Integral XT
40
Starting up
YAWE0028 / 24/06/2016
Switch on the main switch on the front
panel:
−
The green LED for "Mains ON" is lit,
−
and the unit starts its self-test. All display segments and symbols
appear for about 1 s.
−
Display of the current outflow temperature ,
−
The pump starts provided "Standby" or "Manual start" (
þ
Section
7.10.2) has not been programmed,
−
all values are accepted which were active before switch-off.
−
If the device has not been filled, this display appears. Then contin-
ue with Section 7.6 Filling, venting and degassing.
Check or set over temperature cut-off point:
−
The switching point is shown in the LED display on pressing the
key
.
−
Change over temperature cut-off (
þ
+
−
Top up with heat transfer liquid as required which is pumped out
due to filling up the external load.
−
Display for
LEUEL
(low level) appears when the expansion
vessel has too little liquid.
−
Red LED
above the fault triangle
flashes.
Self-test
88(((
°C
EXT
Act. val. outflow temp.
02%32
°C
Level alarm
LEUEL
°C
Overtemp. cut-off.
90
°C
Fill mode
FiLL
°C
Содержание Integral XT 150
Страница 2: ......
Страница 4: ......
Страница 164: ...Integral XT 162 YAWE0028 24 06 2016 Intentionally left blank ...
Страница 166: ......
Страница 167: ......