation per local codes Check...

Страница 16: ...BTU IN FT2 HR F At no time may a perpendicular side wall be located closer than 9 from the fireplace opening If fireplace is installed diagonally across a 90 corner no wall shields are required Figure...

Страница 17: ...4 2 3 4 Cultered Stone Hearth stone 2 82 355 3 36 3 3 8 Wonderboard 3 23 31 3 85 3 7 8 Super Firetemp M Johns Manville 61 1 64 73 3 4 Super Firetemp L Johns Manville 54 1 85 64 5 8 Face brick 9 00 111...

Страница 18: ...er any problems or have ques tions concerning the installation or application of this system please contact your distributor For the name of your nearest distributor call LENNOX HEARTH PRODUCTS 1110 W...

Страница 19: ...2 Firestop Spacer Flat 63L36 F10FS 2 Chase Termination Square 63L52 FTF10 CT2RS INSTALLATION COMPONENTS Firestop Spacer 30 63L37 F10FS30 2 Round Termination 63L55 FTF10 CTDTM Termination Shroud 63L56...

Страница 20: ...at any time without notice in design materials specifications prices and also to discontinue colors styles and products Consult your local distributor for fireplace code information Printed in U S A...

Отзывы: