2. Slide
rail VC9110
straight out and off
VC9109 carrier
.
3. Remove
VH0461, ¼-20 X 3/8 SHCS
.
4. Slide
VC9109 carrier
towards main body and remove from carriage.
Assembly is in reverse order. Note that
VH0461
acts as a stop for
VC9103 slide
, you must
push the slide and jaws forward to reinstall
VH0461.
If the slide is
not pushed forward
during screw installation,
breakage
of the slide
will occur.
Spring and Pusher
1. Remove rail and carrier from tool as outlined above.
2. Slide
pusher assembly VC9112
to the end of the carrier, sliding the pusher completely
off with
spring VC9122
hooked over the edge. While holding the
pusher assembly
VC9112
stationary, push the end of the spring forward unhooking spring from tab on
pusher.