Legrand PDU User Guide 111
Button
Function
Restores to the default sequence
Next time when power cycling the Legrand PDU, it will turn on all outlets based on the new outlet order.
The new order also applies when performing the power-on or power-cycling operation on partial outlets.
To set a power-on delay for any outlet:
1. On the same outlets list, click the 'Delay' column of the outlet that requires a wait after it is turned on.
2. Type a new value in seconds.
3. Click
Save.
Legrand PDU will insert a power-on delay between the configured outlet and the one following it during the
power-on process.
Setting Non-Critical Outlets
Outlets that are turned off when load shedding is activated are called non-critical outlets. Outlets that are not
affected by load shedding are called critical outlets. See
Load Shedding Mode
(on page 112).
Per default, all outlets are configured as critical.
To determine critical and non-critical outlets:
1. On the Outlets page, click
> Load Shedding Setup.
2. To set non-critical outlets, select the checkboxes of those you want.
To select ALL outlets, select the topmost checkbox in the header row.
3. To turn non-critical outlets into critical ones, deselect their checkboxes.
To deselect ALL outlets, deselect the topmost checkbox in the header row.
4. Click
Save.
Tip: You can also set up non-critical outlet setting by configuring outlets one by one. See
Individual Outlet
Pages
(on page 114).
Содержание 1U
Страница 1: ...Legrand PDU User Guide Xerus Firmware v3 5 0 ...
Страница 2: ...Copyright 2019 Legrand Inc LG 0B v3 5 0 E January 2019 255 80 0054 00 ...
Страница 53: ...January 2019 Legrand PDU User Guide 53 ...
Страница 77: ...January 2019 Legrand PDU User Guide 77 4 Press to show the Network Cascading page ...