Adjustments
73
The lower the upper control link is
mounted on the implement's three-point
tower, the greater the pressure load on
the rollers – resulting in better intake be-
haviour.
The higher the upper control link is
mounted on the implement's three-point
tower, the lower the pressure load on the
rollers – resulting in poorer intake behav-
iour.
If the pressure load is too low and the
recompacting or tilling effect of the rollers
is insufficient, the upper control link must
be mounted lower on the three-point
tower – resulting in better intake behav-
iour.
If the pressure load is too high and the
rollers clogged as a result or if they
plunge too far into the soil, the upper
control link must be mounted higher up
on the three-point tower – resulting in
poorer intake behaviour.