
Integral XT
YAWE0028 / 24/06/2016
Maintenance
127
9.3
Servicing and repair
−
Withdraw the mains plug before all service and repair work.
−
Repairs in the control section must be carried out only by specialists.
−
Keep to service and maintenance intervals. If servicing does not occur at the
stated intervals, then the manufacturer can no longer guarantee the safe opera-
tion of the thermostatic circulator.
9.3.1 Service intervals
System part
Mandatory for initial operation
and before any longer unsu-
pervised operation, then with
recommended frequency
Chapter
Comment
Complete device
External condition of the
device
Monthly
Heat transfer liquid
Analysis of heat transfer
liquid
Half-yearly (and as required)
(
þ
Heat transfer system
Sealing
Daily
External visual inspection
External hoses
Material fatigue
Monthly
External visual inspection
Cooling unit
Cleaning of air-cooled
condenser
Monthly
(
þ
Air-cooled thermostat
Cleaning the dirt trap
Monthly
(
þ
9.3.2.2.1) Water-cooled thermostat
Decalcifying the water
cooling circuit
Quarterly
(
þ
9.3.2.2.2) Water-cooled thermostat
Electronics
Over temperature protec-
tion
Quarterly
(
þ
Pressure indication
Quarterly
Zero-point check
Low level alarm / warning
Quarterly
(
þ
Содержание Integral XT 150
Страница 2: ......
Страница 4: ......
Страница 164: ...Integral XT 162 YAWE0028 24 06 2016 Intentionally left blank ...
Страница 166: ......
Страница 167: ......