LaserBit Giga Series 4.3 page
19
6.3 Contents of a Laserbit GigaPRONTO link
•
2ps of
GigaPRONTO
heads
•
2ps of
LB ODIU
s (Outdoor Interconnection Unit) /the two grey plastic boxes/
•
ODIU accessories:
o
2ps of 276x110x1,5 metal plates
o
2x4ps of 6x40 spacers
o
2x4ps of 6x15 spacers
o
2x4ps of M6x70 flat sphere headed
screws
o
2x4ps of M5 nuts
o
2x4ps of spring washers
o
2x4ps of washers
o
2x4ps of ø8x48 wall plugs
o
2x4ps of M4,5x70 cross headed self-
tapping-screws
•
a manual CD
•
2ps of Alignment Base Units /a heavy, podgy, hub cap form metal appliances/
•
2x2ps of spacers
•
ABU accessories /in a plastic bag attached to the ABU/:
o
2x4ps of M8 nuts
o
2x4ps of 8mm spring washers
o
2x4ps of 8mm washers
•
accessories for the head fixing /on the legs
of the heads/
o
2x4ps of M8 nuts
o
2x4ps of 8mm spring washers
o
2x4ps of 8mm washers
7 Sites of installation
7.1 Key factors of operation
There are four key issues that the site survey has to shed light on. Proper system
operation cannot be guaranteed without satisfying all of the four requirements.
Clear line of sight
- The entire optical path between the two ends must be free
of any obstacles. It not only means that one has to see the other side, but other
possible sources of disturbance should also be taken into consideration. For
example there might be turbulence above the roofs and other constructions, and this
can cause fraction or scattering of the beam or snow accumulation on roofs too
close to the beam can influence or even interrupt communication.