Integral XT
YAWE0028 / 24/06/2016
Brief operating instructions
13
2.3
View of the device and connections
Integral XT 150
1
2
3
4
6
5
1
Main switch
2
Filling point for heat transfer liquid
3
Interface section
4
Mains cable
5
Drain point M16 x 1
6
Drain tap
Refer to page 19 for an illustrated side view of connections and taps.
Содержание Integral XT 150
Страница 2: ......
Страница 4: ......
Страница 164: ...Integral XT 162 YAWE0028 24 06 2016 Intentionally left blank ...
Страница 166: ......
Страница 167: ......