background image

The Little Ann Assembly Instruction

By Laser Dollhouse Designs

Содержание Little Ann Assembly Instruction

Страница 1: ...The Little Ann Assembly Instruction By Laser Dollhouse Designs ...

Страница 2: ...bly Door Assembly Roof Assembly Subfloor Assembly S1 thru S4 2nd Floor Assembly 2A 2B Fretwork 1st and 2nd Floors Fence Assembly Window Frames Plexiglas 1st Floor Walls 1A 1E 1F Porch rails 1A 1B 1C Stairs Base Floor ...

Страница 3: ...ep 1 locate the Base floor and position as seen in Figure 1 Figure 1 Step 2 Locate Subfloor Assembly S1 thru S4 and insert S1 thru S4 tabs into Base floor matching Slots S1 S4 as seen in Figure 2 Figure 2 ...

Страница 4: ...t on top of assembled subfloor by aligning open slots to tabs Refer to figure 3 Figure 2 Figure 3 Step 4 Take 1A Wall and insert into slot 1A on first floor Then insert door assembly thru cutout for the door opening Refer to figure 4 and 5 Figure 4 Figure 5 ...

Страница 5: ...wo rectangle and one half circle Plexiglas cutouts and insert into openings from the interior side of wall Finally secure by placing the interior door frame in place Refer to figure 6 7 and 8 Figure 7 Figure 6 Figure 8 ...

Страница 6: ...Step 6 Take the porch rail 1A 1B and 1C and insert into slots 1A 1C Also place walls 1E and 1F into respective slots on first floor Refer to figure 9 Figure 9 ...

Страница 7: ...exterior of walls 1E and 1F Refer to figure 10 Figure 10 Step 8 Place window Plexiglas cutouts into cutouts of walls 1E and 1F from the interior side and then place interior frames to secure See figures 11 and 12 Figure11 Figure12 ...

Страница 8: ...cutout tabs to slots on top of first floor rails and walls See figures 13 Figure13 Step 10 Place second floor walls 2A and 2b into slots provided Refer to figure 14 Figure14 Step 11 Place window frame and Plexiglas into 2A as done with walls 1E and 1F See figure 15 Figure15 ...

Страница 9: ...aking sure the cut slots closest to the top are up as in figure 16 Note Two front cutout The most forward cutouts closest to the top is right side up facing Figure16 Step 13 Place fretwork into roof by matching tabs and slots See figure 17 Figure17 ...

Страница 10: ... slots Refer to figure 18 Figure18 Step 15 Locate the post as seen in figure 19 This post fits to the front right forward corner Place fence rail as seen in figure 20 into the side of post and into base Once in place should be as in figure 21 Figure19 Figure20 Figure21 ...

Страница 11: ...t Next locate post as seen in figure 23 and insert fence and post to base The circle to hold functioning gate should be at bottom Figure22 Figure23 Step 17 Locate final fence rail with swing gate along with remaining side fence and insert into base as seen in figure 24 Figure24 ...

Страница 12: ...embly and place within fence as seen in figure 25 Figure25 Step 19 Install shingles to house Shingles align first set to bottom of roof panel Next shingle aligns to the top line of lower shingles as seen in figure 26 Figure26 ...

Страница 13: ...Laser Dollhouse Designs www laserdollhouses com Email laserdollhouses aol com ...

Отзывы: