
6 Preparation
TIP
Requirements for the assembly site:
1. Choose a vertical surface.
2. Choose a site with minimum dust and which is protected
from jet water.
3. Make sure that there is sufficient space at the assembly site.
10
LEAB Automotive GmbH
Thorshammer 6
24866 Busdorf
6 Preparation
LEAB Automotive GmbH