1.) Place the G300 directly against the foam ring input of the LSG.
Proper alignment can be observed by shining a flashlight into the
12" exit of the LSG and noting the G300 output nozzle is centered
in the LSG input.
2.) Connect the blue Twist lock connector into Custom port on the rear
panel of the G300. (Available on G300s with LSG option.)
3.) Power up the G300 by turning on the Mains switch.
Note that the G300 is in Fog mode, which is indicated by a flashing
'G ' on the remote display.
4.) Adjust remote interval control fully clockwise, until 'DEL' appears
on the display.
5.) Adjust remote duration control until desired delay is achieved.
This delay allows the liquid CO2 to purge the supply hose of CO2
gases ensuring only liquid is available for optimum cooling .
The recommended formula for calculating delay time is 1 sec. for
every three feet of supply hose.
6.) Adjust the remote flow rate to desired fog output level. It is
recommended to start at '16' and adjust accordingly. The
maximum recommended flow is :LSG High Flow rate is twenty. LSG Low Flow rate is
twenty-five .
LSG / G300 Operating Procedure
16
Содержание G150
Страница 1: ...v 12 15 00 G300 Operations Manual ...