NEEDED BY INSTALLER
1) Required amount of salt
2) Hacksaw, Pipe Cutters or Cable Saw
3) Tape measure & Permanent Marker
4) Screwdrivers: Flat head & Phillips head
5) Drill with 6mm (1/4”) masonry-drill
bit for block or stucco
6) Voltmeter - To determine AC
voltage to Control Panel
7) Test kit for Chlorine/Bromine, Calcium
Hardness, pH, Total Alkalinity, and
Cyanuric Acid (stabilizer).
We recommend the
Taylor Technologies®
Model K-2005 Test Kit
8) P.V.C. Glue
9) P.V.C. Cleaner / Primer
10) Assorted P.V.C. Fittings & Pipe
11) Assorted Electrical Hookup
Components
12) Teflon tape or pipe joint compound
SUPPLIED BY LECTRANATOR
1) Residential Installation / Operation
Manual
2) Limited Warranty with Warranty Card
(Must Return)
3) LECTRANATOR Control Panel
4) • Chlorine/Bromine Production Cell
• Flow Detector With Tee
• Cell Unions
5) Salt test strips & vial with mounting
hardware.
Material Requirements For Installation
9
Section 2 a